The other 6 Meta buildings within 300 km are on this same campus.
The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.
A 93-acre powered-land parcel just south of Richmond, VA, fully entitled for data center use (Light Industrial). The power position is among the most advanced in the market: 230kV transmission runs on-site, a Dominion Letter of Agreement is executed for the 300 MW load, and substation design has commenced (Batch 2 cohort). Mineral rights conveyed. Gas options exist in the area but are not yet explored. Sale preferred, lease / build-to-suit open.
This listing's details are confidential
Request info on this listingTell us your power, location and timeline. We surface listings that fit and alert you to new ones.
Learn moreTell us what you're looking for. We respond within one business day.