The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.
A 40 MW powered-shell development in Central Texas (ERCOT, Oncor distribution), sited directly adjacent to a major hyperscale campus. The parcel carries a signed 41 MW facilities-extension agreement and is engineered for roughly 30 MW of critical IT with no substation required (independent distribution feeders). All-in delivered power is approximately 7.6 cents/kWh on a 60-month fixed term. The merchant developer is flexible on deal structure — for sale, for lease, JV, or sale-leaseback, and is open to leasing the MEP while retaining ownership. Construction completes in late 2027 with readiness for service in early 2028. The site is buildable from roughly 14 MW up to the full 40 MW.
This listing's details are confidential
Request info on this listingTell us your power, location and timeline. We surface listings that fit and alert you to new ones.
Learn moreTell us what you're looking for. We respond within one business day.