DPO: Texas

Planned
Future facility in planning stage
Operated by:

DPO: Texas

Year Planned: 2027

Digital Power Optimization partners with Schneider for data centers at Texas wind farms. Together with Schneider Electric, DPO will customize modules (likely Schneider's EcoStruxure offering) for deployment at utility-scale wind sites to support its Power Purchase Agreement (PPA) and related data center build-out.

Map and Nearby Locations

Texas
Digital Power Optimization (DPO) Sites
Nearby Facilities

DPO: Texas Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of DPO: Texas

Distance Site About
1.16 miles University of Texas: Austin
The Texas Advanced Computing Center (TACC) on the Austin campus hosts a 26,000 sq ft Tier III data center.
1.22 miles American Tower: Austin
In 2020, Communications infrastructure company American Tower launched its Edge data center in Austin, Texas.
1.30 miles Lumen Austin 3 (500 Chicon)
1.39 miles LOGIX Austin (1905 E 6th)
Acquired by LOGIX, the Alpheus site is east of Austin's central business district. Located on East 6th Street, it features a multiple carrier Internet backbone, dual backup power supplies
2.50 miles Verizon: 2100 HWY 35
Former XO Communications site
4.38 miles LightEdge Austin1 Montopolis
OnRamp Staffs the site 24/7/365 Power Densities up to 30kW / Rack Outside of 100 year and 500 Year Flood Plains
4.38 miles Lumen Austin 4
4.48 miles Core Scientific: Austin, TX
In 2024, Core Scientific acquired this facility in Austin, Texas. The site was formerly used to house Hewlett Packard's hosting business, including high-performance computing.
4.49 miles CoreWeave: Austin, TX
CoreWeave has secured an 8-year lease agreement with Core Scientific for a 118,000 square feet of compute space at 3301 Hibbetts Road in Austin, Texas.
4.76 miles CyrusOne Austin I
Also known as the Austin Met Center. CyrusOne has announced that this facility will close. Customers will be moved to other CyrusOne sites in Austin.
4.77 miles Switch: Austin 1 (ADC)
Operated since 2003. Austin 1 is located on the Southeast side of Austin, on Data Foundry’s Disaster Recovery Campus.
4.85 miles 7401 E Ben White - Digital Realty
7401 E. Ben White Blvd. is a three-building portfolio comprised of two single-story data centers and one single-story call center, which are located in southeast Austin.
4.87 miles 7620 Metro - Digital Realty
The Digital facility is on 11.28 acres of land and features a 62,000-sq-ft building. The data center is full, with 100% of the space occupied with long-term lease tenants but there is additional land build another 135,000 sq ft facility.
4.96 miles Digital Realty: AUS11
The building has 75,000 gross square feet with a 30-foot clearance height capable of supporting two floors inside the building. The site has diverse underground electrical ductbanks from a nearby substations. The facility offers access to seven fiber optic providers in close proximity to the building
5.14 miles CyrusOne: Austin III
CyrusOne's AUS3 data center is projected to be the company's largest facility in Austin, spanning 172,000 total square feet, which includes 120,000 square feet of colocation space (CSF) and over 25,000 square feet of Class A office space.
5.24 miles Switch: Texas 3
Texas 3 (AUS03) is Switch's planned third data center on the Data Ranch campus in southeast Austin, a building of about 300,000 sq ft on the campus's vacant eastern lots next to a planned Austin Energy substation.
5.29 miles CyrusOne Austin II
Supports 250 wpsf with the ability to support over 1,000 wpsf Raised Floor: 48"
5.29 miles DataCanopy: Austin, TX
Data Canopy's Austin, TX facility delivers exceptional connectivity and 100% power uptime within a state-of-the-art environment secured by industry-leading features.
5.32 miles Switch: Texas 2
Texas 2 is the second building on Switch's Data Ranch campus in southeast Austin. Data Foundry opened its first phase in 2018, and Switch bought it in 2021.
5.35 miles Switch: Texas 1
Texas 1 is the first building on Switch's Data Ranch campus in southeast Austin. Data Foundry built the single-story, 130,000 sq ft data center in 2010-2011 with three data halls, and Switch bought it in 2021.
5.36 miles LightEdge Austin2 Burleson
The site was formerly operated by OnRamp before being acquired in July 2018.
5.52 miles Element Critical Austin
In 2021, Element Critical acquired the building from vXchnge.
5.55 miles Lumen Austin 1 (4207 Smith School)
8.27 miles Tesla: Austin Dojo
Data center is reportedly on the South Side of the massive Tesla Gigafactory.
8.98 miles Verizon: 11501 Domain
Formerly an XO site
11.39 miles DataBank Austin AUS1
13.82 miles EdgeConneX: AUS11
EdgeConneX is developing two new 730,000 sq ft data centers, EDCAUS11 and EDCAUS12, in Bastrop County, Texas.
13.90 miles EdgeConneX: AUS01
Located in the tech-forward Cedar Creek area of Bastrop County, EdgeConneX AUS01 is the high-performance anchor of a massive new data center campus.
13.99 miles EdgeConneX: AUS12
EdgeConneX is developing two new 730,000 sq ft data centers, EDCAUS11 and EDCAUS12, in Bastrop County, Texas.
14.18 miles EdgeConneX: AUS03
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
14.33 miles EdgeConneX: AUS02
The upcoming AUS02 facility is designed as a massive two-story structure, set to encompass 578,000 square feet (approximately 54,000 square meters) of high-density data center space.
14.39 miles EdgeConneX: AUS04
This facility is part of the EdgeConneX data center campus in Bastrop, Texas.
14.86 miles Tower ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
15.42 miles Switch Austin "The Rock"
First announced in 2021, Switch's 'The Rock' data center in Texas will span 1.5 million square feet (140,000 sqm), and was first approved by the local council in July 2021. The campus is on land adjacent to a number of Dell-owned facilities in Round Rock, Texas.
15.55 miles Switch: Round Rock East Campus
Switch is constructing a new data center facility in Rock Round, Texas, located outside of Austin. The site spans 32.48 acres and is situated north of Louis Henna Boulevard and east of Greenlawn Boulevard in the Rock Round area.
15.55 miles Switch: AUS05 EVO DC
Switch is building another data center in Round Rock on a plot east of South Mays Street and north of Dell Way. The data center will span 72,600 sq ft of gross floor area.
15.90 miles Sabey Austin 1A
Sabey Austin is Sabey Data Centers' new purpose-built data center campus located at 1300 Louis Henna Blvd. The two-building campus, when complete, will offer 430,000 square feet of reliable colocation.
16.00 miles Sabey: Austin 1B
Sabey Data Centers has begun construction on the second building at its Austin, Texas campus.
16.07 miles Skybox: Austin 2
Skybox and Prologis have developed a state-of-the-art data center at 2515 South Kenney Fort Boulevard in Pflugerville, representing a $548 million investment.
16.12 miles Skybox: Austin 1
16.42 miles NorthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.74 miles East PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.50 miles Skybox: Round Rock, TX
The Round Rock City Council has unanimously approved a rezoning request from Skybox Datacenters to develop a 30-acre facility in the Austin, Texas area.

