West-Central OH 514 ac Gas+Grid Land

514-acre gas-plus-grid powered land in west-central Ohio: 350 MW BTM by 2028, 400 MW study
Powered Land
For Sale

Property Highlights

  • 350 MW behind-the-meter gas committed for 2028-01-01; 75,000 Dth supply plus a new 24-in lateral
  • 400 MW utility study resubmitted on a dual 345 kV backbone now on site; results ~Q4 2026
  • 514 ac assembled and divisible (350 / 164 / all 514)
  • I-1 Industrial zoning with data centers by right on the 164-ac core
  • Direct interstate interchange, municipal water and sewer, redundant fiber ring
  • Turnkey generation available from a Texas IPP on a lease

Power & Utilities

Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
NN Request info on this listing MW
across NN Request info on this listing sites
Under Construction
NN Request info on this listing MW
NN Request info on this listing sites currently building
Planned / Prospective
NN Request info on this listing MW
NN Request info on this listing sites announced, but haven't started construction

Infrastructure Utilities

Electric Utility
AEP Ohio
Gas Utility
Enbridge (formerly Dominion) lateral; TC Energy supply
Water
Municipal water in place
Sewer
Municipal sewer in place
Behind the Meter Options
Natural-gas self-generation, 350 MW committed for 2028-01-01: Enbridge (ex-Dominion) builds a ~1–1.5 mi 24-in lateral; TC Energy 75,000 Dth supply commitment. Generation open: a Texas IPP offers turnkey build-own on a lease and accepts non-IG credit; ~200 MW of reciprocating generation pre-reserved.

Key Facts

Property Type
Powered Land
Land Size
░░░░░░░░░░░ Request info on this listing
Available Power
750 MW

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Nearby Hyperscalers

5 hyperscalers within 300 km 21 hyperscale sites within 100 km Nearest ≈ 10 km
Apple and Oracle: no sites within 300 km

The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.

Property Description

A 514-acre powered-land assemblage in west-central Ohio running two power paths in parallel: contracted behind-the-meter gas and an in-flight transmission study.

Power: gas (committed)

  • 350 MW behind the meter as of 2028-01-01: the pipeline operator builds a ~1–1.5 mi, 24-inch lateral against a 75,000 dekatherm supply commitment
  • Generation deliberately open: a Texas IPP will build and own the plant on a lease and accepts non-investment-grade credit

Power: grid (study in flight)

  • Dual 345 kV backbone now crosses the site; utility study resubmitted at 400 MW, results expected ~Q4 2026

Land

  • 514 ac: a 164-ac core assembly plus ~350 ac of adjacent parcels under option
  • Divisible: the 350, the 164, or all 514; gas optionality attaches to the core parcel. One contiguity gap on a public road, acquirable

Site & entitlements

  • The core is zoned I-1 Industrial with data centers permitted by right. About 140 net buildable acres, sized for 6+ hyperscale buildings
  • Direct interstate interchange, triple-redundant fiber, municipal water and sewer in place
  • 75% property-tax abatement precedent and sales-tax relief on qualifying materials
  • The data-hall acreage sits outside a nearby city's 2026 data-center moratorium; only ~60 acres planned for generation fall inside city limits

Structure

  • Offered for sale
Request info on this listing

This listing's details are confidential

Request info on this listing

Additional Details

Zoning
I-1 Industrial; data centers permitted by right (164-ac core)
Workforce Access
State OhioMeansJobs training credits and co-funding. Established large-format industrial and logistics labor pool in the corridor.
Government Incentives
75% property-tax abatement (Community Reinvestment Area, county precedent). Sales-tax relief on qualifying materials through a port-authority capital lease. OhioMeansJobs workforce training credits.
Community Sentiment
County commissioners and the port authority back the project, and the host township has no moratorium. A nearby city adopted an 18-month data-center moratorium in 2026; it reaches only ~60 acres planned for generation.

Site Details

Location
░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ Request info on this listing
Toledo (Northwest Ohio)
Listing Code
West-Central OH 514 ac Gas+Grid Land
Last Updated
Nov 08, 2026
What Baxtel does

Site selection powered by data

Site Selection

Tell us your power, location and timeline. We surface listings that fit and alert you to new ones.

Learn more

Find Colo Inventory

Colocation availability matched to your requirement.

Learn more
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.