Hudson Valley powered shell: 49 MW gross utility, ~36 MW critical, energized Q2 2027, turnkey Q1 2028. Lease or JV.
Powered Shell
For Lease JV

Property Highlights

  • 49 MW gross utility / ~36 MW critical, sized under the New York moratorium threshold
  • Central Hudson power contracted at 12.5 to 13 ¢/kWh, well below NY / NJ / CT metro rates
  • Energization Q2 2027; turnkey delivery quoted Q1 2028
  • Existing ~270,000 sq ft clean shell, 24 ft clear, on a heavy-infrastructure former high-tech campus
  • Entitled for data center use; power permits in place
  • Liquid-cooling-capable design, 200+ kW per cabinet
  • Six fiber providers on campus with direct long-haul backbone access
  • Water availability with on-site treatment; priority economic development site for New York State
  • Offered as a long-term lease or JV; the owner intends to retain ownership

Power & Utilities

Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
NN Request info on this listing MW
across NN Request info on this listing sites
Under Construction
NN Request info on this listing MW
NN Request info on this listing sites currently building
Planned / Prospective
NN Request info on this listing MW
NN Request info on this listing sites announced, but haven't started construction

Infrastructure Utilities

Electric Utility
Central Hudson
Water
Water availability with on-site treatment; infrastructure in place to support data-center use (gal/day capacity pending).

Key Facts

Property Type
Powered Shell
Land Size
░░░░░░░░░░░ Request info on this listing
Available Power
450 MW
Power Cost
$0.13/kWh

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Nearby Hyperscalers

2 hyperscalers within 300 km 1 hyperscale site within 100 km Nearest ≈ 90 km
Apple, Meta, Microsoft, Oracle, and OpenAI: no sites within 300 km

The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.

Property Description

A powered-shell data center conversion on a heavy-infrastructure former high-tech manufacturing campus in New York's Hudson Valley, roughly 45 miles from New York City.

Power

  • 49 MW gross utility / ~36 MW critical, deliberately sized to sit under the New York data-center moratorium threshold.
  • Served by Central Hudson off an existing on-campus substation, contracted at 12.5 to 13 ¢/kWh (delivery ~7.7¢ plus supply ~6.1¢), a >50% discount to adjacent counties, NYC and NJ.
  • Energization targeted Q2 2027; turnkey delivery quoted Q1 2028.
  • A further 150 MW sits in the NYISO queue and study, deliverable via a new on-site substation. 115 kV and 345 kV transmission both run at the campus.

Building

  • ~270,000 sq ft existing clean shell, 24 ft clear, entitled for data center use with power permits in place.
  • Cold shell today: no UPS, generators or data-center equipment. Designed liquid-cooling-capable at 200+ kW per cabinet.
  • On-site water treatment, chilled-water loops and existing heavy utility infrastructure.

Connectivity

  • Six providers serve the campus directly, with long-haul backbone immediately adjacent and routes to New York, Stamford, Boston and Ashburn.

Structure

  • Offered as a long-term lease (10 to 15 years) or JV. The owner intends to retain ownership; a sale is no longer entertained as of August 2026.
  • Turnkey build-out runs ~$10–11M/MW.
Request info on this listing

This listing's details are confidential

Request info on this listing

Additional Details

Zoning
Zone-4 data center use (permitted); power permits in place
Government Incentives
Priority Economic Development Site for New York State. Programs named for the campus include Excelsior Jobs, Green CHIPS, START-UP NY, FAST NY shovel-ready grants, Recharge NY, and New York State's tax exemption on equipment, software and electricity for qualifying data-center projects above a $15M minimum investment. No project-specific incentive package is executed yet.
Community Sentiment
Supportive. Local officials and the mayor strongly support the first phase on existing substation capacity, helped by the campus doing far more than data center.

Site Details

Location
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ Request info on this listing
New York State
Listing Code
Hudson Valley 40 MW Shell
Last Updated
Oct 18, 2026
What Baxtel does

Site selection powered by data

Site Selection

Tell us your power, location and timeline. We surface listings that fit and alert you to new ones.

Learn more

Find Colo Inventory

Colocation availability matched to your requirement.

Learn more
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.