Viasat launches new headquarters in London
April 15, 2024
London
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings with 385,000 sqft of space.
The data centre campus at Longcross Park, part of the Enterprise M3 Enterprise Zone, is the first commercial development on the 300-acre Longcross Garden Village.
| Distance | Site | About |
|---|---|---|
| 0.04 miles | Ark: Longcross 2 |
Ark Data Centres acquired the site in early 2020 and it is expected to be completed in 2025. Upon completion, The data center campus spreads across two buildings.
|
| 3.87 miles | Stellanor: Woking TC3 |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 3.87 miles | NaviSite Woking | |
| 3.89 miles | CyrusOne London Woking |
|
| 3.89 miles | Digital Realty Woking |
|
| 5.42 miles | Stellanor: Byfleet |
The Stellanor Byfleet Data Center was acquired by Stellanor Datacenters (backed by DWS) from Redcentric in October 2025.
|
| 7.21 miles | Hyperscale Data Center Request Dataset | |
| 7.34 miles | Tritax: London Slough (Phase 1) |
Tritax Big Box, a UK real estate investment trust, has acquired a 74-acre site near Heathrow, London, for data center development.
|
| 7.41 miles | Tritax: London Slough (Phase 2) |
Future expansion is being considered for the Tritax Big Box London Slough Campus, with a possible second phase.
|
| 7.51 miles | CentriLogic Berkshire |
CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.
|
| 7.61 miles | DataBank: London Heathrow |
DataBank’s Felltham data center offers over 2,400 square meters (26,000 sq. ft.) of data center colocation space. The site also features an N+1 power design and access to 6 on-site network providers.
|
| 7.61 miles | ServerFarm London |
The data centre facility was previously known as Michael Perry Technology Centre (MPC) and is located on the Westgate Estate, Staines Road, Feltham.
|
| 7.64 miles | Level3 Bracknell | |
| 8.07 miles | Gravity Edge: London LDN1 |
Located in Camberley, Gravity Edge LDN1 is a mission-critical data center flagship that bridges the gap between traditional enterprise hosting and the high-density demands of modern AI.
|
| 8.07 miles | Keppel: London Bracknell |
The 4.7-acre freehold property offers 94,900 sqft of gross floor space. Keppel DC REIT acquired it in 2022 for £57.0 million ($76.5 million).
|
| 8.08 miles | Vodafone: London Bracknell |
Vodafone fully leases the data center on a triple-net, shell-and-core basis, with their lease extending until 2039.
|
| 8.40 miles | Hyperscale Data Center Request Dataset |
Amazon is reportedly behind a proposed 27MW, energy-efficient data center at the former HP site near Swindon, aiming for net-zero carbon emissions by 2040.
|
| 8.87 miles | Gravity Edge: London LDN2 | |
| 9.12 miles | Equinix: Wexham Road |
Equinix plans to turn a former paint factory in Slough, UK, into a data center.
|
| 9.13 miles | DRT London (West Drayton) |
|
| 9.18 miles | Yondr: Slough Campus |
Yondr completed the first phase of its London Slough Campus in 2024. The campus will consist of three buildings upon full build-out.
|
| 9.22 miles | Yondr: Slough 2 |
This facility is part of Yondr's London Slough Campus.
|
| 9.24 miles | Yondr: Slough 3 |
Known as Building C, the 25,100 sqm (270,175 sq ft) building comprises four data halls over two stories.
|
| 9.37 miles | Segro: London Slough Campus |
Segro has secured planning approval to develop a data center campus on Bath Road, Slough.
|
| 9.41 miles | Kao Data Slough |
Kao Data's KLON-06 facility in Slough Trading Estate offers 16MW Tier 3 colocation, located in UK's data center heartland in the connectivity-rich West London Availability Zone.
|
| 9.43 miles | Segro: Slough 2 |
This planned facility will be part of Segro's London Slough Campus.
|
| 9.46 miles | NTT Slough 2 |
|
| 9.48 miles | Thorney: Iver DC-D |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 9.48 miles | Digital Realty: LHR26 |
In 2024, Digital Realty expanded its London presence by acquiring a data center in Slough, UK, previously owned by Cyxtera.
