NSA Utah Data Center

Operational
Fully operational facility

NSA Utah Data Center

░░░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

The mammoth NSA data center, which cost some $1.7 billion, will allow the NSA to store more and, perhaps more importantly, keep data for much longer. At the time when it was under construction, the Utah facility was the Department of Defense’s largest ongoing construction project in the continental U.S. It was completed in 2014.

NSA chose the Bluffdale location because electricity is cheaper here, and land more easily available. The center will constantly use 65 megawatts of power -- enough to power 33,000 houses.

The site has (4) four 25,000 sqft data halls. Each data hall will have up to 18.75 megawatts of critical power.

Map and Nearby Locations

N 11600 W
National Security Agency Sites
Nearby Facilities

Sites within 15 miles of NSA Utah Data Center

Distance Site About
3.97 miles DataBank SLC3
4.02 miles DataBank SLC6
4.02 miles DataBank SLC2
T
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
4.02 miles DataBank Bluffdale Granite Point Campus
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
4.09 miles DataBank SLC4
4.11 miles DataBank SLC5
4.53 miles Edged Energy: Bluffdale, UT
Two buildings are planned for the site.
10.76 miles Tract: Pole Canyon Tech Park
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.
10.83 miles Aligned SLC-03
10.87 miles Tract: Pole Canyon Expansion
10.94 miles Aligned SLC-02
Aligned's SLC-02 Data Center is located in West Jordan, Utah. This is the second building of Aligned's Salt Lake City data center campus with 48MW capacity.
11.02 miles Hyperscale Data CenterInterested in this information?Contact us
Oracle's 235,000 sqft, Tier III data center is located in the Salt Lake City metropolitan area.
11.08 miles Content Data CenterInterested in this information?Contact us
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
11.13 miles Aligned Salt Lake City
Situated on 55 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a colocation data center delivering 34 MW of critical capacity.
11.13 miles Content Data CenterInterested in this information?Contact us
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
11.22 miles Content Data CenterInterested in this information?Contact us
This facility is part of eBay's Topaz data center campus in South Jordan, Utah.
11.40 miles Verizon: 8871 South Sandy
Former XO site
11.42 miles North PointInterested in this information?Contact us
This data center is a part of Meta's Eagle Mountain campus in Utah.
11.51 miles ProInterested in this information?Contact us
This data center is a part of Meta's Eagle Mountain campus in Utah.
11.64 miles Novva: West Jordan 2
Phase Two of Novva’s West Jordan Campus project began construction in December 2023. It includes the campus’s second building, which measures 318,000 square feet (29,543 square meters).
11.68 miles Novva: West Jordan Campus
The campus plan involves constructing four buildings with a total investment of $1 billion. The first phase, launched in 2023, features a 300,000-square-foot building.
11.70 miles Carrier-Neutral Data CenterInterested in this information?Contact us
Aligned Energy (SLC-5) is a 450,000 sqft of data center in West Jordan, Utah.
11.74 miles Center BetaInterested in this information?Contact us
This data center is a part of Meta's Eagle Mountain campus in Utah.
11.74 miles Point UltraInterested in this information?Contact us
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
11.74 miles Novva: West Jordan 3
The third building of Novva’s West Jordan campus stands as a massive 318,000-square-foot (29,543-square-meter) facility.
11.75 miles WestInterested in this information?Contact us
Google has purchased 300 acres of land for a future campus in Eagle Mountain. The land is located in the south of the city on Pony Express Parkway, across from Facebook’s data center.
11.85 miles Center PrimeInterested in this information?Contact us
This data center is a part of Meta's Eagle Mountain campus in Utah.
11.87 miles Campus TwoInterested in this information?Contact us
In 2022, Meta announced plans for a mega expansion of the Eagle Mountain Site. This latest addition, consisting of two buildings, will increase the campus by approximately 2 million square feet.
11.95 miles ProInterested in this information?Contact us
The Campus, situated at 1275 North Community Circle, began construction in 2018. The first data center on this site became fully operational in 2021.
11.98 miles Cirrus DS View 78
Announced in July 2017, the Cirrus Data Services View 78 Campus is under construction. The first phase will support 224,000 sqft and a critical IT load of 32 MW. At full capacity, the campus will expand to 160 MW and over 1 million square feet.
12.28 miles QTS: Eagle Mountain Campus
QTS has begun construction of Salt Lake City 1 data center campus in Eagle Mountain, Utah.
12.37 miles Tract: Pony Express Tech Park
The company has purchased two parcels totaling more than 668 acres in the area, with one of these parcels being the 225-acre Pony Express Technology Park.
12.75 miles Flexential Salt Lake (Lindon)
13.59 miles Flexential Salt Lake (South View)
15.10 miles Voonami Orem SLC1
15.85 miles Flexential Salt Lake (Cottonwood)
17.24 miles Fibernet ORM1
In 2002, Fibernet established its 40,000 sq ft data center in Orem, just south of Salt Lake City.
18.07 miles Flexential Salt Lake (Mill Creek)
19.73 miles Senawave

Operating Company

0
Facilities
0
Markets
0MW
Megawatts

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?