Seattle WA, 24 MW Turnkey

$420,000,000
Turnkey Data Center
For Sale

Power & Utilities

Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
NN Request info on this listing MW
across NN Request info on this listing sites
Under Construction
NN Request info on this listing MW
NN Request info on this listing sites currently building
Planned / Prospective
NN Request info on this listing MW
NN Request info on this listing sites announced, but haven't started construction

Infrastructure Utilities

Electric Utility
Puget Sound Energy
Renewables
Utility power sourced from hydroelectric and wind generation

Key Facts

Property Type
Turnkey Data Center
Land Size
░░░░░░░░░░ Request info on this listing
Available Power
24 MW
Asking Price
$420,000,000

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Nearby Hyperscalers

4 hyperscalers within 300 km 2 hyperscale sites within 100 km Nearest ≈ 60 km
Apple, Meta, and OpenAI: no sites within 300 km

The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.

Property Description

Operating turnkey data center on an 86-acre private campus in Puyallup, WA, marketed to the South Seattle market.

Power. 24 MW of built critical load. An on-site 50 MW substation is dual-fed by two 115 kV transmission lines, so substation capacity materially exceeds current IT load. UPS backup is N+1 for the full critical load; backup generators are likewise N+1. Utility power is Puget Sound Energy, sourced from hydroelectric and wind.

Space and density. 50,000+ SF raised floor. High-density options run 3 to 25 kW per cabinet, alongside secure private suites. Average PUE 1.25. Built LEED Gold.

Connectivity. Seven carriers on net: CenturyLink, Click, Comcast, Level 3, Verizon, Wave, Zayo. Six pairs of dark fiber to the Westin Building Exchange.

Campus. An adjacent powered shell (SH2) sits on the same campus, plus roughly 35 acres of developable land and three non-data-center buildings.

Availability. The building is substantially leased. Roughly 1 MW was uncommitted as of November 2025. Confirm current vacancy before quoting.

Request info on this listing

This listing's details are confidential

Request info on this listing

Site Details

Location
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ Request info on this listing
Seattle
Listing Code
Seattle WA, 24 MW Turnkey
Last Updated
Oct 01, 2026
What Baxtel does

Site selection powered by data

Site Selection

Tell us your power, location and timeline. We surface listings that fit and alert you to new ones.

Learn more

Find Colo Inventory

Colocation availability matched to your requirement.

Learn more
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.