Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused. The developers need more time to comply with new stringent regulatory measures introduced by the City of St. Louis, which were issued in lieu of a full moratorium on data center developments.

This pause follows significant pushback from local officials and residents who have raised concerns about the project's intensive energy and water demands, questionable economic benefits, and impact on the local community, as voiced by Alderman Michael Browning and Aldermen President Megan Green. The new city framework requires closer scrutiny of data center proposals, considering factors like job creation, utility use, distance from neighborhoods, and noise pollution, with a temporary ban still possible if community concerns are not adequately addressed.

Map and Nearby Locations:

3660 Market St
TriStar Properties Sites
Nearby Facilities

Sites within 15 miles of TriStar: Armory Project

Distance Site About
0.09 miles TriStar: Armory 2
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
1.35 miles TierPoint: St. Louis-Locust
TierPoint acquired a building in downtown St. Louis that it plans to retrofit into an enterprise-grade data center.
2.18 miles 210 N Tucker (Netrality) St Louis Carrier Hotel
210 N Tucker and 900 Walnut are directly interconnected by Netrality or one of the many carriers within the facilities
2.19 miles Contegix St Louis
Contegix's St Louis site is in Neutrality’s 210 Tucker Building.
2.20 miles Lightedge: St Louis, MO
The LightEdge St. Louis data center was added to LightEdge's portfolio through the acquisition of Connectria, which was finalized in April, 2024.
2.23 miles TierPoint St Louis-Olive
24/7 onsite security and engineering staff
2.26 miles H5: St Louis
2.31 miles Lumen St Louis 1
2.33 miles 900 Walnut Street (Netrality) St Louis Carrier Hotel
900 Walnut is a hub for IP traffic and is a principle interconnection point between carriers, service providers and enterprise customers in St Louis.
2.33 miles TierPoint: St Louis-Walnut
Redundant (A+B) power distribution to each cabinet Power metering and utilization reporting by circuit, cabinet and room
2.33 miles Lumen St Louis 2
2.33 miles Verizon: 900 Walnut
4.26 miles Ascent St Louis STL1
24' clear heights - flexibility in overhead and/or underfloor infrastructure, cabling and cooling options 40' column spacing - greater space utilization, mobility in infrastructure and cabinet placement
8.29 miles Connect Data Centers: St Louis, MO
Oppidan Investment Company is constructing a data center on Hanley Road in North Park, with an expected completion date of December 2025.
10.48 miles StratCap: 2315 Millpark
StratCap acquired a newly-built data center in St. Louis, Missouri that is 100 percent leased to ‘two high credit quality tenants.
10.48 miles TierPoint: 2315 Millpark
TierPoint completed construction of the facility at 2315 Millpark Drive in the city’s Maryland Heights suburb.
10.74 miles Verizon: 2020 Westport
The site was formerly known as the XO Maryland Heights
12.45 miles Centersquare: St Louis SL1
This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.
18.69 miles Cloverleaf: Troy Campus
Cloverleaf Infrastructure has proposed a new data center campus in Troy, Missouri, presenting two distinct design options for the site located northeast of St. Louis.

TriStar: Armory Project Data Center Photos (See all)

Operating Company

Operated by:

TriStar is a leading developer in the industrial and multifamily real estate sector. The firm utilizes a combination of vision and quantitative analysis to produce institutional quality developments. Its focus remains on prioritizing investor needs and securing optimal outcomes for all involved stakeholders.

2
Facilities
0
Markets

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?