Fibernet ORM1

Latest Podcast
1145 South 800 East
Operational
Fully operational facility

Fibernet ORM1

Short Code: ORM1
Year Built: 2002
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

In 2002, Fibernet established its 40,000 sq ft data center in Orem, just south of Salt Lake City. This facility offers robust connectivity through its onsite network providers: Comcast, CenturyLink, XO Communication, Integra, Verizon, American Fork Fiber, and Utopia.

Map and Nearby Locations:

1145 South 800 East
Fibernet Corporation Sites
Nearby Facilities

Sites within 15 miles of Fibernet ORM1

Distance Site About
3.47 miles Voonami Orem SLC1
4.41 miles B+F Timpanogos: Provo
The B+F Timpanogos Tech Center is a proposed 132,000-square-foot data center designed to revitalize a vacant warehouse site in Provo’s East Bay neighborhood.
4.78 miles Flexential Salt Lake (Lindon)
17.24 miles NSA Utah Data Center
17.40 miles Tract: Pony Express Tech Park
The company has purchased two parcels totaling more than 668 acres in the area, with one of these parcels being the 225-acre Pony Express Technology Park.
17.51 miles Hyperscale Data Center Request Dataset
Google has purchased 300 acres of land for a future campus in Eagle Mountain. The land is located in the south of the city on Pony Express Parkway, across from Facebook’s data center.
17.91 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Eagle Mountain campus in Utah.
17.91 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Eagle Mountain campus in Utah.
17.91 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Eagle Mountain campus in Utah.
17.92 miles Hyperscale Data Center Request Dataset
This data center is a part of Meta's Eagle Mountain campus in Utah.
17.93 miles Hyperscale Data Center Request Dataset
The Campus, situated at 1275 North Community Circle, began construction in 2018. The first data center on this site became fully operational in 2021.
18.21 miles Hyperscale Data Center Request Dataset
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
18.23 miles Hyperscale Data Center Request Dataset
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
18.54 miles DataBank Bluffdale Granite Point Campus
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
18.54 miles DataBank SLC2
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
18.58 miles DataBank SLC3
18.59 miles DataBank SLC5
18.62 miles DataBank SLC4
18.65 miles DataBank SLC6
18.87 miles QTS: Eagle Mountain Campus
QTS has begun construction of Salt Lake City 1 data center campus in Eagle Mountain, Utah.
19.10 miles Edged Energy: Bluffdale, UT
Two buildings are planned for the site.

Fibernet ORM1 Data Center Photos (See all)

Operating Company

Fibernet Corp. is a Managed Services and Colocation Provider based in Orem, Utah, with a second location in San Jose, California.

2
Facilities
2
Markets
14MW
Megawatts

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?