Expedient Phoenix

Latest Podcast
2475 West Townley Avenue
Operational
Fully operational facility
Operated by:

Expedient Phoenix

Year Built: 2010
This site is leased from Five 9s Digital in the Five 9s: Blue Shield Phoenix building
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

In 2021, Five 9s Digital acquired the 46,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield, and subsequently leased it to Expedient.

Originally commissioned in 2010 as a build-to-suit Tier III data center for Blue Cross, the site was part of a complex of Blue Cross-occupied facilities.

Map and Nearby Locations:

2475 West Townley Avenue
Expedient Data Centers Sites
Nearby Facilities

Sites within 15 miles of Expedient Phoenix

Distance Site About
0.02 miles Five 9s: Blue Shield Phoenix
In 2021, Five 9s Digital acquired the 45,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield.
5.53 miles eBay Arizona
eBay's data center is also known as Project Mercury.
6.01 miles DataBank Phoenix PHX1
6.35 miles Aligned: Peoria Logistics Park
Aligned Data Centers firm acquired nearly 80 acres at the Peoria Logistics Park for $43.2 million in Peoria.
6.46 miles Aligned Phoenix
Aligned's PHX-01/02/03 data center campus in Union Hills, Phoenix, AZ, spans 550,000 sq ft with 180 MW of capacity.
6.46 miles Evocative: PHX1
6.56 miles Lumen Phoenix 2
6.88 miles Aligned: PHX-08
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
6.95 miles Aligned: PHX-09
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
7.45 miles 20435 N 26th
7.92 miles NexusTek Phoenix
NexusTek Acquired Phoenix-based CyberTrails in 2017.
8.15 miles 5CDC: Phoenix PHX01
5C Data Centers is building a data center campus in Arizona. The first facility at the site, PHX01, is scheduled to go live in 2025.
8.17 miles QTS Phoenix Van Buren
QTS acquired this site via the Carpathia acquisition in 2015.
8.18 miles LightEdge: Phoenix Van Buren
8.18 miles 120 E Van Buren - Digital Realty
120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix. The building is also home to many colocation operators including AIS, QTS, Sungard, XO
8.26 miles Flexential Phoenix Deer Valley
Flexential's Phoenix site is former ViaWest. A and B source power circuit delivery capabilities Multiple medium voltage utility power feeds
8.77 miles Metrobloks: Phoenix PHX-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the heart of downtown Phoenix, with live capacity scheduled for Q2 2027.
9.40 miles Windstream Phoenix
Located in Phoenix, Arizona, this 4,400 square foot Phoenix data center is designed to serve the businesses in the Southwest. The facility was previously a PAETEC data center.
9.41 miles Lumen Phoenix 1
9.43 miles GoDaddy: Gilbert, AZ
GoDaddy’s own data center in Phoenix is more than 270,000 square feet in size. The data center features
eight data halls, 11 diesel backup generators, room for eight more pods.
9.59 miles QTS: PHX2 DC5
PHX2 DC5 data center building is a part of QTS' Phoenix Campus. QTS broke ground on this data center in 2023.
9.64 miles QTS: PHX2 DC4
PHX2 DC4 data center building is a part of QTS' Phoenix Campus.
9.68 miles QTS: PHX2 DC2
PHX2 DC2 data center building will be a part of QTS' Phoenix Campus.
9.72 miles QTS: PHX2 DC3
PHX2 DC3 data center building is a part of QTS' Phoenix Campus.
9.77 miles Stack: PHX02E
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
9.79 miles QTS: Phoenix II Campus
QTS Phoenix Data Center Campus (PHX II) sits on an 85-acre site with 5 data center buildings.
9.86 miles Stack: PHX02D
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
9.94 miles Stack: PHX02B
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
9.95 miles Stack: PHX02C
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
9.99 miles STACK Phoenix PHX02 Campus
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
10.91 miles Centersquare: Phoenix PH1
10.93 miles Liquid Web Phoenix
10.95 miles Internap Phoenix
10.95 miles Iron Mountain Phoenix
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio) 41-acre Iron Mountain Hyperscale-Ready campus 588,000 gross square feet 32 MW – redundant feeds
10.98 miles DataBank PHX2
10.99 miles Iron Mountain: AZP3
Iron Mountain has commenced construction of the AZP-3 data center and aims to launch the first phase in Q4 2025.
11.02 miles Iron Mountain: AZP2
In 2019, Iron Mountain completed the first phase of AZP-2 in Phoenix.
11.79 miles Verizon: 3930 Watkins
