LightEdge acquires Cavern Technologies
September 24, 2021
LightEdge Solutions
The LightEdge St. Louis data center was added to LightEdge's portfolio through the acquisition of Connectria, which was finalized in April, 2024.
| Distance | Site | About |
|---|---|---|
| 0.01 miles | Contegix St Louis |
Contegix's St Louis site is in Neutrality’s 210 Tucker Building.
|
| 0.01 miles | 210 N Tucker (Netrality) St Louis Carrier Hotel |
210 N Tucker and 900 Walnut are directly interconnected by Netrality or one of the many carriers within the facilities
|
| 0.05 miles | TierPoint St Louis-Olive |
24/7 onsite security and engineering staff
|
| 0.14 miles | Lumen St Louis 1 | |
| 0.24 miles | H5: St Louis |
|
| 0.28 miles | Lumen St Louis 2 | |
| 0.28 miles | 900 Walnut Street (Netrality) St Louis Carrier Hotel |
900 Walnut is a hub for IP traffic and is a principle interconnection point between carriers, service providers and enterprise customers in St Louis.
|
| 0.28 miles | TierPoint: St Louis-Walnut |
Redundant (A+B) power distribution to each cabinet
Power metering and utilization reporting by circuit, cabinet and room
|
| 0.28 miles | Verizon: 900 Walnut | |
| 0.89 miles | TierPoint: St. Louis-Locust |
TierPoint acquired a building in downtown St. Louis that it plans to retrofit into an enterprise-grade data center.
|
| 2.12 miles | TriStar: Armory 2 |
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
|
| 2.20 miles | TriStar: Armory Project |
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
|
| 6.15 miles | Ascent St Louis STL1 |
24' clear heights - flexibility in overhead and/or underfloor infrastructure, cabling and cooling options
40' column spacing - greater space utilization, mobility in infrastructure and cabinet placement
|
| 9.84 miles | Connect Data Centers: St Louis, MO |
Oppidan Investment Company is constructing a data center on Hanley Road in North Park, with an expected completion date of December 2025.
|
| 12.54 miles | StratCap: 2315 Millpark |
StratCap acquired a newly-built data center in St. Louis, Missouri that is 100 percent leased to ‘two high credit quality tenants.
|
| 12.54 miles | TierPoint: 2315 Millpark |
TierPoint completed construction of the facility at 2315 Millpark Drive in the city’s Maryland Heights suburb.
|
| 12.83 miles | Verizon: 2020 Westport |
The site was formerly known as the XO Maryland Heights
|
| 14.03 miles | Centersquare: St Louis SL1 |
This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.
|
| 16.71 miles | Cloverleaf: Troy Campus |
Cloverleaf Infrastructure has proposed a new data center campus in Troy, Missouri, presenting two distinct design options for the site located northeast of St. Louis.
|
Founded in 1996, LightEdge is a enterprise-grade cloud service provider, colocation and consulting company.
LightEdge is ISO 20000-1, SSAE 16 SOC 1 and SSAE 16 SOC 2 certified with Data Center operations meeting the stringent PCI-DSS and HIPAA compliance requirements.
LightEdge is privately held with the Anschutz Corporation being the largest investor.
September 24, 2021
LightEdge Solutions
July 17, 2018
LightEdge Solutions
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas