Newfold Digital: Provo, UT

Latest Podcast 1958 S 950 E
Operational
Fully operational facility
Operated by:

Newfold Digital: Provo, UT

Year Built: 2013
PUE: 1.1
Utility Provider: Provo Power
Floors: 2
Lot Size: 2 acres
░░░ Request Dataset MW
Operational Power
░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Site History

  • 2013: The Provo facility hosted core network infrastructure for Endurance International Group hosting brands, including Bluehost and HostGator (Source: Data Center Knowledge).
  • 2014: Endurance International Group signed a 10-year master services agreement with Ace Data Centers for its Provo facility, an 8,500 sq ft raised-floor data center (Source: Bisnow, citing SEC filings).
  • 2021: Endurance International Group combined with Web.com to form Newfold Digital.

Project Profile

  • Operator: Newfold Digital, the parent of Bluehost, HostGator, Web.com and Network Solutions.
  • Location: East Bay district of Provo, Utah, on a site of about 2.4 acres.
  • Data halls: about 8,500 sq ft of raised floor across three halls, built in the building's enclosed courtyard. The first floor has room for 4,000 to 5,000 sq ft of additional white space.
  • Cooling: a chilled-water plant of about 1,200 tons across six chillers, with adiabatic wet decks, a 23,000-gallon thermal storage tank and outside-air economization.
  • Backup power: diesel generators in an N+1 configuration.
  • Connectivity: two meet-me rooms and four fiber providers, including Zayo dark fiber.
  • Operations: staffed 24x7 with on-site electrical and HVAC technicians and 24-hour security.

Map and Nearby Locations

1958 S 950 E
Newfold Digital Sites
Nearby Facilities

Newfold Digital: Provo, UT Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Newfold Digital: Provo, UT

Distance Site About
0.83 miles B+F Timpanogos: Provo
The B+F Timpanogos Tech Center is a proposed 132,000-square-foot data center designed to revitalize a vacant warehouse site in Provo’s East Bay neighborhood.
5.09 miles Fibernet ORM1
In 2002, Fibernet established its 40,000 sq ft data center in Orem, just south of Salt Lake City.
8.50 miles Voonami Orem SLC1
9.78 miles Flexential Salt Lake (Lindon)
12.18 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.37 miles Tract: Pony Express Tech Park
The company has purchased two parcels totaling more than 668 acres in the area, with one of these parcels being the 225-acre Pony Express Technology Park.
19.66 miles Metro HubInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by:
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.