|
| 9.50 miles | Digital Realty: LHR27 |
Located just 15 minutes from London Heathrow in the Slough Trading Estate, our LHR27 Data Center offers prime connectivity and scalability.
|
| 9.51 miles | CyrusOne LON5 | |
| 9.52 miles | NTT Slough 3 |
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
|
| 9.53 miles | Thorney: Iver DC-E |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 9.57 miles | Segro: Iver Campus |
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
| 9.58 miles | GTR: Slough |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 9.58 miles | Thorney Lane LLP: Iver Campus |
The redevelopment of Thorney Business Park in Iver has evolved into a massive, two-phase masterplan that significantly expands upon the original vision.
|
| 9.59 miles | Thorney: Iver DC-F |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 9.59 miles | GTR: Slough 2 |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 9.60 miles | GTR: Slough 3 |
The new Slough campus comprises of three independent data centres capable of operating individually, or as one interlinked campus.
|
| 9.65 miles | Thorney: Iver DC-B |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 9.65 miles | Pulsant: Maidenhead SE-2 |
|
| 9.66 miles | VIRTUS LONDON9 | |
| 9.70 miles | VIRTUS London 11 | |
| 9.71 miles | Link Park Heathrow Data Center |
The proposed three-story facility, situated on 10.75 acres, would have provided 16,850 sqm (181,400 sq ft) of IT space.
|
| 9.72 miles | Thorney: Iver DC-C |
This facility is part of Thorney Lane LLP's data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 9.76 miles | Iron Mountain: LON3 |
Iron Mountain is planning to construct its LON-3 data center, which will feature 5,220 square meters of data center space
|
| 9.76 miles | GoDaddy Slough (HEG) | |
| 9.77 miles | Verizon London UK4 | |
| 9.77 miles | Rackspace London Slough (LON3) |
Raised Flooring: 5,000 sq m
15 MVA Total Utility Power
Manned 24x7x365
|
| 9.78 miles | China Mobile Slough | |
| 9.78 miles | Iron Mountain London LON-2 | |
| 9.79 miles | Logicalis Slough | |
| 9.81 miles | VIRTUS LONDON10 | |
| 9.85 miles | Equinix Slough Campus LD4, LD5, LD6, LD10 |
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
|
| 9.91 miles | Equinix LD13x | |
| 9.91 miles | Lumen Slough |
|
| 9.92 miles | Equinix LD10 |
|
| 9.92 miles | Hyperscale Data Center Request Dataset |
Amazon Data Services has officially filed a proposal with Buckinghamshire Council to redevelop the Ridgeway Distribution Centre in Iver into a 30,525 sqm data center campus, a move that signals a significant shift from the site's industrial past.
|
| 9.95 miles | Equinix LD5 |
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
|
| 9.96 miles | VIRTUS Slough London 3 and 4 |
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
|
| 9.98 miles | CyrusOne London I |
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
|
| 9.98 miles | Smallworld: Guildford |
|
| 10.06 miles | Equinix LD4 |
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
|
| 10.07 miles | Equinix LD11x | |
| 10.10 miles | CorScale: Court Lane, Iver |
In December 2024, Corscale Data Centers received approval to develop a new campus in London.
|
| 10.14 miles | Equinix LD6 | |
| 10.18 miles | Equinix LD14 | |
| 10.18 miles | CyrusOne London III |
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
|
| 10.18 miles | Virgin Media O2 Slough |
Located in the world-renowned Slough Trading Estate, the Virgin Media O2 Slough Data Centre serves as the vital "heartbeat" of the company’s UK mobile operations.
|
| 10.19 miles | Equinix LD12 | |
| 10.22 miles | Equinix LD7 |
|
| 10.24 miles | Thorney: Iver DC-A |
Thorney Lane LLP has proposed the development of a data center campus at Thorney Business Park in North Iver, Buckinghamshire.
|
| 10.27 miles | Asanti: Farnborough |
Spanning 12,000 sq ft, the site is designed to Tier III standards and operates on 100% certified green energy to support sustainable business growth.
