Cloverleaf: Troy Campus

Latest Podcast
Formosa Rd
Land BankPlanned
Future facility in planning with land secured
Operated by:

Cloverleaf: Troy Campus

Site planned for 2028 and has expansions through 2033
Lot Size: 300 acres

Cloverleaf Infrastructure has proposed a new data center campus in Troy, Missouri, presenting two distinct design options for the site located northeast of St. Louis. The first proposal, Phase 1, envisions six two-story buildings—each spanning approximately 264,000 square feet—concentrated on the upper portion of the 300-acre site.

Alternatively, the Full Buildout Concept Plan suggests a more expansive use of the total acreage but with fewer structures, totaling four data center buildings. Both concepts incorporate essential support infrastructure, including a substation, office, warehouse, and seven stormwater basins. With construction targeted to begin in early 2027, the developer is maintaining transparency by not requiring NDAs from local officials as they finalize the vision for this regional hub.

Map and Nearby Locations:

Formosa Rd
Cloverleaf Infrastructure Sites
Nearby Facilities

Sites within 15 miles of Cloverleaf: Troy Campus

Distance Site About
16.56 miles H5: St Louis
16.58 miles Lumen St Louis 1
16.67 miles TierPoint St Louis-Olive
24/7 onsite security and engineering staff
16.71 miles Lightedge: St Louis, MO
The LightEdge St. Louis data center was added to LightEdge's portfolio through the acquisition of Connectria, which was finalized in April, 2024.
16.72 miles Contegix St Louis
Contegix's St Louis site is in Neutrality’s 210 Tucker Building.
16.73 miles 210 N Tucker (Netrality) St Louis Carrier Hotel
210 N Tucker and 900 Walnut are directly interconnected by Netrality or one of the many carriers within the facilities
16.73 miles TierPoint: St Louis-Walnut
Redundant (A+B) power distribution to each cabinet Power metering and utilization reporting by circuit, cabinet and room
16.73 miles 900 Walnut Street (Netrality) St Louis Carrier Hotel
900 Walnut is a hub for IP traffic and is a principle interconnection point between carriers, service providers and enterprise customers in St Louis.
16.73 miles Lumen St Louis 2
16.73 miles Verizon: 900 Walnut
17.39 miles TierPoint: St. Louis-Locust
TierPoint acquired a building in downtown St. Louis that it plans to retrofit into an enterprise-grade data center.
18.65 miles TriStar: Armory 2
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
18.69 miles TriStar: Armory Project
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.

Cloverleaf: Troy Campus Data Center Photos (See all)

Preliminary siteplan for Cloverleaf's data center in St. Louis, Missouri
Source: Cloverleaf Infrastructure