On Hold
Amarillo, TX 300 MWs
Amarillo, TX 300 MWs

Amarillo, TX 300 MWs

Powered Land
This listing is currently unavailable.

Property Highlights

  • ~3,400 ac; all mineral, water & surface rights
  • ~900 MW withdrawal + ~500 MW injection in lines
  • Kinder Morgan gas lateral ~$4M; primary fiber at property line
  • BNSF rail spur possible; room for 4,000–5,000 ac solar
  • Scales 100 MW–1 GW

Power & Utilities

Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
NN Request info on this listing MW
across NN Request info on this listing sites
Under Construction
NN Request info on this listing MW
NN Request info on this listing sites currently building
Planned / Prospective
NN Request info on this listing MW
NN Request info on this listing sites announced, but haven't started construction

Infrastructure Utilities

Behind the Meter Options
Bloom Fuel Cells

Key Facts

Property Type
Powered Land
Land Size
░░░░░░░░░░░░ Request info on this listing
Available Power
1000 MW

Location

Power lines, substations, renewable energy, and telecommunications infrastructure near this property. Use the layers button to toggle groups on and off.

Nearby Hyperscalers

2 hyperscalers within 300 km 1 hyperscale site within 100 km Nearest ≈ 90 km
Apple, Meta, Microsoft, Oracle, and OpenAI: no sites within 300 km

The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.

Property Description

A ~3,400-acre raw-land parcel in the Texas Panhandle near Amarillo, held by a single family since the 1800s and conveying all mineral, water, and surface rights (rare for Texas) plus multiple wells. The electric lines carry ~900 MW withdrawal + ~500 MW injection; a Kinder Morgan gas lateral can be brought for ~$4M; a primary fiber backbone stubs at the property line; BNSF rail allows a spur. Gigawatt-scale potential with gas, grid, and solar backstops (room for 4,000–5,000 ac of solar). Near a major nuclear-powered data-center project.

Request info on this listing

This listing's details are confidential

Request info on this listing
On Hold

Find your next site

28
Listed publicly
249
Off-market, on request

Only 10% of the sites we track are listed publicly.

249 more sites aren't listed. Share your power, location and timeline and our team will match you.
Match me to sites Notify me if it returns

Site Details

Location
West Texas area
West Texas
Listing Code
Amarillo, TX 300 MWs
Last Updated
Oct 18, 2026
What Baxtel does

Site selection powered by data

Site Selection

Tell us your power, location and timeline. We surface listings that fit and alert you to new ones.

Learn more

Find Colo Inventory

Colocation availability matched to your requirement.

Learn more
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.