Redcentric Reading

3 -5 Worton Dr

Operated by:

Map and Nearby Locations:

3 -5 Worton Dr
Click Map to begin Search

Sites within 15 miles of Redcentric Reading

Show SqM
Distance Site About
0.52 miles Amito Reading
2.91 miles Pulsant Reading East 2
4.09 miles Cyxtera Reading LHR3
Southern Electric provides power feeds Power density minimum(W/sf) = 150
4.37 miles Redcentric Theale
9.17 miles Level3 Bracknell
9.35 miles CentriLogic Berkshire
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
12.17 miles Ark: Cody Park
29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.
12.40 miles Datum FRN1
12.76 miles Pulsant Maidenhead P1
13.11 miles iomart DC5 Maidenhead
16.18 miles Equinix LD11x
16.25 miles Equinix LD4
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
16.26 miles DRT London (Cresses Business Park)
16.33 miles Equinix LD6
16.40 miles Equinix LD7
16.41 miles CyrusOne LON5
16.44 miles China Mobile Slough
16.45 miles Equinix LD14
16.45 miles Iron Mountain London LON-1
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
16.45 miles Equinix LD12
16.50 miles Equinix LD5
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
16.50 miles QTS London
16.55 miles VIRTUS London 11
16.63 miles Cyxtera Slough LO5
Cyxtera's LO5 site in Slough West of London was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
16.65 miles Ark: Longcross 2
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
16.66 miles Ark: Longcross
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings 385,000 sqft of space.
16.68 miles CyrusOne London III
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
16.69 miles Equinix Slough Campus LD4, LD5, LD6, LD10
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
16.70 miles Equinix LD13x
16.72 miles GTR: Slough 3
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
16.73 miles GTR: Slough 2
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
16.75 miles GTR: Slough
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
16.76 miles Logicalis Slough
16.77 miles Cyxtera: LHR1
16.77 miles Equinix LD10
16.78 miles VIRTUS Slough London 3 and 4
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
16.78 miles VIRTUS LONDON10
16.79 miles VIRTUS LONDON9
16.79 miles Kao Data Slough
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
16.80 miles CyrusOne London I
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
16.80 miles GoDaddy Slough (HEG)
16.81 miles Iron Mountain London LON-2
16.82 miles NTT Slough 2
16.83 miles Rackspace London Slough (LON3)
Raised Flooring: 5,000 sq m 15 MVA Total Utility Power Manned 24x7x365
16.86 miles NTT Slough 3
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
16.96 miles Level3 Slough
17.13 miles Zayo Egham
18.05 miles CyrusOne London Woking
18.05 miles Digital Realty Woking
18.12 miles NaviSite Woking
18.12 miles Redcentric Woking TC3
18.12 miles Equinix: Wexham Road
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
18.30 miles Amazon Didcot
The Amazon's two data center campus was built adjacent to the Didcot Power Station under the pseudonym Willow Developments LLC. The single-story facility will span 8,692 sq m (94,000 sq ft), while the two-story one will take up 20,800 sqm (224,000 sq ft). The company also plans to deploy 52 3-MVA diesel generators for backup power, four of which would be secondary backup generators. Two additional 1MVA generators were proposed for powering administrative sections of the sit
18.35 miles Yondr Slough
The 1st phase was completed in 2024. The 2nd phase will be completed in late 2025.
18.91 miles Virtus: Saunderton Campus
UK data center company Virtus plans for a new campus in Saunderton, Buckinghamshire. At full build-out, the campus will feature four data center buildings totaling 75MW of IT capacity.

Redcentric Reading Data Center Photos

Operating Company

Redcentric is a managed service provider based in the UK.

History

In March 2016 Redcentric acquired City of Lifeline and its data center.
In 2022, the company acquired 3 facilities from Sungard

9 Facilities Owned
5 Markets Served
View Company

News

Read More News