This facility is a former XO Communications site. In 2017, Verizon completed the $1.8 billion acquisition of XO Communications' fiber-optic network business.
11.85 miles PhoenixNAP: PHX02
PhoenixNAP will expand its Phoenix data center campus with a second building, PHX02, slated for construction in late 2025.
11.91 miles PhoenixNAP-Phoenix
PhoenixNAP is a local provider which operates the data center campus, located east of downtown near Phoenix Sky Harbor International Airport.
12.09 miles 11:11 Systems: Scottsdale
The 11:11 Systems Scottsdale data center, originally operated by Sungard Availability Services, was acquired by 11:11 Systems in November 2022.
12.45 miles Compass: El Mirage Bldg2
The facility is part of Compass El Mirage data center campus in Arizona.
12.48 miles Compass: El Mirage, AZ
The company plans to develop three single-story buildings on this property, each spanning 208,000 square feet.
12.69 miles Compass: El Mirage Bldg3
The facility is part of Compass El Mirage data center campus in Arizona.
13.03 miles Hyperscale Data Center Request Dataset
13.03 miles Hyperscale Data Center Request Dataset
Known as PHX-83, the building will total 245,500 sq ft (22,808 sqm).
13.03 miles Hyperscale Data Center Request Dataset
This Facility is a part of Microsoft's El mirage Campus in Arizona.
13.03 miles Hyperscale Data Center Request Dataset
In April 2024, the El Mirage City Council approved a site plan amendment on the existing site in El Mirage Campus, allowing Microsoft to add another 245,000 sq ft (22,760 sqm), single-story data center.
13.14 miles Hyperscale Data Center Request Dataset
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
13.40 miles Hyperscale Data Center Request Dataset
The tech giant purchased two parcels of land for over $258 million in cash on May 2024. These properties, situated at the northwest and northeast corners of North Dysart Road and West Northern Parkway, were sold by DPML Copperwing LLC.
13.41 miles Hyperscale Data Center Request Dataset
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
13.61 miles Centersquare: Phoenix PH2
13.61 miles Iron Mountain Scottsdale
Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power
13.63 miles LexisNexis Scottsdale
14.34 miles EdgeConneX Phoenix
14.80 miles Hyperscale Data Center Request Dataset
Amazon Data Services has acquired land for a potential data center campus in Laveen, Phoenix. The 220-acre site, located near Loop 202 and Dobbins Road, was purchased for $277 million ($1.2 million per acre).
14.95 miles Takanock: Project Baccara
Backed by DigitalBridge, the Project Baccara development is an ambitious 160-acre industrial project spearheaded by Takanock, located near the Luke Air Force Base.
14.97 miles Takanock: Baccara Bldg2
The facility is part of Takanock's Project Baccara in Arizona.
15.41 miles QTS: Hermosa Ranch
US data center firm QTS has acquired 206 acres in the West Valley for $246.8 million in an all-cash deal in July, 2024 from TGV Investments LLC.
15.45 miles Prime: PHX01-05
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
15.50 miles Prime: PHX01-04
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
15.55 miles Prime: PHX01-03
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
15.60 miles Prime: PHX01-02
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
15.65 miles Prime Phoenix
The Phoenix Campus is expected to be 1.3 million square feet across 5 data center buildings. The first data center is expected to be completed by Q3 2025 and total 260,400 square feet.
15.80 miles Aligned: PHX-07
Aligned Data Centers celebrated the topping-out ceremony for its PHX-07 campus in 2024. Construction of the facility began in 2023, and it is expected to become operational in 2025.
15.80 miles Aligned: PHX 07-2
PHX 07-2 is the second phase of Aligned's PHX07 campus in Phoenix. The two-story, 214,078-square-foot facility spans across six data halls.
16.05 miles Aligned: PHX 07-3
This facility is part of Aligned's PHX07 campus in Phoenix.
16.05 miles Aligned: PHX 07-4
17.00 miles Vantage: AZ15
This planned facility is a part of Vantage's Phoenix Data Center Campus in Arizona.
17.06 miles Vantage AZ14
Located directly north of the AZ1 development, AZ14 features similar design and color elements to maintain visual continuity with its predecessor.
17.11 miles Vantage: AZ13
