STL1 was announced in 2014 as an $85M, 88,000 sqft multi-tenant data center on 15 acres near Plymouth Industrial Park in Wellston, Missouri, targeted to open in summer 2015. It was never built.

The land is still undeveloped. St Louis County's Land Clearance for Redevelopment Authority holds the parcels and put both Wellston industrial parks out to RFP for logistics and light industrial use in October 2024. Ascent exited data center ownership in 2021 and owns no property in the county.

The specifications below are from the original announcement and were never realized.

Announced specifications:


  • Dual 34 kV electrical connections
  • 10+ MVA of power
  • 88,000 sqft footprint, building shell expandable
  • Access to multiple fiber providers with dual entries, carrier neutral
  • 24' clear heights
  • 40' column spacing

Map and Nearby Locations

6400 Page Ave
Ascent Sites
Nearby Facilities

Sites within 15 miles of Ascent St Louis STL1

Distance Site About
4.25 miles Connect Data Centers: St Louis, MO
Oppidan Investment Company is constructing a data center on Hanley Road in North Park, with an expected completion date of December 2025.
4.26 miles TriStar: Armory Project
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
4.34 miles TriStar: Armory 2
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
5.27 miles TierPoint: St. Louis-Locust
TierPoint acquired a building in downtown St. Louis that it plans to retrofit into an enterprise-grade data center.
6.10 miles H5: St Louis
6.13 miles 210 N Tucker (Netrality) St Louis Carrier Hotel
210 N Tucker and 900 Walnut are directly interconnected by Netrality or one of the many carriers within the facilities
6.14 miles Contegix St Louis
Contegix's St Louis site is in Neutrality’s 210 Tucker Building.
6.15 miles Lightedge: St Louis, MO
The LightEdge St. Louis data center was added to LightEdge's portfolio through the acquisition of Connectria, which was finalized in April, 2024.
6.16 miles TierPoint St Louis-Olive
24/7 onsite security and engineering staff
6.21 miles Lumen St Louis 1
6.36 miles TierPoint: St Louis-Walnut
Redundant (A+B) power distribution to each cabinet Power metering and utilization reporting by circuit, cabinet and room
6.36 miles 900 Walnut Street (Netrality) St Louis Carrier Hotel
900 Walnut is a hub for IP traffic and is a principle interconnection point between carriers, service providers and enterprise customers in St Louis.
6.36 miles Lumen St Louis 2
6.37 miles Verizon: 900 Walnut
6.45 miles TierPoint: 2315 Millpark
TierPoint completed construction of the facility at 2315 Millpark Drive in the city’s Maryland Heights suburb.
6.45 miles StratCap: 2315 Millpark
StratCap acquired a newly-built data center in St. Louis, Missouri that is 100 percent leased to ‘two high credit quality tenants.
6.82 miles Verizon: 2020 Westport
The site was formerly known as the XO Maryland Heights
8.29 miles Centersquare: St Louis SL1
This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.
16.73 miles Project Cumulus
The developers behind Project Cumulus, CRG Cumulus LLC, withdrew their proposal for a data center in St. Charles, Missouri, primarily due to intense local opposition from residents.

Operating Company

Operated by:

Founded in 1998 and headquartered in St. Louis, Ascent provides data center engineering, design, construction management and day-two operations. It operates facilities for owners and tenants rather than owning data centers itself.

Ascent developed and owned its own facilities until 2021, when Lincoln Rackhouse and Stone Point Capital took majority control of the services business. WESCO acquired Ascent in December 2024 for $185M, buying the services platform without any real estate.

Ascent remains the operating partner in the Related Digital and TowerBrook joint venture at Cambridge, Ontario. Facilities that still carry the Ascent name elsewhere are owned by others.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Data center companies use Ledger8760 to track carbon emissions
Data center companies use Ledger8760 to track carbon emissions

Data center companies use Ledger8760 to track carbon emissions

December 13, 2021 Aligned

Aligned, Ascent, Corscale, and T5 have all announced that they will be using Ledger8760's 24x7 tracking platform to record their carbon emissions' hour-by-hour. This tracking system will reportedly enable companies to be more transparent about their energy and utility data, and crucially,...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?