Operating Company

Operated by:

DPO helps utilities, IPPs, and renewable developers deploy data centers as a highly profitable behind-the-meter offtake mechanism. The company serves as an ally to the energy sector, not just another counterparty, with the goal of helping partners make more money from their power. DPO provides services to owners and operators of generation assets of all types and sizes, working to maximize each site's overall efficiency and profitability. For organizations that own or control power-generating assets from 5MW to 5GW, or are seeking to develop one, DPO can help maximize profitability and overall efficiency with proprietary structures and operating processes. Moreover, through overall grid-wide efficiency increases, DPO believes its process and technique can help reduce overall greenhouse emissions and aid in creating a more stable and predictable power grid, with lower prices for the end consumer.

0
Facilities
0
Markets

News See all

Read 2026 Is the Year Texas Passes Virginia in Data Center Capacity
[Texas](https://baxtel.com/data-center/texas) now has more data center capacity operating and under construction than [Virginia](https://baxtel.com/data-center/virginia). Baxtel tracks 28.3 GW buil...

2026 Is the Year Texas Passes Virginia in Data Center Capacity

October 13, 2026 Texas

Texas now has more data center capacity operating and under construction than Virginia. Baxtel tracks 28.3 GW built or building in Texas, against 17.8 GW in Virginia. On capacity already online, Virginia still leads, 12.3 GW to 11.1 GW. If projects scheduled for this year deliver on time, Texas...

Read more
Read ServerDomes Global Breaks Ground on 350MW Hueco Ranch Campus Near El Paso
Kaufman & Company and ServerDomes Global broke ground on Oct. 7 on Hueco Ranch, a $15 billion geodesic-dome data center campus near Desert Haven in Hudspeth County, Texas. The campus spans roughly ...

ServerDomes Global Breaks Ground on 350MW Hueco Ranch Campus Near El Paso

October 11, 2026 ServerDomes Global: Hueco Ranch

Kaufman & Company and ServerDomes Global broke ground on Oct. 7 on Hueco Ranch, a $15 billion geodesic-dome data center campus near Desert Haven in Hudspeth County, Texas. The campus spans roughly 24,000 acres and is planned to generate 350 MW, KTSM reported. County officials say no one told...

Read more
Read ThisWay Global Plans 73MW AI and HPC Data Center in Bryan, Texas
ThisWay Global plans a 73MW data center in Bryan, Texas, called the Research and AI Compute Center (RACC). Located at Texas A&M-RELLIS, it will provide AI and HPC resources to eligible researchers,...

ThisWay Global Plans 73MW AI and HPC Data Center in Bryan, Texas

October 10, 2026 Texas

ThisWay Global plans a 73MW data center in Bryan, Texas, called the Research and AI Compute Center (RACC). Located at Texas A&M-RELLIS, it will provide AI and HPC resources to eligible researchers, public-sector organizations, and industry users. The project is planned for a 25-acre site,...

Read more
Read ThisWay Global Revives Bankrupt Texas A&M Site As 73MW AI Center
ThisWay Global plans a 73MW research and artificial intelligence computing center at the Texas A&M-RELLIS campus in Bryan, Texas, reviving a $700 million project that stalled when its original deve...

ThisWay Global Revives Bankrupt Texas A&M Site As 73MW AI Center

October 09, 2026 Texas

ThisWay Global plans a 73MW research and artificial intelligence computing center at the Texas A&M-RELLIS campus in Bryan, Texas, reviving a $700 million project that stalled when its original developer filed for bankruptcy. The Austin company announced the Research and AI Compute Center...

Read more
Read Crusoe Files For $4.8B Data Center Campus In Jayton, Texas
Crusoe has filed plans with the [Texas Department of Licensing and Regulation](https://www.tdlr.texas.gov/tabs/search) for a two-building data center campus in Jayton, in rural Kent County, Texas, ...

Crusoe Files For $4.8B Data Center Campus In Jayton, Texas

October 02, 2026 Crusoe

Crusoe has filed plans with the Texas Department of Licensing and Regulation for a two-building data center campus in Jayton, in rural Kent County, Texas, carrying an estimated investment of $4.8 billion. The filings, first reported by Data Center Dynamics, place the site along County Road 233...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?