In November 2024, Vantage Data Centers completed the topping out of the third data center building of its Phoenix Campus in Goodyear, Arizona.
17.15 miles Vantage: AZ12
This facility is a part of Vantage's Phoenix Data Center Campus in Arizona.
17.19 miles Vantage Phoenix
In January 2019 Vantage announced it acquired 50 acres outside Phoenix in Goodyear, Arizona, to build a mega-scale data center campus. Construction began in early 2019, with the first phase coming online in 2022.
17.33 miles STACK Phoenix
Stack Infrastructure (Stack) is building a data center campus on a 100-acre site in Phoenix, Arizona.
17.37 miles Compass: Phoenix I DC6
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC6 is one of the data center buildings of this campus.
17.42 miles Compass: Phoenix I DC5
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC5 is one of the data center buildings of this campus.
17.45 miles Compass: Phoenix I DC4
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC4 is one of the data center buildings of this campus.
17.47 miles Stream Goodyear AZ
Phoenix I is the first of five 40MW buildings.
17.55 miles Stream: PHX II
Stream Data Centers has topped out the second data center facility on its Goodyear Campus in August 2024.
17.56 miles Compass Phoenix
Compass Datacenters is developing a hyperscale campus in Goodyear, a suburb of Phoenix, Arizona. The project began in January 2019 when Compass acquired a 200-acre land parcel in the area.
17.60 miles Compass: Phoenix I DC7
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC7 is one of the data center buildings of this campus.
17.61 miles Stream: PHX III
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
17.64 miles Compass: Phoenix I DC2
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC2 is one of the data center buildings of this campus.
17.67 miles Centersquare: PHX1
Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.
17.67 miles Stream: PHX IV
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
17.71 miles Compass: Phoenix I DC3
Compass Datacenters is developing a hyperscale campus in Goodyear, a suburb of Phoenix, Arizona. The project began in January 2019 when Compass acquired a 200-acre land parcel in the area.
17.74 miles Stream: PHX V
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
17.75 miles Compass: Phoenix I DC8
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC8 is one of the data center buildings of this campus.
17.81 miles Stream: PHX VI
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
17.97 miles Hyperscale Data Center Request Dataset
18.04 miles Hyperscale Data Center Request Dataset
18.08 miles Hyperscale Data Center Request Dataset
18.13 miles Vantage: Glendale AZ3
In 2023, Vantage acquired nearly 34 acres from Phoenix-based industrial developer Merit Partners for $50 million, at approximately $1.5 million per acre.
18.15 miles Hyperscale Data Center Request Dataset
18.18 miles Hyperscale Data Center Request Dataset
In August 2018, Microsoft paid about $48 million for its 279-acre site near the Phoenix Goodyear Airport. The project already has three massive buildings, and Microsoft plans to construct two more buildings on the campus, for a total of five buildings.
18.57 miles QTS: Glendale Expansion
18.68 miles QTS Glendale AZ
QTS bought the property consisting of 375 acres in July 2022 for $255 million. A development timeline has yet to be announced.
19.13 miles Menlo: MD-PX1 Bldg4
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
19.18 miles Menlo: MD-PX1 Bldg5
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
19.20 miles Menlo: MD-PX1 Bldg2
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
19.24 miles Menlo: MD-PX1 Bldg3
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
19.25 miles Menlo: MD-PX1 (Phoenix)
Menlo Digital's MD-PX1 (Phoenix) data center campus consists of five buildings on 38 acres. The campus will span 1,022,400 square feet.
19.45 miles Hyperscale Data Center Request Dataset
Microsoft paid DRI FR Goodyear LLC $37 million for the 147 acre lot in Goodyear on April 15, 2019.
19.47 miles Hyperscale Data Center Request Dataset
19.52 miles 2055 E Technology - Digital Realty
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix. The building is SOC2 certified with 24/7 security and critical facilities management.
19.64 miles 2010 East Centennial
Digital Realty sold the office & data center building in 2018 to an unnamed company. We believe Fox Sports is the tenant.

