Digital Realty: MAD4

Calle de Alfonso Gómez

░░░░░░░ Login to view SqFt Total Building Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

MAD4 Technical Specifications


• Located 10 minutes from the city centre and Madrid airport
• 35,000 sqm customer space
• 99.999% uptime SLA
• N+1 Generator Backup
• 2N Uninterruptible power system (UPS)
• High Density Racks available

Connectivity


• Dual-entry fiber from two separate carrier main routes
• Access to 130+ Carriers/ISPs
• Direct access to the ESpanix and DE-CIX exchanges
• Low latency access to major hyperscale cloud service providers

Certifications


• ISO 9001
• ISO 14001
• ISO 22301
• ISO 27001
• ISO 20001
• ENS

Map and Nearby Locations:

Calle de Alfonso Gómez
Click Map to begin Search

Sites within 15 miles of Digital Realty: MAD4

Show SqM
Distance Site About
0.24 miles Hispaweb Miguel Yuste
0.34 miles Nabiax: Julián Camarillo Campus
Nabiax has begun expansion works at its Julián Camarillo Campus. In May 2024, the company announced it would add additional capacity at its Alcalá de Henares campus.
0.43 miles Digital Realty: MAD1
0.45 miles Digital Realty: MAD2
0.45 miles Digital Realty: MAD3
1.05 miles AtlasEdge: Calle de Telemaco
Former Colt facility that was acquired by AtlasEdge in 2021
2.55 miles Produban Mesena 80
2.98 miles Level3 Madrid
2.98 miles Global Switch Madrid
2.98 miles Verizon Nap of Madrid
3.16 miles IPCore Madrid
3.76 miles AtlasEdge: Madrid MAD001
4.56 miles inAsset NixMad
4.82 miles nLighten Madrid-Lezama
5.65 miles Ibercom Madrid
5.72 miles Equinix Madrid MD2
6.63 miles DATA4 Madrid - Alcobendas
Launched in 2020, the Madrid MAD01 campus is located at Avenida de la Industia 15 in Alcobendas. At full-build out, the eight-hectare campus will host six buildings.
6.66 miles Data4: MAD01 DC2
The second building of DATA4's Madrid-Alcobendas campus was completed in 2022, offering approximately 3,000 m² of white space.
6.68 miles Data4: MAD01 DC3
Data4 is developing a third data center building at its Alcobendas Campus (MAD01) in Madrid, Spain. When completed, the 15,000 sq m, 3-floor building will host 6 computer rooms.
6.76 miles Equinix MD3x
6.83 miles Equinix Madrid MD1
6.86 miles CyrusOne Madrid I
CyrusOne’s MAD1, finished in 2023, is a located in the municipality of Alcobendas. The data center will ultimately deliver 6,000 sq m (64,584 sq ft) of world-class technical space within a two-story building.
6.87 miles Equinix MD6
7.00 miles Iron Mountain MAD-1
MAD-1 is a 4,000 m² facility situated on a 60,000 m² campus in northeast Madrid. Iron Mountain acquired the campus from XData Properties in November 2022.
8.29 miles Microsoft: San Sebastian
Microsoft is constructing new data center in Madrid, Spain. The facility will be constructed in the San Sebastian de los Reyes area of Madrid and will aim for LEED Gold certification.
8.29 miles Cogent Madrid
9.47 miles Edged Energy: Madrid-Getafe
This data center is strategically positioned in Spain's central fiber and logistics hub, just minutes south of Madrid's city center.
9.48 miles Merlin: Madrid-Getafe
By the end of 2023, Merlin Properties completed the first phase of three data centers in Madrid, Barcelona, and Alava, all built in partnership with US firm Edged Energy
11.62 miles Microsoft: MAD01
12.53 miles BBVA CPD Tres Cantos
13.76 miles Form8tion: Madrid One
14.35 miles NTT Madrid 1
In 2022, NTT launched its first data center in Spain, opening a new facility outside Madrid, in the municipality of Las Rozas.
16.02 miles Data4: Madrid - San Agustin
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
16.02 miles Data4: MAD02 DC02
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
16.08 miles Data4: MAD02 DC03
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
16.09 miles Data4: MAD02 DC04
European data center operator Data4 is building a second Spanish campus outside of the capital city, Madrid.
16.12 miles Nabiax: ADC 2
Nabiax has begun expansion works at its Alcalá de Henares data center. The Nabiax ADC2 facility has already undergone expansion in multiple phases.
16.14 miles Nabiax: Alcalá de Henares
Nabiax Alcalá Campus comprises two data center buildings ADC1 & ADC2. The facility is also known as CDG Telephone Alcalá de Henares. CDG is Centro Datos Gestionado, which is translated as Managed Data Center.
16.15 miles Adam MAD Alcala

Digital Realty: MAD4 Data Center Photos

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Interxion's Data Centers in Madrid
Posted in Madrid

The illustration shows location of MAD1, MAD2, and the new MAD3 facility that will open in Q2 2019

Source: Silicon Alley Madrid

Operating Company

Digital Realty Trust, a real estate investment trust (REIT), engages in the ownership, acquisition, development, redevelopment, and management of of strategically located properties containing applications and operations critical to the day-to-day operations of technology industry tenants and corporate enterprise datacenter users.

212 Facilities Owned
41 Markets Served
2585.85 Megawatts
View Company

News

Read More News

Files

Name Date Added Description
ds_digital_realty_2401_mad4_property_factsheet_en January 2024