Blue Spruce - Aurora
Blue Spruce - Aurora

Blue Spruce - Aurora

Powered-land campus — ~2,000 contiguous acres in the Aerotropolis corridor southeast of Denver (Aurora, CO). Single-owner sale; the buyer controls the power strategy (grid or on-site). Metro fiber at the property line and water rights in place.
Powered Land
For Sale

Property Highlights

  • ~2,000 contiguous acres — single-owner powered-land campus sale; buyer selects and controls the power strategy (no inherited vendor commitments)
  • Aerotropolis corridor SE of Denver International — ~15 min to DEN, direct I-70 access; QTS, Microsoft, and Vantage anchor the corridor; DataBank's Denver footprint ~16 mi
  • Two power paths available — a new 345 kV grid interconnection and on-site generation with Colorado Interstate Gas access nearby (power program under diligence)
  • Water rights in place with the municipal provider — no dedication, no cash-in-lieu; closed-loop hyperscale precedent in the corridor
  • Fiber: Zayo desktop engineering complete June 2026 — metro fiber at the property line, two physically diverse routes, <1.5 ms to the Denver interconnection core; second carrier engaged
  • No data-center-specific zoning restrictions; sits outside Denver's construction moratorium
  • Pricing available on request

Power & Utilities

Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
NN Request info on this listing MW
across NN Request info on this listing sites
Under Construction
NN Request info on this listing MW
NN Request info on this listing sites currently building
Planned / Prospective
NN Request info on this listing MW
NN Request info on this listing sites announced, but haven't started construction

Infrastructure Utilities

Electric Utility
PSCo (Xcel Energy)
Gas Utility
Colorado Interstate Gas (Kinder Morgan); WTG-developed Alameda Lateral (12" high-pressure, ~1.96 mi)
Water
Aurora Water rights in place — no dedication and no cash-in-lieu; buyer follows the standard utility path (published connection fees, published volumetric rates, negotiated service agreement covering capacity and delivery). Utility supply portfolio anchored by a major water-reuse system, trans-mountain supply, and terminal storage near the property; industrial users are exempt from Aurora's 2022 conservation rules. Closed-loop cooling planning basis; a hyperscale campus in the same corridor qualified for municipal water service at scale on closed-loop architecture.

Key Facts

Property Type
Powered Land
Land Size
░░░░░░░░░░░░ Request info on this listing
Available Power
250 MW

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Nearby Hyperscalers

3 hyperscalers within 300 km 2 hyperscale sites within 100 km Nearest ≈ 20 km
Apple, Amazon AWS, Oracle, and OpenAI: no sites within 300 km

The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.

Property Description

~2,000-acre powered-land campus in the Aerotropolis growth corridor of Aurora, CO (Denver Metro), offered as a single-owner sale. About 15 minutes from Denver International Airport with direct I-70 access; QTS, Microsoft, and Vantage anchor the corridor and DataBank's Denver footprint is roughly 16 miles away.

Power — the buyer selects and controls the power strategy with no inherited vendor commitments: a new 345 kV grid interconnection path and on-site generation optionality, with Colorado Interstate Gas access nearby. The power program is under active diligence (detail in the data room).

Site

  • Zoning: the City of Aurora has no data-center-specific restrictions and sits outside Denver's construction moratorium; current classification confirming.
  • Water: rights in place with the municipal provider — no dedication and no cash-in-lieu; published connection fees and rates; closed-loop hyperscale precedent in the corridor.
  • Fiber: Zayo desktop engineering complete June 2026 — metro fiber at the property line, two physically diverse routes to separate points of presence, under 1.5 ms to the Denver interconnection core; second carrier engaged.

Deal: sale of the powered-land campus; buyer runs grid, on-site, or hybrid power. Pricing available on request.

Figures subject to diligence.

Request info on this listing

This listing's details are confidential

Request info on this listing

Additional Details

Zoning
City of Aurora jurisdiction, outside Denver's construction moratorium. Current entitlement is master-plan-community zoning (~8,500 residential units); an owner-led use-by-right rezoning adding data-center use is being pursued and is the gating milestone for near-term deals (as of 2026-09; estimated 6–9 months to a decision). No data-center-specific prohibition identified.
Workforce Access
Aerotropolis corridor SE of Denver International (DEN) — ~15 min to the airport with direct I-70 access (~20 min drive to DEN, ~35 min to downtown Denver). Denver-Aurora-Centennial MSA population ~3.05M; ~150,000+ net tech workforce; 5 major university feeders (CU, CSU, Mines, UCD, Metro State); DEN offers 230+ nonstop destinations; metro median household income ~$108K. Corridor anchors: QTS (~5 mi), Microsoft and Vantage CO21 (~10 mi, under development), plus Google, Equinix, CoreSite, Flexential, Iron Mountain, and DataBank's own Denver footprint (~14–16 mi).
Government Incentives
Locally-led and negotiable: the Aurora EDC negotiates incentive packages case-by-case (sales/use-tax rebates on construction materials, permit-fee waivers, infrastructure cost-sharing). No Colorado DC-specific sales/use-tax exemption today; HB26-1030 expected to return in the 2027 session. Personal property tax assessed locally by the Arapahoe County Assessor.
Community Sentiment
City of Aurora is data-center-favorable: mayor publicly supportive of Aerotropolis industrial development; post-Nov-2025 City Council has adopted no moratorium, surtax, or industrial-use restriction; the Aurora Economic Development Council names data centers a target recruitment sector. Track record: 6 data centers operating in Aurora, plus QTS Aurora-Denver and Vantage CO21 under development. Sits outside the City and County of Denver's construction moratorium.

Site Details

Location
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ Request info on this listing
Denver
Listing Code
Blue Spruce - Aurora
Last Updated
Oct 18, 2026
What Baxtel does

Site selection powered by data

Site Selection

Tell us your power, location and timeline. We surface listings that fit and alert you to new ones.

Learn more

Find Colo Inventory

Colocation availability matched to your requirement.

Learn more
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.