Boulder ~80 MW Brownfield Campus

~80 MW live at the substation, Denver/Boulder metro — path to 500 MW by 2030
Powered Land
Powered Shell
Turnkey Data Center
This listing is currently unavailable.

Property Highlights

  • ~80 MW energized at the substation today (Denver / Boulder metro)
  • Phase 2 path to 500 MW grid-connected by 2030
  • ~2.5M sqft brownfield campus on ~460 acres with existing buildings and shells
  • One building IT-ready now at ~7.3 MW, 30 kW/rack air-cooled (contractable density)
  • Fastest net-new path: Building 8, 147,000 sqft with 88,000 sqft at 40-plus-foot clear
  • On-site natural gas (40,000 MMBtu/day), 4 fiber carriers, by-right zoning
  • All structures open: land, powered shell, modular pad or full turnkey
  • IT-ready block offered as an all-in colocation lease; balance of the campus triple-net with tenant-funded build-out
  • Whole-campus offers only: the IT-ready block is not offered apart from the balance of the campus
  • 20-year term sought, with ~18 months of prepaid rent

Power & Utilities

Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
NN Request info on this listing MW
across NN Request info on this listing sites
Under Construction
NN Request info on this listing MW
NN Request info on this listing sites currently building
Planned / Prospective
NN Request info on this listing MW
NN Request info on this listing sites announced, but haven't started construction

Infrastructure Utilities

Electric Utility
Xcel Energy
Gas Utility
Symmetry / Xcel Energy
Water
Municipal supply with MGD allocation

Key Facts

Property Types
Powered Land, Powered Shell, Turnkey Data Center
Land Size
░░░░░░░░░░░ Request info on this listing
Available Power
427 MW

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Nearby Hyperscalers

3 hyperscalers within 300 km 2 hyperscale sites within 100 km Nearest ≈ 30 km
Apple, Amazon AWS, Oracle, and OpenAI: no sites within 300 km

The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.

Property Description

~80 MW energized at the substation on a ~460-acre Denver-metro brownfield campus — with a Phase 2 path to 500 MW grid-connected by 2030.

Power

  • ~80 MW at the substation, energized today; 98 MW of utility service on-site with only ~16 MW drawn
  • Utility power ~8¢/kWh (Xcel)
  • One building is IT-ready now at ~7.3 MW (60,000 sqft), leased as-is, air-cooled at 30 kW/rack with containment (the contractable density; higher at the tenant's cost), ~60–90 days to move-in (Q4 2026); a 30,000 sqft hall is fully vacant with racks in place plus about half of a second hall. It is an operating data center with other tenants, so a liquid retrofit of this building is not on offer; ~18 MW of installed critical IT across five existing purpose-built facilities
  • Fastest net-new path: Building 8, a 147,000 sqft single-storey warehouse with 88,000 sqft at 40-plus-foot clear (the balance is loading dock and support area), needing only a medium-voltage trench from the substation; plans are in the data room
  • Phase 2: 500 MW grid-connected by 2030 — utility study for 400–500 MW and a ~$275M tenant-funded transmission-line upgrade (25–30 miles); bridging generation (Bloom or similar) can energize interim buildings

Utilities & site

  • Fiber: 4 carrier-neutral providers on-site or within 1 mile
  • Water: municipal supply with MGD allocation
  • Natural gas on-site: 40,000 MMBtu/day delivery capacity
  • By-right zoning (commercial / industrial) inside the City of Boulder, whose AHJ supports the use; municipal and state incentives incl. industrial tax credit, job-growth incentive, CHIPS Act

Site

  • Brownfield campus, ~2.5M sqft of existing buildings and shells plus build-out land
  • Legacy workload vacates the IT-ready building in Q1 2027
  • Denver / Boulder metro, Colorado

Structure

  • IT-ready building: all-in colocation lease only
  • Net-new: raw land, powered shell, modular pad or full turnkey — triple-net build-to-suit, lease or sale; ownership does not self-develop, so build capital comes from the tenant
  • Whole campus only: ownership takes one counterparty on the IT-ready block plus the balance of the campus; the ~7 MW IT-ready block is not offered on its own
  • Term: 20 years sought (15 to 20 contemplated); ownership asks for about 18 months of rent prepaid and weighs tenant credit and the security deposit alongside rent; no rate card

Status

  • Actively marketed.
Request info on this listing

This listing's details are confidential

Request info on this listing

Additional Details

Zoning
Commercial / Industrial / Urban Agriculture (by-right)
Government Incentives
Municipal flexible rebate program; PACE rebates; Colorado Industrial Tax Credit; Job Growth Incentive; CHIPS Act
Pending

Find your next site

28
Listed publicly
249
Off-market, on request

Only 10% of the sites we track are listed publicly.

249 more sites aren't listed. Share your power, location and timeline and our team will match you.
Match me to sites Notify me if it returns

Site Details

Location
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ Request info on this listing
Denver
Listing Code
Boulder ~80 MW Brownfield Campus
Last Updated
Oct 26, 2026
What Baxtel does

Site selection powered by data

Site Selection

Tell us your power, location and timeline. We surface listings that fit and alert you to new ones.

Learn more

Find Colo Inventory

Colocation availability matched to your requirement.

Learn more
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.