Kansas City 18 MW Turnkey

17.8 MW critical in Kansas City, scaling to 111 MW on a 27-acre campus
Turnkey Data Center
For Lease

Property Highlights

  • 17.8 MW critical at contract + 18 months; 111 MW critical at full build
  • Tier III; 150+ kW per rack; air, liquid, or hybrid cooling
  • Power at $0.065/kWh, with utility confirmation on the first 22 MW
  • 27.4 acres, M-1 zoned, outside flood zones, low seismic risk
  • Carrier neutral, 8 miles from the Kansas City internet exchange
  • State and local incentives including a personal-property tax abatement

Power & Utilities

Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
NN Request info on this listing MW
across NN Request info on this listing sites
Under Construction
NN Request info on this listing MW
NN Request info on this listing sites currently building
Planned / Prospective
NN Request info on this listing MW
NN Request info on this listing sites announced, but haven't started construction

Infrastructure Utilities

Electric Utility
Evergy

Key Facts

Property Type
Turnkey Data Center
Land Size
░░░░░░░░░░ Request info on this listing
Available Power
111 MW
Power Cost
$0.07/kWh

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Nearby Hyperscalers

5 hyperscalers within 300 km 18 hyperscale sites within 100 km Nearest ≈ 0 km
Oracle and OpenAI: no sites within 300 km

The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.

Property Description

A Tier III turnkey data center under development on a 27-acre campus in the Kansas City metro, offered for lease.

Power

  • 17.8 MW critical at contract + 18 months; design PUE 1.35
  • A further 93.2 MW critical at contract + 36 months, via a new on-site substation
  • 150 MW utility / 111 MW critical IT at full build
  • Utility power confirmed in writing on the first 22 MW
  • Average electricity cost $0.065/kWh

Design

  • Tier III, concurrently maintainable or fault tolerant
  • UPS N+1 at data hall level; mechanical N+1 at lineup, N+4 at HU level
  • Rack densities of 150+ kW, rows to 650 kW
  • Air, liquid, or hybrid cooling; DX units with economizer, no chillers
  • 480 V or 415/240 V to rack; capacity increments of 1.5 MW or 2 MW IT
  • 286,000 sq ft whitespace across 2 floors, 16-ft ceilings, 400 W/sq ft
  • Standby 3,000 kW diesel generators (N+1)

Site

  • 27.4 acres, zoned M-1 industrial, data center permissible without rezoning
  • Outside flood zones, low seismic risk
  • Carrier neutral, 8 miles from the metro internet exchange, 14.3 million users within 20 ms
  • State and local incentives including a personal-property tax abatement
Request info on this listing

This listing's details are confidential

Request info on this listing

Additional Details

Zoning
M-1 (industrial); data center permissible without rezoning
Government Incentives
Aggressive state and local incentives, including a personal-property tax abatement.
Flood Zone
Outside flood zones.

Site Details

Location
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ Request info on this listing
Kansas City
Listing Code
Kansas City 18 MW Turnkey
Last Updated
Oct 18, 2026
What Baxtel does

Site selection powered by data

Site Selection

Tell us your power, location and timeline. We surface listings that fit and alert you to new ones.

Learn more

Find Colo Inventory

Colocation availability matched to your requirement.

Learn more
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.