Kansas City 6 MW Shell

6 MW powered shell in the Kansas City metro, path to 20+ MW, lease only
Powered Shell
For Lease

Property Highlights

  • 6 MW committed from an on-site dual substation; MV step-down to the building due Q1 2027
  • About 40,000 SF available on slab; 18' to trusses, 24' to roof deck
  • 5 fiber optic providers; landlord delivers power, water, and fiber to demarc
  • Standard $/kW NNN lease, 10-15 year term; lease only, not for sale
  • Evergy service with a ~20 MW phase two via an additional substation, earliest 2028
  • Zoned by right; room to expand within the building shell; adjacent MEP pad

Power & Utilities

Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
NN Request info on this listing MW
across NN Request info on this listing sites
Under Construction
NN Request info on this listing MW
NN Request info on this listing sites currently building
Planned / Prospective
NN Request info on this listing MW
NN Request info on this listing sites announced, but haven't started construction

Infrastructure Utilities

Electric Utility
Evergy
Water
Landlord brings water to the demarc point.
Behind the Meter Options
Option to add capacity with on-site gas generation, subject to tenant demand.

Key Facts

Property Type
Powered Shell
Available Power
26 MW
Power Cost
$0.09/kWh

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Nearby Hyperscalers

5 hyperscalers within 300 km 18 hyperscale sites within 100 km Nearest ≈ 30 km
Oracle and OpenAI: no sites within 300 km

The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.

Property Description

A 6 MW powered shell inside a large flex building in the Kansas City metro, offered for lease only.

Power

  • 6 MW committed from an on-site dual substation; the MV step-down to the building is underway, due Q1 2027
  • Evergy service; utility rate about $0.085/kWh
  • Path to about 20 MW more from Evergy in a phase two, which requires an additional substation; the earliest read is 2028
  • Option to add capacity with on-site gas generation, subject to tenant demand

Building

  • About 40,000 SF available on slab; 18' clear to trusses, 24' to roof deck
  • Tenant space is demised from the rest of the building
  • Adjacent pad for mechanical (MEP) equipment
  • Room to expand within the shell
  • Zoned by right; building permits follow the tenant's design

Delivery

  • Landlord brings power, water, and fiber to the demarc point
  • Shell only; no data center equipment in place
  • 5 fiber optic providers

Structure

  • Standard $/kW NNN lease, 10-15 year term (15 preferred); lease only, not for sale
  • Two paths: deploy modular skids inside the shell, or the landlord builds out turnkey for a creditworthy tenant
Request info on this listing

This listing's details are confidential

Request info on this listing

Additional Details

Zoning
Zoned by right; building permits follow the tenant's design.

Site Details

Location
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ Request info on this listing
Kansas City
Listing Code
Kansas City 6 MW Shell
Last Updated
Oct 30, 2026
What Baxtel does

Site selection powered by data

Site Selection

Tell us your power, location and timeline. We surface listings that fit and alert you to new ones.

Learn more

Find Colo Inventory

Colocation availability matched to your requirement.

Learn more
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.