|
| 10.29 miles | Iron Mountain London LON-1 |
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
|
| 10.46 miles | Stellanor: Hounslow |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 10.62 miles | CyrusOne London II (Stockley Park) |
The London II datacenter was originally built by Infinity SDC.
|
| 10.75 miles | VIRTUS: London 8 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON8 comprises over 7,000m² of net technical data center space.
|
| 10.79 miles | VIRTUS: London 14 |
The Virtus London 14 data center spans two floors, offering 8,600 square meters of white space distributed across six data halls.
|
| 10.81 miles | VIRTUS Stockley Park Campus |
The VIRTUS Data Centre Campus at Stockley Park is located close to the well known Stockley Park business center. The campus comprises of four facilities and is built with VIRTUS' value of flexibility at the core of the design.
|
| 10.82 miles | VIRTUS: London 7 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON7 comprises over 13,000m² of net technical data center space.
|
| 10.87 miles | VIRTUS: London 6 |
The facility is part of the VIRTUS Stockley Park Campus. LONDON6 comprises over 7,000m² of net technical data center space.
|
| 11.01 miles | Rackspace: LON8 |
|
| 11.12 miles | Datum FRN1 |
|
| 11.28 miles | Ark: Cody Park |
29 data centres across 6 buildings on a 36 acre high security data centre campus owned and operated by Ark.
|
| 11.44 miles | West London Tech Bldg2 |
This facility is part of Greystoke's West London Tech Park.
|
| 11.44 miles | VIRTUS Hayes London2 |
|
| 11.49 miles | West London Tech Park |
Applications to develop on Green Belt land have been rejected twice by Buckinghamshire Council, but the new government has indicated that the latest proposal will be reviewed and may be approved.
|
| 11.56 miles | Hyperscale Data Center Request Dataset |
Located in the Silverdale Industrial Estate, this new West London facility is a specialized two-story data center dedicated to AWS tape storage.
|
| 11.58 miles | Marvel: Hayes |
The 1,914 sqm (20,602 sq ft) development will feature data halls, offices, and a single backup generator.
|
| 11.58 miles | Ark: Union Park |
There are 21 Data Halls of approximately 1250m2 each, to be deployed at approximately 3MW per hall.
|
| 11.61 miles | Sequence: Iver, Buckinghamshire |
The project aims to redevelop a 16.5-hectare former landfill site located east of the M25 along Slough Road (A4007), just south of the existing Iver Substation.
|
| 11.71 miles | Pinewood: Slough Campus |
Pinewood Group, owned by Aermont Capital, has revised its 2023 plans for a 1.4 million sqft film studio expansion west of London.
|
| 11.72 miles | iomart DC5 Maidenhead |
The facility was originally built and opened by the hosting provider RapidSwitch. iomart then acquired RapidSwitch in May 2009 for approximately £5.25 million.
|
| 12.14 miles | CyrusOne: LON6 Bldg6 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 12.16 miles | CyrusOne: LON6 Bldg5 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 12.18 miles | CyrusOne: LON6 Bldg4 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 12.19 miles | CyrusOne: LON6 Bldg3 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 12.21 miles | CyrusOne: LON6 Bldg2 |
This facility will be part of CyrusOne's LON6 Campus in London.
|
| 12.23 miles | CyrusOne: London LON6 |
CyrusOne is set to expand its presence in the greater London area with a new, sixth data center campus in Iver Heath, Buckinghamshire.
|
| 12.42 miles | Colt: London 5 |
This facility is a part of Colt's London Hayes Campus in West London.
|
| 12.45 miles | Colt: London Hayes LON4 |
Colt DCS is set to double the size of its planned data center campus in Hayes, West London, after acquiring a fresh parcel of land.
|
| 12.47 miles | Colt: London 6 |
This planned facility is part of Colt's London Hayes Campus in West London.
|
| 12.55 miles | Colt: London 7 |
This planned facility is part of Colt's London Hayes Campus in West London.
|
| 12.61 miles | Colt: London 8 |
This planned facility is part of Colt's London Hayes Campus in West London.
|
| 13.09 miles | Centersquare: Reading LHR3 |
Southern Electric provides power feeds
Power density minimum(W/sf) = 150
|
| 13.13 miles | Digital Realty: London (Chessington) LHR13 |
The 50,000 sq ft technical Tier III+ rated Chessington facility has five data halls each of about 1,000 sq m and with 1,440kW Uninterruptible Power Supply (UPS) capacity
|
| 15.13 miles | Kao Data: Northolt |
Kao Data's Northolt site is in West London, inside the M25. It's easy to reach from central London and Heathrow Airport.
|
| 15.14 miles | Barclays Data Centre | |
| 15.32 miles | Redwire: London |
In 2010, Kingmead Homes were appointed Project Managers for Redwire DC’s 45,000 sq ft state-of-the-art data centre in Ealing Broadway, delivered alongside a 165-bed Premier Inn hotel on a 25-year lease.
|
| 15.86 miles | Pulsant: Reading SE-4 |
|
| 15.93 miles | Vision247: London |
Located in the heart of West London’s media hub, the Vision247 Chiswick Data Centre is a specialized boutique facility tailored for the broadcasting and digital media industries.
|
| 16.12 miles | QuickHostUK: High Wycombe |
Located in High Wycombe, Buckinghamshire, QHUK DC1 is a purpose-built, privately owned data center operated by QuickHost (formerly QuickHostUK).
|
| 16.55 miles | Asanti: Reading |
The Asanti Reading Data Centre is a Tier 3-standard facility offering over 13,000 sq. ft. of whitespace.
|
| 16.61 miles | Stellanor: Reading |
Stellanor acquired the site from Redcentric plc as part of a larger deal involving eight UK data centers.
|
| 16.87 miles | Pulsant: Reading SE-3 |
|
| 16.90 miles | Amito Reading | |
| 16.98 miles | Ark: Alliance Park |
Ark Data Centres acquired the Renault Retail Group’s West London site expecting to start construction of the data centre in 2022. The site will go live in 2025.
|
| 17.26 miles | Equinix London LD3 | |
| 17.76 miles | Segro Pure Premier Park |
Segro, a leading property investor, has joined forces with Pure DC to develop a 30,000 square meter (322,915 square foot) data center in West London.
|
| 17.78 miles | Hyperscale Data Center Request Dataset |
Microsoft has started building a new £1 billion data center in Park Royal, west London, with construction scheduled to finish by early 2026.
|
| 17.81 miles | Vantage London I Campus |
Vantage's LHR-1 data center spans 430,000 sq ft (40,000 sqm) across two multi-story data centers.
|
| 17.86 miles | Equinix London LD9 Powergate |
LD9 is located in West London's Park Royal campus. The data centre was a Telecity managed facility before Equinix acquired Telecity in July 2016.
|
| 17.87 miles | Vantage London II |
Located in Park Royal in West London, LHR2 is a six-story data center spanning 194,000 square feet (18,000 sqm).
|
| 17.91 miles | Options West London | |
| 17.94 miles | Colt Powergate |
The Powergate data center is outside of the heart of the city but within zone 2, making the site easily accessible. This Colt tier III facility provides over 3,700m2 of data centre space and 15 MVA of power.
|
| 18.19 miles | Wycombe Air Park |
The 13-hectare site will feature six data centre buildings, a substation, and a gatehouse, encompassing approximately 580,000 square feet.
|
| 18.37 miles | CapitaLand: Cressex Business Park |
Cressex Business Park is a colocation data centre comprising a single-storey unit and a two-storey office.
|
| 18.39 miles | DRT London (Cresses Business Park) |
CapitaLand Ascendas REIT acquired this data center from Digital Realty in 2021.
|
| 19.54 miles | Lunar 5 |
Lunar 5 is described as a “premium data-center facility” with 7,400 m² of net customer space across eight data halls.
|
| 19.61 miles | CapitaLand: Chess Building |
In 2023, CapitaLand acquired the building from Digital Realty for $159 million.
|
| 19.69 miles | DRT London (Croydon) | |
| 19.73 miles | CapitaLand: Croydon |
Croydon is a two-storey colocation data centre located 19 km south of Central London on the Prologis industrial estate.
|
April 15, 2024
London
March 29, 2024
London
February 29, 2024
London
January 10, 2024
London
November 18, 2023
London
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas