H5: St Louis

Latest Podcast
710 North Tucker Boulevard
Operational
Fully operational facility
Operated by:

H5: St Louis

░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

H5 acquired the site from vXchnge in January 2021.

Map and Nearby Locations:

710 North Tucker Boulevard ( Suite 610 )
H5 Data Centers Sites
Nearby Facilities

Sites within 15 miles of H5: St Louis

Distance Site About
0.17 miles Lumen St Louis 1
0.21 miles TierPoint St Louis-Olive
24/7 onsite security and engineering staff
0.24 miles Lightedge: St Louis, MO
The LightEdge St. Louis data center was added to LightEdge's portfolio through the acquisition of Connectria, which was finalized in April, 2024.
0.25 miles 210 N Tucker (Netrality) St Louis Carrier Hotel
210 N Tucker and 900 Walnut are directly interconnected by Netrality or one of the many carriers within the facilities
0.25 miles Contegix St Louis
Contegix's St Louis site is in Neutrality’s 210 Tucker Building.
0.50 miles 900 Walnut Street (Netrality) St Louis Carrier Hotel
900 Walnut is a hub for IP traffic and is a principle interconnection point between carriers, service providers and enterprise customers in St Louis.
0.50 miles Lumen St Louis 2
0.50 miles TierPoint: St Louis-Walnut
Redundant (A+B) power distribution to each cabinet Power metering and utilization reporting by circuit, cabinet and room
0.50 miles Verizon: 900 Walnut
0.91 miles TierPoint: St. Louis-Locust
TierPoint acquired a building in downtown St. Louis that it plans to retrofit into an enterprise-grade data center.
2.19 miles TriStar: Armory 2
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
2.26 miles TriStar: Armory Project
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
6.10 miles Ascent St Louis STL1
24' clear heights - flexibility in overhead and/or underfloor infrastructure, cabling and cooling options 40' column spacing - greater space utilization, mobility in infrastructure and cabinet placement
9.72 miles Connect Data Centers: St Louis, MO
Oppidan Investment Company is constructing a data center on Hanley Road in North Park, with an expected completion date of December 2025.
12.51 miles StratCap: 2315 Millpark
StratCap acquired a newly-built data center in St. Louis, Missouri that is 100 percent leased to ‘two high credit quality tenants.
12.51 miles TierPoint: 2315 Millpark
TierPoint completed construction of the facility at 2315 Millpark Drive in the city’s Maryland Heights suburb.
12.81 miles Verizon: 2020 Westport
The site was formerly known as the XO Maryland Heights
13.91 miles Centersquare: St Louis SL1
This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.
16.56 miles Cloverleaf: Troy Campus
Cloverleaf Infrastructure has proposed a new data center campus in Troy, Missouri, presenting two distinct design options for the site located northeast of St. Louis.

H5: St Louis Data Center Photos (See all)

Operating Company

Operated by:

H5 Company History:


  • July 2018, Acquires Intiuit datacenter in Quincy, WA
  • March 2018, H5 Expands to Albuquerque (505 Marquette)
  • January 2017, the Cleveland Technology Center (CTC) from ByteGrid. Source: Telecom Ramblings
  • January 2016 H5 acquired NextFort and its Phoenix datacenter.
  • June 2015, H5 acquired their Ashburn datacenter. Source: H5 Press Release
27
Facilities
19
Markets
284MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?