Flexential's Lindon site in Salt Lake City is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017. The rebranding from ViaWest to Flexential was announced in January 2018.

Power:


  • A and B source power circuit delivery capabilities
  • 1.5 Megawatt diesel power generation capacity
  • 6,000 gallon diesel fuel supply
  • Automatic power switching
  • 2N 1,300 kVA UPS system
  • Redundant battery strings
  • Multiple redundant power distribution paths
  • Branch circuit monitoring system

HVAC:


  • 200 tons of redundant HVAC capacity
  • Anti-static raised flooring with designated cable runs and cooled air delivery
  • Hot aisle/cold aisle configuration

Compliance:


  • SSAE 16 and ISAE 3402 Service Organization Control (SOC) 1 Type II
  • SOC 2 Type II and SOC 3 reports
  • PCI DSS
  • HIPAA
  • NIST 800-53
  • ITAR
  • US-EU Safe Harbor Privacy framework

Map and Nearby Locations:

333 South 520 West ( Suite 150 )
Flexential Sites
Nearby Facilities

Sites within 15 miles of Flexential Salt Lake (Lindon)

Distance Site About
2.49 miles Voonami Orem SLC1
4.78 miles Fibernet ORM1
In 2002, Fibernet established its 40,000 sq ft data center in Orem, just south of Salt Lake City.
9.03 miles B+F Timpanogos: Provo
The B+F Timpanogos Tech Center is a proposed 132,000-square-foot data center designed to revitalize a vacant warehouse site in Provo’s East Bay neighborhood.
12.75 miles NSA Utah Data Center
13.78 miles DataBank Bluffdale Granite Point Campus
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
13.78 miles DataBank SLC2
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
13.83 miles DataBank SLC5
13.83 miles DataBank SLC3
13.87 miles DataBank SLC4
13.90 miles DataBank SLC6
14.33 miles Edged Energy: Bluffdale, UT
Two buildings are planned for the site.
15.42 miles Hyperscale Data Center Request Dataset
Google has purchased 300 acres of land for a future campus in Eagle Mountain. The land is located in the south of the city on Pony Express Parkway, across from Facebook’s data center.
15.50 miles Tract: Pony Express Tech Park
The company has purchased two parcels totaling more than 668 acres in the area, with one of these parcels being the 225-acre Pony Express Technology Park.
15.67 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Eagle Mountain campus in Utah.
15.70 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Eagle Mountain campus in Utah.
15.76 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Eagle Mountain campus in Utah.
15.80 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Eagle Mountain campus in Utah.
15.83 miles Hyperscale Data Center Request Dataset
The Campus, situated at 1275 North Community Circle, began construction in 2018. The first data center on this site became fully operational in 2021.
16.02 miles Hyperscale Data Center Request Dataset
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
16.07 miles Hyperscale Data Center Request Dataset
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
16.73 miles QTS: Eagle Mountain Campus
QTS has begun construction of Salt Lake City 1 data center campus in Eagle Mountain, Utah.
17.50 miles Tract: Pole Canyon Tech Park
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
17.66 miles Tract: Pole Canyon Expansion

Flexential Salt Lake (Lindon) Data Center Photos (See all)

Map of Flexential's Network and Data Center Locations
Source: Flexential

Operating Company

Operated by:

Flexential is a U.S. data center operator formed when Peak 10 acquired ViaWest in August 2017 for $1.67 billion. The company subsequently rebranded in January 2018 as a single company.

The company provides colocation, interconnection, cloud, and managed services. The company is backed by private equity firm GI Partners, which agreed to acquire Peak 10 in 2014. ViaWest was founded in 1999 in Denver and Peak 10 in 2000 in Charlotte, with each building regional data center portfolios before combining in 2017.

Flexential History:

  • In January 2018, Rebranded from Peak 10 + ViaWest to Flexential.
  • In August 2017, Peak 10 completed the acquisition of ViaWest from Shaw Communications for approximately US$1.675 billion.
  • In November 2015, ViaWest agreed to acquire INetU for US$162.5 million.
  • In June 2015, ViaWest agreed to acquire AppliedTrust.
  • In March 2000, Peak 10 was founded in Charlotte, North Carolina.
  • In April 1999, ViaWest was founded in Denver as a roll-up of ISPs
45
Facilities
16
Markets
326MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?