Colchester 18 MWs
Colchester 18 MWs

Colchester 18 MWs

18 Mw On-Site Power .07kwh below local grid
Powered Land
For Sale For Lease

Property Highlights

  • 17 Acres
  • 18 Mw On-Site Power
  • A 40K–80K Sq. Ft. Pad
  • Powered By Clean Energy
  • Starting At $.07/Kwh Below Local Grid Prices

Power & Utilities

Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
NN Request info on this listing MW
across NN Request info on this listing sites
Under Construction
NN Request info on this listing MW
NN Request info on this listing sites currently building
Planned / Prospective
NN Request info on this listing MW
NN Request info on this listing sites announced, but haven't started construction

Infrastructure Utilities

Electric Utility
EverSource
Gas Utility
Yankee Gas
Behind the Meter Options
2 fuel cell generation pads, one for 4.99MW, one for 18MW, were approved by the Connecticut Siting Council

Key Facts

Property Type
Powered Land
Land Size
░░░░░░░░░░ Request info on this listing
Available Power
13 MW
Power Cost
$0.15/kWh

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Nearby Hyperscalers

2 hyperscalers within 300 km 0 hyperscale sites within 100 km Nearest ≈ 170 km
Apple, Meta, Microsoft, Oracle, and OpenAI: no sites within 300 km

The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.

Property Description

Power Capacity

  • 18 MW on-site power generation facility, permitted for
  • natural gas-fed Bloom Energy fuel cells

Lease Terms

  • Ground lease at $1/year

Power Purchase Agreement (PPA)

  • Starting at $0.15/kWh, escalating at 3% annually

Scalability

  • 40,000 sq. ft. data center pad (expandable to
  • 80,000 sq. ft. with a second floor)
  • Seller has more land in the area permitted for on-site behind-themeter power generation, thus providing expandable power capacity to meet future demands.

Fiber Providers

  • Spectrum
  • Verizon
  • Frontier
  • Crown Castle
  • Nutmeg Network

Proximity to Major Markets:

  • Hartford, CT: 25 Miles
  • Boston, MA: 104 Miles
  • Providence, RI: 61 Miles
  • New York City: 145 Miles
Request info on this listing

This listing's details are confidential

Request info on this listing

Documents & Brochures

ReNew-Developers-Amston-Road-Phase_2.pdf
1.08 MB

Site Details

Location
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ Request info on this listing
Connecticut
Listing Code
Colchester 18 MWs
Last Updated
Oct 03, 2026
What Baxtel does

Site selection powered by data

Site Selection

Tell us your power, location and timeline. We surface listings that fit and alert you to new ones.

Learn more

Find Colo Inventory

Colocation availability matched to your requirement.

Learn more
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.