The site was formerly known as the XO Maryland Heights
• 4 KW per cabinet or 160 W per sq ft
• 10 ft ceiling height
• Built-up roof
• Slab on grade
• Remote hands services available
• Environmental systems monitored remotely via XO NOC 24x7x365
• Single feed AC commercial service backed by XO-owned generator set
• Power room is separated from technical space
• DC power system
• Designed to maintain more than four hours of battery reserve on multiple battery strings
• N+1 plus 20% minimum rectification
• Dual distribution paths (A&B feeds)
• Monthly preventive maintenance performed
• Semi-annualcomprehensive maintenance performed
• Uninterruptible Power Supply system
• Equipped with two battery strings
• Designed to maintain a minimum of nine minutes of backup time at full load
• Maintenance bypass cabinet to allow for concurrent maintenance while load is sustained
• Dual distribution paths available by diverse panels
• Monthly preventive maintenance performed
• Semi-annual comprehensive maintenance performed
| Distance | Site | About |
|---|---|---|
| 0.70 miles | TierPoint: 2315 Millpark |
TierPoint completed construction of the facility at 2315 Millpark Drive in the city’s Maryland Heights suburb.
|
| 0.70 miles | StratCap: 2315 Millpark |
StratCap acquired a newly-built data center in St. Louis, Missouri that is 100 percent leased to ‘two high credit quality tenants.
|
| 5.62 miles | Connect Data Centers: St Louis, MO |
Oppidan Investment Company is constructing a data center on Hanley Road in North Park, with an expected completion date of December 2025.
|
| 5.89 miles | Centersquare: St Louis SL1 |
This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.
|
| 6.82 miles | Ascent St Louis STL1 |
24' clear heights - flexibility in overhead and/or underfloor infrastructure, cabling and cooling options
40' column spacing - greater space utilization, mobility in infrastructure and cabinet placement
|
| 10.74 miles | TriStar: Armory Project |
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
|
| 10.82 miles | TriStar: Armory 2 |
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
|
| 10.89 miles | Project Cumulus |
The developers behind Project Cumulus, CRG Cumulus LLC, withdrew their proposal for a data center in St. Charles, Missouri, primarily due to intense local opposition from residents.
|
| 11.94 miles | TierPoint: St. Louis-Locust |
TierPoint acquired a building in downtown St. Louis that it plans to retrofit into an enterprise-grade data center.
|
| 12.81 miles | H5: St Louis |
|
| 12.81 miles | 210 N Tucker (Netrality) St Louis Carrier Hotel |
210 N Tucker and 900 Walnut are directly interconnected by Netrality or one of the many carriers within the facilities
|
| 12.82 miles | Contegix St Louis |
Contegix's St Louis site is in Neutrality’s 210 Tucker Building.
|
| 12.83 miles | Lightedge: St Louis, MO |
The LightEdge St. Louis data center was added to LightEdge's portfolio through the acquisition of Connectria, which was finalized in April, 2024.
|
| 12.85 miles | TierPoint St Louis-Olive |
24/7 onsite security and engineering staff
|
| 12.91 miles | Lumen St Louis 1 | |
| 13.01 miles | Lumen St Louis 2 | |
| 13.01 miles | 900 Walnut Street (Netrality) St Louis Carrier Hotel |
900 Walnut is a hub for IP traffic and is a principle interconnection point between carriers, service providers and enterprise customers in St Louis.
|
| 13.01 miles | TierPoint: St Louis-Walnut |
Redundant (A+B) power distribution to each cabinet
Power metering and utilization reporting by circuit, cabinet and room
|
| 13.01 miles | Verizon: 900 Walnut | |
| 17.91 miles | Mastercard Technology Campus Missouri |
January 16, 2026
Verizon Enterprise
October 06, 2025
Verizon Enterprise
January 27, 2025
Verizon Enterprise
February 21, 2024
Verizon Enterprise
August 29, 2023
Verizon Enterprise
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas