Verizon: Waynesville, OH

Latest Podcast 9073 Lytle-Ferry Rd
Operational
Fully operational facility
Operated by:

Verizon: Waynesville, OH

Year Built: 1979
Utility Provider: AES Ohio
Ownership: Verizon Enterprise owns the building.
Lot Size: 7 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Verizon runs this network node on Lytle-Ferry Road near Waynesville, in Warren County. MCI built it on its long-haul network, and the site passed to Verizon when Verizon bought MCI in 2006. Verizon has offered colocation here in cabinets and cages as one of its Standard data centers.

Site History

  • 2006: Verizon buys MCI.
  • 1996: Both buildings are renovated.
  • 1992: A rear expansion enlarges the main building.
  • 1986: MCI adds the main building.
  • 1979: MCI builds the first building.

Map and Nearby Locations

9073 Lytle-Ferry Rd
Verizon Enterprise Sites
Nearby Facilities

Sites within 15 miles of Verizon: Waynesville, OH

Distance Site About
6.46 miles LexisNexis Springboro
LexisNexis opened its Springboro data center in 2012 as the first tenant of IO's modular facility south of Dayton, Ohio, now Iron Mountain OHS-1.
6.47 miles Iron Mountain: Miamisburg (OHS-1)
Iron Mountain's OHS-1 is a colocation data center south of Dayton, Ohio, converted from a retail building by IO in 2012 and acquired by Iron Mountain in 2018.
6.74 miles Encore Technologies MSB1
Encore Technologies' MSB1 data center on Springboro Pike in Miamisburg, Ohio, a former LexisNexis data center that Encore bought in 2022.
10.00 miles Reynolds and Reynolds: Kettering
Reynolds and Reynolds runs a data center at its headquarters campus in Kettering, Ohio, where it hosts dealership data for its automotive software customers.
10.45 miles Brightspeed: Lebanon
Brightspeed central office at 20 North Mechanic Street in downtown Lebanon, Ohio. The 32,520 sq ft building dates to 1973 and was offered for a sale-leaseback in 2025.
13.19 miles Lumen Dayton
Lumen owns a small network and colocation building on South Broadway in Dayton, Ohio, built by Williams Communications.
13.65 miles CyrusOne Cincinnati-Lebanon
CyrusOne's CIN5 data center sits on a 123-acre campus at 401 Kingsview Drive in Lebanon, Ohio, about 30 minutes northeast of downtown Cincinnati. CyrusOne markets the campus as CIN5 and CIN7.
13.66 miles Lumen Dayton 3
Lumen runs a small colocation and network suite in the Fifth Third Center tower in downtown Dayton, Ohio, a site that began with tw telecom.
13.72 miles CyrusOne Lebanon CIN7
CIN7 is CyrusOne's second data center on its 123-acre Lebanon, Ohio campus at 401 Kingsview Drive, alongside CIN5. CyrusOne markets the campus as build-to-suit capacity.
13.79 miles DataYard: Dayton
DataYard's colocation data center in the 130 Building on West Second Street in downtown Dayton, Ohio, built in 2012.
13.83 miles AT&T: Dayton Main
AT&T's main telephone exchange for Dayton, Ohio, in the 1930 Ohio Bell Telephone Building on West Second Street downtown.
13.89 miles AT&T: Dayton 300 W 1st St
AT&T's four-story telephone equipment building on West First Street in downtown Dayton, Ohio, on the same block as its main exchange.
15.04 miles U.S. Air Force: IT Complex (Bldg 802)
Wright-Patterson Air Force Base's Information Technology Complex near Dayton, Ohio, a 2012 building with a below-grade data center for Air Force research computing.
15.32 miles U.S. Air Force: AFRL DSRC (Bldg 676)
The Air Force Research Laboratory's DoD Supercomputing Resource Center at Wright-Patterson Air Force Base near Dayton, Ohio.
17.08 miles Landmark Dividend: Dayton, OH
Landmark Dividend's vacant single-story data center in north Dayton, Ohio, available for lease or sale since Radian moved out in 2025.
17.61 miles TAC: Wilmington, OH
Ardent's proposed data center campus on 545 acres at the southwest edge of Wilmington, Ohio, ended in 2026 when the developer withdrew and voters reversed the rezoning.
17.70 miles Cloud PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.69 miles Park TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.69 miles MVECA: Yellow Springs
MVECA's data center at its Yellow Springs, Ohio headquarters, which serves school districts and local governments across southwest Ohio.
19.84 miles Campus UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.86 miles Prologis: Cincinnati, Ohio
Prologis is building Project Mila, a four-building data center campus of about 899,000 sq ft on 144 acres off Arnold Brown Industrial Drive in Trenton, Ohio, for Amazon Web Services. The campus has its own substation, fed from the adjacent Woodsdale 345 kV substation.
19.91 miles West PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.96 miles Park TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Verizon Signs $2B-Plus Dark Fiber Deal With AWS
[Verizon](https://baxtel.com/data-centers/verizon-enterprise) will supply dark fiber to Amazon Web Services ([AWS](https://baxtel.com/data-centers/amazon-aws)) under an agreement worth more than $2...

Verizon Signs $2B-Plus Dark Fiber Deal With AWS

October 27, 2026 Amazon AWS

Verizon will supply dark fiber to Amazon Web Services (AWS) under an agreement worth more than $2 billion, the carrier said on Oct. 26. Verizon disclosed the deal in its third-quarter results. The carrier provides the high-capacity fiber links, and AWS is the customer that uses that connectivity...

Read more
Read Verizon Secures Approval for $20bn Frontier Acquisition
Verizon Secures Approval for $20bn Frontier Acquisition

Verizon Secures Approval for $20bn Frontier Acquisition

January 16, 2026 Verizon Enterprise

Verizon has secured all regulatory approvals to close its acquisition of Frontier Communications. It comes as the carrier this week received approval from the California Public Utilities Commission (CPUC) to push ahead with the deal.“California isn’t just approving a merger, we’re securing real...

Read more
Read Verizon Names Dan Schulman as CEO
Verizon Names Dan Schulman as CEO

Verizon Names Dan Schulman as CEO

October 06, 2025 Verizon Enterprise

Verizon has announced former PayPal CEO Dan Schulman as the carrier's next CEO. The CEO transition at the company means that current chief Hans Vestberg steps down from the role, which he has held since 2018.“I believe in Verizon and its future, and I am honored to be chosen to serve as CEO,”...

Read more
Read Verizon Launches AI-centric Network ffering
Verizon Launches AI-centric Network ffering

Verizon Launches AI-centric Network ffering

January 27, 2025 Verizon Enterprise

Verizon has launched a new AI-centric network offering called Verizon AI Connect, an integrated suite of solutions and products designed to “enable businesses to deploy artificial intelligence (AI) workloads at scale.” The telco s looking to make its underutilized data center assets available for...

Read more
Read Verizon kickstarts construction of new cell tower in Texas
Verizon kickstarts construction of new cell tower in Texas

Verizon kickstarts construction of new cell tower in Texas

February 21, 2024 Verizon Enterprise

Verizon has started construction of a new cell tower at Fort Bliss Army Post in El Paso, Texas. This tower will be constructed by Boldyn Networks and will provide connectivity to service military personnel in Texas and New Mexico. “Verizon supports our military partners through a number of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.