Flexential to Build Sixth Hillsboro Facility
September 06, 2025
Flexential
Flexential's Lindon site in Salt Lake City is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017. The rebranding from ViaWest to Flexential was announced in January 2018.
| Distance | Site | About |
|---|---|---|
| 2.49 miles | Voonami Orem SLC1 | |
| 4.78 miles | Fibernet ORM1 |
In 2002, Fibernet established its 40,000 sq ft data center in Orem, just south of Salt Lake City.
|
| 9.03 miles | B+F Timpanogos: Provo |
The B+F Timpanogos Tech Center is a proposed 132,000-square-foot data center designed to revitalize a vacant warehouse site in Provo’s East Bay neighborhood.
|
| 12.75 miles | NSA Utah Data Center |
|
| 13.78 miles | DataBank Bluffdale Granite Point Campus |
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
|
| 13.78 miles | DataBank SLC2 |
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances. |
| 13.83 miles | DataBank SLC5 | |
| 13.83 miles | DataBank SLC3 | |
| 13.87 miles | DataBank SLC4 | |
| 13.90 miles | DataBank SLC6 |
|
| 14.33 miles | Edged Energy: Bluffdale, UT |
Two buildings are planned for the site.
|
| 15.42 miles | Hyperscale Data Center Request Dataset |
Google has purchased 300 acres of land for a future campus in Eagle Mountain. The land is located in the south of the city on Pony Express Parkway, across from Facebook’s data center.
|
| 15.50 miles | Tract: Pony Express Tech Park |
The company has purchased two parcels totaling more than 668 acres in the area, with one of these parcels being the 225-acre Pony Express Technology Park.
|
| 15.67 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's Eagle Mountain campus in Utah.
|
| 15.70 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's Eagle Mountain campus in Utah.
|
| 15.76 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's Eagle Mountain campus in Utah.
|
| 15.80 miles | Hyperscale Data Center Request Dataset |
This data center is a part of Meta's Eagle Mountain campus in Utah.
|
| 15.83 miles | Hyperscale Data Center Request Dataset |
The Campus, situated at 1275 North Community Circle, began construction in 2018. The first data center on this site became fully operational in 2021.
|
| 16.02 miles | Hyperscale Data Center Request Dataset |
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
|
| 16.07 miles | Hyperscale Data Center Request Dataset |
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
|
| 16.73 miles | QTS: Eagle Mountain Campus |
QTS has begun construction of Salt Lake City 1 data center campus in Eagle Mountain, Utah.
|
| 17.50 miles | Tract: Pole Canyon Tech Park |
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
|
| 17.66 miles | Tract: Pole Canyon Expansion |
Flexential is a U.S. data center operator formed when Peak 10 acquired ViaWest in August 2017 for $1.67 billion. The company subsequently rebranded in January 2018 as a single company.
The company provides colocation, interconnection, cloud, and managed services. The company is backed by private equity firm GI Partners, which agreed to acquire Peak 10 in 2014. ViaWest was founded in 1999 in Denver and Peak 10 in 2000 in Charlotte, with each building regional data center portfolios before combining in 2017.
September 06, 2025
Flexential
November 07, 2023
Flexential
July 11, 2023
Flexential
September 12, 2022
Flexential
April 28, 2022
Flexential
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas