Virtus: Saunderton Campus

Latest Podcast
Haw Ln
Under Construction
New facility under construction
Operated by:

Virtus: Saunderton Campus

Short Code: London 15
Year Planned: 2026
PUE: 1.2
Lot Size: 50 acres

UK data center company Virtus plans for a new campus in Saunderton, Buckinghamshire. The company has acquired a 50-acre plot in the village, located near High Wycombe and north of existing data center hub Slough.

  • At full build-out, the campus will feature four data center buildings.
  • The construction has commenced in Q4 2024 and be ready for service in late 2026.

Map and Nearby Locations:

Haw Ln
VIRTUS Data Centres Ltd Sites
Nearby Facilities

Sites within 15 miles of Virtus: Saunderton Campus

Distance Site About
0.07 miles Virtus: London 18
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
0.08 miles Virtus: London 16
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
0.11 miles Virtus: London 17
This facility is part of the new campus in Saunderton, Buckinghamshire, operated by the UK data center company Virtus.
4.74 miles DRT London (Cresses Business Park)
CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021.
4.75 miles CapitaLand: Cressex Business Park
Cressex Business Park is a colocation data centre comprising a single-storey unit and a two-storey office.
5.13 miles Wycombe Air Park
The 13-hectare site will feature six data centre buildings, a substation, and a gatehouse, encompassing approximately 580,000 square feet.
7.45 miles QuickHostUK: High Wycombe
Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK).
9.38 miles Echelon LCY20
Ireland’s Echelon Data Centres has partnered with Starwood to develop a second UK data center.
11.42 miles iomart DC5 Maidenhead
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
13.51 miles Pulsant: Maidenhead SE-2
13.59 miles Virgin Media O2 Slough
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
13.60 miles Iron Mountain London LON-1
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
13.63 miles Equinix LD7
13.68 miles Equinix LD11x
13.69 miles Equinix LD6
13.70 miles Equinix LD12
13.70 miles Equinix LD14
13.73 miles Equinix LD4
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
13.83 miles CyrusOne London III
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
13.96 miles Equinix LD5
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
14.09 miles Equinix LD10
14.10 miles CyrusOne London I
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
14.10 miles VIRTUS Slough London 3 and 4
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
14.11 miles China Mobile Slough
14.12 miles Equinix LD13x
14.17 miles Equinix Slough Campus LD4, LD5, LD6, LD10
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
14.24 miles VIRTUS London 11
14.26 miles VIRTUS LONDON10
14.26 miles Lumen Slough
14.27 miles Iron Mountain London LON-2
14.27 miles Logicalis Slough
14.31 miles Iron Mountain: LON3
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
14.32 miles GoDaddy Slough (HEG)
14.33 miles Rackspace London Slough (LON3)
Raised Flooring: 5,000 sq m 15 MVA Total Utility Power Manned 24x7x365
14.36 miles CyrusOne LON5
14.38 miles Creslow Park
Creslow Park is a data center located in a rural area of Buckinghamshire, United Kingdom.
14.42 miles VIRTUS LONDON9
14.44 miles GTR: Slough 3
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
14.45 miles GTR: Slough 2
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
14.48 miles GTR: Slough
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
14.54 miles Digital Realty: LHR27
Located just 15 minutes from London Heathrow in the Slough Trading Estate, our LHR27 Data Center offers prime connectivity and scalability.
14.55 miles Segro: Slough 2
This planned facility will be part of Segro's London Slough Campus.
14.58 miles Digital Realty: LHR26
In 2024, Digital Realty expanded its London presence by acquiring a data center in Slough, UK, previously owned by Cyxtera.
14.60 miles NTT Slough 3
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
14.66 miles Segro: London Slough Campus
Segro has secured planning approval to develop a data center campus on Bath Road, Slough.
14.67 miles Kao Data Slough
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
14.67 miles NTT Slough 2
15.76 miles Gravity Edge: London LDN2
15.87 miles Yondr: Slough Campus
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
15.87 miles Yondr: Slough 2
This facility is part of Yondr's London Slough Campus.
15.88 miles Equinix: Wexham Road
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
15.91 miles Yondr: Slough 3
Known as Building C, the 25,100 sqm (270,175 sq ft) building comprises four data halls over two stories.
15.96 miles Pinewood: Slough Campus
Pinewood Group, owned by Aermont Capital, has revised its 2023 plans for a 1.4 million sqft film studio expansion west of London.
16.06 miles CyrusOne: London LON6
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
16.11 miles Pulsant: Reading SE-4
16.12 miles CyrusOne: LON6 Bldg2
This facility will be part of CyrusOne's LON6 Campus in London.
16.19 miles CyrusOne: LON6 Bldg3
This facility will be part of CyrusOne's LON6 Campus in London.
16.25 miles CyrusOne: LON6 Bldg4
This facility will be part of CyrusOne's LON6 Campus in London.
16.30 miles CyrusOne: LON6 Bldg5
This facility will be part of CyrusOne's LON6 Campus in London.
16.36 miles CyrusOne: LON6 Bldg6
This facility will be part of CyrusOne's LON6 Campus in London.
16.96 miles Centersquare: Reading LHR3
