|
0.16 miles
|
Tract: Pole Canyon Tech Park
|
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
|
|
2.91 miles
|
QTS: Eagle Mountain Campus
|
QTS has begun construction of Salt Lake City 1 data center campus in Eagle Mountain, Utah.
|
|
3.04 miles
|
MaxInterested in this information?Contact us
|
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
|
|
3.12 miles
|
Ridge MaxInterested in this information?Contact us
|
This data center is a part of Meta's Eagle Mountain campus in Utah.
|
|
3.13 miles
|
Core PlazaInterested in this information?Contact us
|
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
|
|
3.18 miles
|
South TowerInterested in this information?Contact us
|
This data center is a part of Meta's Eagle Mountain campus in Utah.
|
|
3.34 miles
|
Station AlphaInterested in this information?Contact us
|
This data center is a part of Meta's Eagle Mountain campus in Utah.
|
|
3.43 miles
|
Ridge MaxInterested in this information?Contact us
|
This data center is a part of Meta's Eagle Mountain campus in Utah.
|
|
3.50 miles
|
Central ValleyInterested in this information?Contact us
|
The Campus, situated at 1275 North Community Circle, began construction in 2018. The first data center on this site became fully operational in 2021.
|
|
3.75 miles
|
HubInterested in this information?Contact us
|
Google has purchased 300 acres of land for a future campus in Eagle Mountain. The land is located in the south of the city on Pony Express Parkway, across from Facebook’s data center.
|
|
4.35 miles
|
Tract: Pony Express Tech Park
|
The company has purchased two parcels totaling more than 668 acres in the area, with one of these parcels being the 225-acre Pony Express Technology Park.
|
|
10.87 miles
|
NSA Utah Data Center
|
|
|
14.75 miles
|
DataBank SLC3
|
|
|
14.80 miles
|
DataBank SLC6
|
|
|
14.82 miles
|
DataBank SLC2
|
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
|
|
14.82 miles
|
DataBank Bluffdale Granite Point Campus
|
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
|
|
14.88 miles
|
DataBank SLC4
|
|
|
14.91 miles
|
DataBank SLC5
|
|
|
15.25 miles
|
Edged Energy: Bluffdale, UT
|
Two buildings are planned for the site.
|
|
17.66 miles
|
Flexential Salt Lake (Lindon)
|
|
|
18.09 miles
|
Content Data CenterInterested in this information?Contact us
|
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
|
|
18.14 miles
|
Content Data CenterInterested in this information?Contact us
|
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
|
|
18.15 miles
|
Content Data CenterInterested in this information?Contact us
|
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
|
|
18.39 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Oracle's 235,000 sqft, Tier III data center is located in the Salt Lake City metropolitan area.
|
|
18.63 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
Aligned Energy (SLC-5) is a 450,000 sqft of data center in West Jordan, Utah.
|
|
18.85 miles
|
Novva: West Jordan Campus
|
The campus plan involves constructing four buildings with a total investment of $1 billion. The first phase, launched in 2023, features a 300,000-square-foot building.
|
|
18.86 miles
|
Novva: West Jordan 2
|
Phase Two of Novva’s West Jordan Campus project began construction in December 2023. It includes the campus’s second building, which measures 318,000 square feet (29,543 square meters).
|
|
18.87 miles
|
Novva: West Jordan 3
|
The third building of Novva’s West Jordan campus stands as a massive 318,000-square-foot (29,543-square-meter) facility.
|
|
19.95 miles
|
Aligned SLC-03
|
|