Expedient Phoenix Data Center Photos (See all)

Exterior of the Phoenix facility
Source: Baxtel

Operating Company

Operated by:

Expedient is a provider of cloud and data center infrastructure as a service (IaaS) with local operations in Baltimore, MD; Boston, MA; Cleveland, OH; Columbus, OH; Indianapolis, IN; Memphis, TN and Pittsburgh, PA.

Expedient History

  • Sep 2001 Founded as US VoiceData. (Cleveland, Ohio)
  • Dec 2001 Acquired RMRC. (Cleveland, Ohio)
  • Apr 2002 Acquired Expedient. (Cleveland, South Florida)
  • May 2002 Acquired Yipes Markets. (Boston, Miami, PIttsburgh)
  • Feb 2003. Acquired 6 Verio Markets.(Ohio, Tampa, Sacramento, Syracuse, Topeka)
  • Jun 2003. Acquired APK. (Northeast Ohio)
  • Oct 2003 Acquired Stargate. (Pittsburgh, Erie and Hagerstown, MD)
  • Oct 2005 Acquired by Continental Broadband, a Landmark Communications Company
  • Feb 2007 Acquired Data Center business of SafeCore (Boston, MA)
  • Jan 2007 Expanded into Indianapolis via our sister company, nFrame
  • Feb 2008 Over $1 million in expansion in Cleveland
  • May 2008 Expedient expands to 2nd data center in Pittsburgh (Allegheny Center Mall)
  • Aug 2008 Invests in a $4.8 Million build of 2nd data center (Cleveland)
  • Aug 2008 Became PCI-DSS compliant through self-attestation
  • Dec 2008 All offices become interconnected with a 10GB fiber backbone
  • Oct 2009 Opened 2nd Data center (Cleveland)
  • Dec 2009 Launch Operations Support Center (OSC)
  • Dec 2010 Opened first Columbus data center- 14,000 square feet
  • Jan 2011 Expand Boston Data Center by 3,600 square feet
  • Feb-Jul 2011 Multi million dollar power plant upgrade (Cleveland and Pittsburgh)
  • Dec 2011 Expansion of 2nd Baltimore Data center- 10,000 additional square feet
  • Apr 2012 Expansion of 152 Cleveland data center- 7,000 additional square feet
  • Nov 2013 Second Baltimore Data Center opened in Owings Mills area – 21,000 square feet
  • Dec 2013 Expansion of Pittsburgh ACM Data center- additional 8,000 square feet for a total of 30,000 square feet of space
  • Feb 2014 Expedient named to CRN top data center list for second year in a row
  • Sept 2014 Announcement of 2nd Columbus Data Center in Dublin, Ohio to be built from the ground up
  • Oct 2014 Announcement of 7th market, Memphis, TN with an open date of mid-year 2015
  • Jan 2015 151 NEO facility data center expansion completed – 6,000 sq ft added
  • July 2015 Opened First Memphis Data Center
  • Nov 2015 Opened Second Columbus Data Center in Dublin, OH
  • Nov 2015 Achievement of Payment Card Industry (PCI) Data Security Standard (DSS) Attestation of Compliance (AOC) for Report on Compliance (ROC) from Qualified Security Assessor (QSA)
  • March 2016 Expansion of Boston data center (8,000 sq. ft.)
  • July 2016 Offers SlimLine Cage for colocation
  • August 2016 Offers Push Button DR 2.0 with Software Defined Networking
  • September 2016 Offers On-Site Private Cloud with Disaster Recovery as a Service
  • June 2017 Receives recognition in Gartner Magic Quadrant for Disaster Recovery as a Service
  • Receives recognition as a Top 10 MSP Worldwide from MSP Mentor
  • December 2017 Expansion of Pittsburgh ACM (Nova Place) data center (10,000 sq. ft.)
  • Expansion of Indianapolis data center (3,500 sq. ft.)
  • February 2018 Recognized on CRN’s Data Center 100 list
  • May 2018 Named Zerto’s Growth Partner of the Year – Cloud Services Provider
  • June 2018 Named #7 managed services provider in the world on the MSP 501 Completed network backbone upgrade to 100 Gbp/s
  • July 2018 Positioned in Gartner Magic Quadrant for Disaster Recovery as a Service
15
Facilities
7
Markets
37MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?