Southern Electric provides power feeds Power density minimum(W/sf) = 150
17.43 miles Sequence: Iver, Buckinghamshire
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
17.54 miles CapitaLand: Chess Building
In 2023, CapitaLand acquired the building from Digital Realty for $159 million.
17.56 miles Lunar 5
Lunar 5 is described as a “premium data-center facility” with 7,400 m² of net customer space across eight data halls.
17.69 miles West London Tech Park
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
17.71 miles West London Tech Bldg2
This facility is part of Greystoke's West London Tech Park.
17.71 miles NTT Hempstead 2
17.74 miles Hyperscale Data Center Request Dataset
Amazon Data Services UK Limited has filed plans to develop a new tape library data center at Plot 3, Maylands Avenue, Hemel Hempstead, Hertfordshire (HP2 4FQ), outside London. The project covers a 0.6-hectare (1.48-acre) site and involves construction of a two-story, 1,935 sqm (20,840 sq ft) facility. The application was validated in February 2026 and is currently in the planning stage.
17.77 miles Northtree: Hemel Hempstead
Northtree Investment Management has received outline planning approval to redevelop 45 Maylands Avenue in Hemel Hempstead into a state-of-the-art data center.
17.77 miles Hyperscale Data Center Request Dataset
17.86 miles NTT Hempstead 3
17.87 miles Thorney: Iver DC-F
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
17.92 miles Thorney: Iver DC-E
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
17.96 miles NTT Hempstead 1
17.96 miles Thorney: Iver DC-D
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
17.99 miles Thorney: Iver DC-C
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
18.00 miles Hyperscale Data Center Request Dataset
Amazon Data Services has officially filed a proposal with Buckinghamshire Council to redevelop the Ridgeway Distribution Centre in Iver into a 30,525 sqm data center campus, a move that signals a significant shift from the site's industrial past.
18.01 miles NTT Hempstead4
NTT Global Data Centers opened its 7th London data center site in Hemel Hempstead.
18.03 miles Hyperscale Data Center Request Dataset
18.05 miles Thorney: Iver DC-B
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
18.07 miles Thorney: Iver DC-A
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
18.09 miles Segro: Iver Campus
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
18.10 miles Thorney Lane LLP: Iver Campus
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
18.17 miles Abbots Langley Data Centre
18.25 miles Digital Reef: Didcot Tech Park
Digital Reef (part of Reef Group) is planning a data center and technology park at Hill Farm, Didcot, Oxfordshire.
18.37 miles CorScale: Court Lane, Iver
In December 2024, Corscale Data Centers received approval to develop a new campus in London.
18.38 miles Keppel: London Bracknell
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
18.39 miles Vodafone: London Bracknell
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
18.48 miles CentriLogic Berkshire
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
18.52 miles Hyperscale Data Center Request Dataset
Amazon is reportedly behind a proposed 27MW, energy-efficient data center at the former HP site near Swindon, aiming for net-zero carbon emissions by 2040.
18.54 miles Amito Reading
18.55 miles Pulsant: Reading SE-3
18.56 miles Asanti: Reading
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
18.60 miles Level3 Bracknell
18.69 miles Hyperscale Data Center Request Dataset
18.73 miles RWE: Didcot
RWE has submitted a planning application to The Vale of White Horse District Council for a new data centre campus.
18.85 miles Stellanor: Reading
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
18.89 miles Hyperscale Data Center Request Dataset
The Amazon's two data center campus was built adjacent to the Didcot Power Station under the pseudonym Willow Developments LLC. The single-story facility will span 8,692 sq m (94,000 sq ft), while the two-story one will take up 20,800 sqm (224,000 sq ft). The company also plans to deploy 52 3-MVA diesel generators for backup power, four of which would be secondary backup generators. Two additional 1MVA generators were proposed for powering administrative sections of the sit
19.00 miles Hyperscale Data Center Request Dataset
This is the second data center building of Amazon's Didcot campus.
19.10 miles CloudHQ: Didcot LHR Campus
CloudHQ’s 37.5-acre LHR campus in Didcot, England, is one of the largest fully permitted and powered data center campuses in the London metropolitan area.
19.16 miles CloudHQ: LHR 2
This facility will be part of CloudHQ's LHR campus in Didcot, England.
19.23 miles Link Park Heathrow Data Center
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
19.43 miles Tritax: London Slough (Phase 2)
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
19.51 miles Tritax: London Slough (Phase 1)
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
19.92 miles VIRTUS: London 7
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
19.95 miles VIRTUS: London 8
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.

Virtus: Saunderton Campus Data Center Photos (See all)

Operating Company

Operated by:

VIRTUS Data Centres, the one of the UK’s fastest growing data centre provider, owns, designs, builds and operates the country’s most efficient and flexible data centres.

29
Facilities
1
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?