Site: Flexential Salt Lake (Lindon)
Company: Flexential
Metro: Salt Lake City
State: Utah
Country: United States
Region: North America
Region: Americas
Address: Usable SqFt: 6,336
Total Power: 1.3 Megawatts
Flexential's Lindon site in Salt Lake City is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017. The rebranding from ViaWest to Flexential was announced in January 2018.
Power:
- A and B source power circuit delivery capabilities
- 1.5 Megawatt diesel power generation capacity
- 6,000 gallon diesel fuel supply
- Automatic power switching
- 2N 1,300 kVA UPS system
- Redundant battery strings
- Multiple redundant power distribution paths
- Branch circuit monitoring system
HVAC:
- 200 tons of redundant HVAC capacity
- Anti-static raised flooring with designated cable runs and cooled air delivery
- Hot aisle/cold aisle configuration
Compliance:
- SSAE 16 and ISAE 3402 Service Organization Control (SOC) 1 Type II
- SOC 2 Type II and SOC 3 reports
- PCI DSS
- HIPAA
- NIST 800-53
- ITAR
- US-EU Safe Harbor Privacy framework