The other 3 Amazon AWS buildings within 300 km are on this same campus.
The nearest data center owned by each hyperscaler. The strip shows every site out to 300 km; the shaded band is the first 100 km. Distances are rounded to the nearest 10 km for this listing.
A ~3,400-acre raw-land parcel in the Texas Panhandle near Amarillo, held by a single family since the 1800s and conveying all mineral, water, and surface rights (rare for Texas) plus multiple wells. The electric lines carry ~900 MW withdrawal + ~500 MW injection; a Kinder Morgan gas lateral can be brought for ~$4M; a primary fiber backbone stubs at the property line; BNSF rail allows a spur. Gigawatt-scale potential with gas, grid, and solar backstops (room for 4,000–5,000 ac of solar). Near a major nuclear-powered data-center project.
This listing's details are confidential
Request info on this listingOnly 10% of the sites we track are listed publicly.
No listings match your search.
Tell us your power, location and timeline. We surface listings that fit and alert you to new ones.
Learn moreTell us what you're looking for. We respond within one business day.