4.66 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
4.82 miles
|
Amazon 15465 John Marshall
|
|
4.88 miles
|
Amazon: 15455 John Marshall
|
|
4.89 miles
|
Amazon IAD-55
|
|
5.00 miles
|
NTT Gainesville VA Campus
|
|
5.38 miles
|
Yondr Bristow Campus
|
|
5.55 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
5.70 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
5.92 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
6.10 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
6.16 miles
|
Corscale: Gainesville Crossing
|
|
6.56 miles
|
Amazon IAD-73
|
|
6.61 miles
|
Amazon IAD-74
|
|
7.17 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
7.20 miles
|
Opus Interactive Manassas
|
|
7.20 miles
|
Iron Mountain VA-2
|
|
7.28 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
7.33 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
7.36 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
7.40 miles
|
Amazon IAD14
|
|
7.41 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
7.42 miles
|
Amazon Bethlehem Technology Park DC20
|
|
7.43 miles
|
Amazon IAD-52
|
|
7.43 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
7.44 miles
|
Amazon IAD-59
|
|
7.49 miles
|
Amazon Bethlehem Technology Park DC19
|
|
7.51 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
7.56 miles
|
Amazon: 8190 Bethlehem
|
|
7.60 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
7.62 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
7.62 miles
|
Amazon Bethlehem Technology Park DC18
|
|
7.62 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
7.69 miles
|
Amazon IAD-77
|
|
7.69 miles
|
Evoswitch USA WDC 1
|
|
7.69 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
7.69 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
7.77 miles
|
Amazon: 11200 Thomasson Barn
|
|
7.80 miles
|
Amazon IAD11
|
|
7.84 miles
|
Amazon: 11150 Thomasson Barn
|
|
7.86 miles
|
Amazon IAD24
|
|
7.94 miles
|
Amazon IAD7
|
|
8.08 miles
|
Amazon 7500 Bethlehem
|
|
8.32 miles
|
QTS Manassas DC5
|
|
8.41 miles
|
9040 Freedom Center
|
|
8.48 miles
|
9020 Freedom Center
|
|
8.50 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
8.58 miles
|
QTS 10680 University Blvd
|
|
8.63 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
8.70 miles
|
QTS Manassas DC1
|
|
9.10 miles
|
AWS IAD 100
|
|
9.10 miles
|
AWS IAD 101
|
|
9.20 miles
|
AWS 10281 Tanner Way
|
|
9.21 miles
|
AWS 10261 Tanner
|
|
9.60 miles
|
CloudHQ MCC2
|
|
9.60 miles
|
AOL: 7777 Infantry Ridge
|
|
9.62 miles
|
Equinix Manassas DC14
|
|
9.74 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
9.80 miles
|
CloudHQ MCC3
|
|
14.88 miles
|
Penzance: Chantilly, VA
|
Penzance is looking to develop a data center in Chantilly, VA, spanning 402,000 sq ft (37,350 sqm) across three stories.
|
15.20 miles
|
Amazon IAD61
|
|
15.24 miles
|
Amazon 41992 John Mosby Highway
|
|
15.24 miles
|
Amazon Prediction Lane
|
|
15.26 miles
|
Amazon IAD-63
|
|
15.28 miles
|
Microsoft IAD11
|
|
15.44 miles
|
Microsoft Aldie
|
|
15.45 miles
|
PowerHouse Arcola
|
|
15.53 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
15.57 miles
|
Google: Arcola 2
|
|
15.64 miles
|
Amazon 25410 Sutton Bay
|
|
15.65 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
15.65 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
15.67 miles
|
IBM Softlayer Chantilly WDC01
|
|
15.73 miles
|
Amazon IAD22
|
|
15.77 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
15.77 miles
|
Amazon 25420 Sutton Bay
|
|
15.78 miles
|
Amazon IAD1
|
|
15.79 miles
|
Gigaland: Remington, VA
|
Gigaland proposed six data centers on about 200 acres outside Remington on the south side Lucky Hill Road.
|
15.81 miles
|
Google Dulles Arcola Center
|
|
15.86 miles
|
Amazon 25020 Willard Road
|
|
15.86 miles
|
Amazon Willard Road (Land)
|
|
15.89 miles
|
Amazon IAD9
|
|
16.16 miles
|
Amazon Fadeley II
|
|
16.17 miles
|
Amazon Fadeley III
|
|
16.28 miles
|
Amazon Fadeley I
|
|
17.15 miles
|
CyrusOne Sterling IX
|
|
17.72 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
17.97 miles
|
Amazon 13600 EDS Drive
|
|
18.50 miles
|
InfoRelay Herndon
|
|