2.83 miles
|
Pulsant Reading East 2
|
|
4.09 miles
|
Redcentric Reading
|
|
4.13 miles
|
Amito Reading
|
|
5.45 miles
|
Level3 Bracknell
|
|
5.60 miles
|
CentriLogic Berkshire
|
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
|
8.19 miles
|
Redcentric Theale
|
|
8.76 miles
|
Pulsant Maidenhead P1
|
|
9.34 miles
|
iomart DC5 Maidenhead
|
|
11.30 miles
|
Ark: Cody Park
|
29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.
|
11.46 miles
|
Datum FRN1
|
|
12.18 miles
|
Equinix LD11x
|
|
12.25 miles
|
Equinix LD4
|
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
|
12.33 miles
|
Equinix LD6
|
|
12.38 miles
|
CyrusOne LON5
|
|
12.40 miles
|
Equinix LD7
|
|
12.42 miles
|
China Mobile Slough
|
|
12.45 miles
|
Equinix LD14
|
|
12.45 miles
|
Equinix LD12
|
|
12.46 miles
|
Iron Mountain London LON-1
|
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
|
12.48 miles
|
QTS London
|
|
12.48 miles
|
Equinix LD5
|
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
|
12.52 miles
|
VIRTUS London 11
|
|
12.59 miles
|
Cyxtera Slough LO5
|
Cyxtera's LO5 site in Slough West of London was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
|
12.67 miles
|
Equinix Slough Campus LD4, LD5, LD6, LD10
|
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
|
12.68 miles
|
CyrusOne London III
|
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
|
12.68 miles
|
Equinix LD13x
|
|
12.68 miles
|
GTR: Slough 3
|
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
12.69 miles
|
GTR: Slough 2
|
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
12.71 miles
|
GTR: Slough
|
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
12.72 miles
|
Cyxtera: LHR1
|
|
12.73 miles
|
Logicalis Slough
|
|
12.75 miles
|
Kao Data Slough
|
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
|
12.75 miles
|
VIRTUS LONDON10
|
|
12.75 miles
|
Equinix LD10
|
|
12.76 miles
|
VIRTUS Slough London 3 and 4
|
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
|
12.76 miles
|
VIRTUS LONDON9
|
|
12.77 miles
|
GoDaddy Slough (HEG)
|
|
12.78 miles
|
CyrusOne London I
|
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
|
12.78 miles
|
NTT Slough 2
|
|
12.79 miles
|
Iron Mountain London LON-2
|
|
12.80 miles
|
Rackspace London Slough (LON3)
|
Raised Flooring: 5,000 sq m
15 MVA Total Utility Power
Manned 24x7x365
|
12.81 miles
|
NTT Slough 3
|
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
|
12.93 miles
|
Level3 Slough
|
|
13.07 miles
|
Ark: Longcross 2
|
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
|
13.09 miles
|
Ark: Longcross
|
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
|
13.23 miles
|
Zayo Egham
|
|
13.51 miles
|
DRT London (Cresses Business Park)
|
|
14.05 miles
|
Equinix: Wexham Road
|
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
|
14.28 miles
|
Yondr Slough
|
The 1st phase was completed in 2024. The 2nd phase will be completed in late 2025.
|
15.01 miles
|
Digital Realty Woking
|
|
15.01 miles
|
CyrusOne London Woking
|
|
15.07 miles
|
Redcentric Woking TC3
|
|
15.07 miles
|
NaviSite Woking
|
|
16.92 miles
|
Virtus: Saunderton Campus
|
UK data center company Virtus plans for a new campus in Saunderton, Buckinghamshire. At full build-out, the campus will feature four data center buildings totaling 75MW of IT capacity.
|
18.48 miles
|
4D Surrey
|
Based in Byfleet, 4D's Tier-3 Surrey data centre is close to M25 and about 30 minutes to London Waterloo. It's carrier neutral and offers u-space, quarter, half and full racks with options for data halls and suites.
|
18.51 miles
|
DRT London (West Drayton)
|
|
18.53 miles
|
ServerFarm London
|
3,000 m² of data hall expansion space available within 6 – 9 months
Concurrently maintainable standards
|
19.07 miles
|
VIRTUS: London 8
|
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
|
19.11 miles
|
VIRTUS: London 7
|
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
|
19.19 miles
|
VIRTUS Stockley Park Campus
|
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
|
19.22 miles
|
VIRTUS: London 6
|
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
|
19.27 miles
|
CyrusOne: London II
|
|
19.38 miles
|
CyrusOne London II (Stockley Park)
|
The London II datacenter was originally built by Infinity SDC.
|
19.52 miles
|
VIRTUS: London 14
|
The data center, currently under construction, will span two floors upon completion. It will offer 8,600 square meters of white space divided among 6 data halls.
|