StratCap: 2315 Millpark

Latest Podcast
2315 Millpark Dr
Operational
Fully operational facility
Operated by:

StratCap: 2315 Millpark

Year Built: 2022

Sites leasing space from StratCap Data Centers:

░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

StratCap acquired a newly-built data center in St. Louis, Missouri that is 100 percent leased to ‘two high credit quality tenants.

  • The St. Louis facility suggests that it is likely TierPoint’s facility at 2315 Millpark Drive in the city’s Maryland Heights suburb. First announced in September 2021 and completed in August 2022, the 23,000 square foot (2,100 sqm), Tier III-quality facility offers 14,500 sq ft (1,350 sqm) of production or raised floor space.

Map and Nearby Locations:

2315 Millpark Dr
StratCap Data Centers Sites
Nearby Facilities

Sites within 15 miles of StratCap: 2315 Millpark

Distance Site About
0.00 miles TierPoint: 2315 Millpark
TierPoint completed construction of the facility at 2315 Millpark Drive in the city’s Maryland Heights suburb.
0.70 miles Verizon: 2020 Westport
The site was formerly known as the XO Maryland Heights
4.96 miles Connect Data Centers: St Louis, MO
Oppidan Investment Company is constructing a data center on Hanley Road in North Park, with an expected completion date of December 2025.
5.27 miles Centersquare: St Louis SL1
This facility was previously operated by Cyxtera. Centersquare completed the successful acquisition of Cyxtera and Evoque Data Center Solutions in early 2024.
6.45 miles Ascent St Louis STL1
24' clear heights - flexibility in overhead and/or underfloor infrastructure, cabling and cooling options 40' column spacing - greater space utilization, mobility in infrastructure and cabinet placement
10.48 miles TriStar: Armory Project
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
10.57 miles TriStar: Armory 2
Plans by TriStar Properties to convert the vacant St. Louis Armory into a data center and build a second data center on its parking lot for an estimated $600 million have been paused.
10.85 miles Project Cumulus
The developers behind Project Cumulus, CRG Cumulus LLC, withdrew their proposal for a data center in St. Charles, Missouri, primarily due to intense local opposition from residents.
11.65 miles TierPoint: St. Louis-Locust
TierPoint acquired a building in downtown St. Louis that it plans to retrofit into an enterprise-grade data center.
12.51 miles H5: St Louis
12.52 miles 210 N Tucker (Netrality) St Louis Carrier Hotel
210 N Tucker and 900 Walnut are directly interconnected by Netrality or one of the many carriers within the facilities
12.53 miles Contegix St Louis
Contegix's St Louis site is in Neutrality’s 210 Tucker Building.
12.54 miles Lightedge: St Louis, MO
The LightEdge St. Louis data center was added to LightEdge's portfolio through the acquisition of Connectria, which was finalized in April, 2024.
12.56 miles TierPoint St Louis-Olive
24/7 onsite security and engineering staff
12.61 miles Lumen St Louis 1
12.73 miles 900 Walnut Street (Netrality) St Louis Carrier Hotel
900 Walnut is a hub for IP traffic and is a principle interconnection point between carriers, service providers and enterprise customers in St Louis.
12.73 miles Lumen St Louis 2
12.73 miles TierPoint: St Louis-Walnut
Redundant (A+B) power distribution to each cabinet Power metering and utilization reporting by circuit, cabinet and room
12.73 miles Verizon: 900 Walnut
18.31 miles Mastercard Technology Campus Missouri

StratCap: 2315 Millpark Data Center Photos (See all)

StratCap Data Center at 2315 Millpark Drive, St Louis
Source: Google Map

Operating Company

Operated by:

StratCap Data Centers is an investment manager and strategic capital partner focused on acquiring, managing, and enhancing the value of essential data center real estate assets that support internet and cloud computing infrastructure. They identify and invest in critical data center facilities, optimizing their performance through strategic asset management initiatives. This includes implementing energy efficiency measures, infrastructure upgrades, and advanced operational practices to improve reliability and reduce costs.

4
Facilities
0
Markets
10MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?