TPC: Payson, UT

PlannedProspective Expansion
Future facility in planning stagefacility with prospective expansion planned
Operated by:

TPC: Payson, UT

Year Planned: 2027
Utility Provider: Rocky Mountain Power
Lot Size: 10 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size

Project Profile

  • Developer: TPC Data Centers / Twin Palms Capital (develops and holds its own sites)
  • Location: Payson, UT — ~10-acre parcel
  • Building: ~150,000 sq ft, two levels; TPC's duplicatable standard design, ~10 months from permitting approval to shell online
  • Cooling: Proprietary low-water system with an on-site water-recycling pond
  • Status: Planned — in city planning as of mid-2026; first capacity targeted ~Nov 2027–Q1 2028

Utility

  • Served by Rocky Mountain Power. TPC helped the town of Payson fund a new 40 MW Rocky Mountain Power substation to serve local load, including this campus.
  • The design includes a natural-gas / hydrogen firming option.

Map and Nearby Locations

This Facility
TPC Data Centers Sites
Nearby Facilities

TPC: Payson, UT Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of TPC: Payson, UT

Distance Site
8.08 miles DCPC: Summit Ridge
12.18 miles Newfold Digital: Provo, UT
12.41 miles B+F Timpanogos: Provo
16.29 miles Fibernet ORM1
19.65 miles Voonami Orem SLC1
19.91 miles Flexential Salt Lake (Lindon)

Operating Company

Operated by:

TPC Data Centers is developing multiple data centers throughout the U.S. with a simple concept: bringing significant power and storage closer to the data source. The company recognizes that local storage, access, and distribution are crucial to meeting the surging demand of future applications for large and small organizations seeking edge capabilities with greater storage ability.
As the general manager partner, TPC Data Centers is responsible for site location, construction, and operational service contracting, as well as all due diligence for financing all projects. The company aims to unlock a new era of efficiency and sustainability in data management.
TPC Data Centers boasts a hyper-efficient operation with an industry-leading 1.10 Power Usage Effectiveness (PUE), outperforming the standard 1.35 to 1.5. This commitment to sustainability and cost-effectiveness sets TPC apart in meeting diverse data management needs.
The company offers unparalleled adaptability through its innovative modular design. TPC's models seamlessly scale to smaller sites through flexible modular vertical expansion, maximizing usable space and providing exceptional versatility. This design allows clients to grow without constraints, making TPC Data Centers an optimal choice for evolving business requirements.

0
Facilities
0
Markets

News See all

Read Valar Atomics Proposes 9.4GW Nuclear-Powered Data Center Campus in Utah
Nuclear startup Valar Atomics is seeking federal approval for Project Beehive, a data center campus on more than 9,000 acres of Bureau of Land Management property near Price, [Utah](https://baxtel....

Valar Atomics Proposes 9.4GW Nuclear-Powered Data Center Campus in Utah

October 01, 2026 Utah

Nuclear startup Valar Atomics is seeking federal approval for Project Beehive, a data center campus on more than 9,000 acres of Bureau of Land Management property near Price, Utah, that would run on 456 small modular reactors built at the site. NPR, which first reported the filing, says the plan...

Read more
Read Plans Emerge For 640-acre Data Center in Iron County, Utah
Plans Emerge For 640-acre Data Center in Iron County, Utah

Plans Emerge For 640-acre Data Center in Iron County, Utah

April 06, 2026 Utah

A 640-acre data center could be developed in Iron County, Utah. The “Antelope Data Center,” backed by developer Pronghorn Development, LLC, was discussed last Thursday during an Iron County Planning Commission meeting.The discussion aimed to “review questions related to the proposed project,”...

Read more
Read Kevin O’Leary Targets 7.5GW Data Center Development in Utah
Kevin O’Leary Targets 7.5GW Data Center Development in Utah

Kevin O’Leary Targets 7.5GW Data Center Development in Utah

February 18, 2026 Utah

TV’s Kevin O’Leary is plotting a second “Wonder Valley” development, this time in the US state of Utah, and says the scheme could offer up to 7.5GW of power for hyperscale data centers."We have under development approximately 26,000 acres across two jurisdictions with the infrastructure...

Read more
Read Zeo Energy to Supply 280MW of Power for Creekstone Energy's up to 10GW Data Center Campus in Millard County, Utah
Zeo Energy to Supply 280MW of Power for Creekstone Energy's up to 10GW Data Center Campus in Millard County, Utah

Zeo Energy to Supply 280MW of Power for Creekstone Energy's up to 10GW Data Center Campus in Millard County, Utah

February 18, 2026 Utah

US clean energy company Zeo Energy Corp has signed a Memorandum of Understanding (MoU) with AI data center company Creekstone Energy to develop 280MW of solar and storage capacity for Creekstone’s data center campus in Millard County, Utah.“AI workloads are driving unprecedented demand for power....

Read more
Read Warehouse in Provo, Utah, to be Replaced with Data Center
Warehouse in Provo, Utah, to be Replaced with Data Center

Warehouse in Provo, Utah, to be Replaced with Data Center

February 05, 2026 Utah

B+F Timpanogos is looking to redevelop a warehouse property in Provo into a data center. The two requests, set to be discussed at a Provo planning commission meeting next week, are seeking a zoning amendment to add a warehouse at 1507 S 180 E in Provo to the city’s data center overlay district...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.