NexusTek Acquired Phoenix-based CyberTrails in 2017.
| Distance | Site | About |
|---|---|---|
| 0.36 miles | Flexential Phoenix Deer Valley |
Flexential's Phoenix site is former ViaWest.
A and B source power circuit delivery capabilities
Multiple medium voltage utility power feeds
|
| 0.94 miles | 20435 N 26th |
|
| 1.54 miles | Evocative: PHX1 |
|
| 1.54 miles | Aligned Phoenix |
Aligned's PHX-01/02/03 data center campus in Union Hills, Phoenix, AZ, spans 550,000 sq ft with 180 MW of capacity.
|
| 1.87 miles | Aligned: PHX-09 |
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
|
| 1.89 miles | Aligned: PHX-08 |
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
|
| 7.92 miles | Expedient Phoenix |
In 2021, Five 9s Digital acquired the 46,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield, and subsequently leased it to Expedient.
|
| 7.94 miles | Five 9s: Blue Shield Phoenix |
In 2021, Five 9s Digital acquired the 45,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield.
|
| 10.99 miles | 11:11 Systems: Scottsdale |
The 11:11 Systems Scottsdale data center, originally operated by Sungard Availability Services, was acquired by 11:11 Systems in November 2022.
|
| 11.20 miles | Aligned: Peoria Logistics Park |
Aligned Data Centers firm acquired nearly 80 acres at the Peoria Logistics Park for $43.2 million in Peoria.
|
| 12.04 miles | Iron Mountain Scottsdale |
Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power
|
| 12.05 miles | Centersquare: Phoenix PH2 |
|
| 12.06 miles | LexisNexis Scottsdale |
|
| 13.00 miles | eBay Arizona |
eBay's data center is also known as Project Mercury.
|
| 13.59 miles | DataBank Phoenix PHX1 |
|
| 13.95 miles | Liquid Web Phoenix |
|
| 14.14 miles | Lumen Phoenix 2 | |
| 14.84 miles | Compass: El Mirage, AZ |
The company plans to develop three single-story buildings on this property, each spanning 208,000 square feet.
|
| 14.86 miles | Compass: El Mirage Bldg2 |
The facility is part of Compass El Mirage data center campus in Arizona.
|
| 15.05 miles | Compass: El Mirage Bldg3 |
The facility is part of Compass El Mirage data center campus in Arizona.
|
| 15.82 miles | QTS Phoenix Van Buren |
QTS acquired this site via the Carpathia acquisition in 2015.
|
| 15.82 miles | 5CDC: Phoenix PHX01 |
5C Data Centers is building a data center campus in Arizona. The first facility at the site, PHX01, is scheduled to go live in 2025.
|
| 15.82 miles | LightEdge: Phoenix Van Buren | |
| 15.82 miles | 120 E Van Buren - Digital Realty |
120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix.
The building is also home to many colocation operators including AIS, QTS, Sungard, XO
|
| 15.83 miles | Hyperscale Data Center Request Dataset |
|
| 15.90 miles | Hyperscale Data Center Request Dataset |
This Facility is a part of Microsoft's El mirage Campus in Arizona.
|
| 15.93 miles | Hyperscale Data Center Request Dataset |
In April 2024, the El Mirage City Council approved a site plan amendment on the existing site in El Mirage Campus, allowing Microsoft to add another 245,000 sq ft (22,760 sqm), single-story data center.
|
| 15.97 miles | Hyperscale Data Center Request Dataset |
Known as PHX-83, the building will total 245,500 sq ft (22,808 sqm).
|
| 15.99 miles | QTS: PHX2 DC5 |
PHX2 DC5 data center building is a part of QTS' Phoenix Campus. QTS broke ground on this data center in 2023.
|
| 16.06 miles | QTS: PHX2 DC4 |
PHX2 DC4 data center building is a part of QTS' Phoenix Campus.
|
| 16.16 miles | QTS: PHX2 DC3 |
PHX2 DC3 data center building is a part of QTS' Phoenix Campus.
|
| 16.19 miles | QTS: PHX2 DC2 |
PHX2 DC2 data center building will be a part of QTS' Phoenix Campus.
|
| 16.25 miles | QTS: Phoenix II Campus |
QTS Phoenix Data Center Campus (PHX II) sits on an 85-acre site with 5 data center buildings.
|
| 16.29 miles | Hyperscale Data Center Request Dataset |
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
|
| 16.34 miles | Stack: PHX02E |
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
| 16.39 miles | Stack: PHX02D |
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
| 16.44 miles | Stack: PHX02C |
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
| 16.48 miles | Stack: PHX02B |
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
| 16.49 miles | Hyperscale Data Center Request Dataset |
The tech giant purchased two parcels of land for over $258 million in cash on May 2024. These properties, situated at the northwest and northeast corners of North Dysart Road and West Northern Parkway, were sold by DPML Copperwing LLC.
|
| 16.51 miles | Metrobloks: Phoenix PHX-A1 |
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the heart of downtown Phoenix, with live capacity scheduled for Q2 2027.
|
| 16.53 miles | Hyperscale Data Center Request Dataset |
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
|
| 16.55 miles | STACK Phoenix PHX02 Campus |
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
| 16.75 miles | Windstream Phoenix |
Located in Phoenix, Arizona, this 4,400 square foot Phoenix data center is designed to serve the businesses in the Southwest. The facility was previously a PAETEC data center.
|
| 16.80 miles | Lumen Phoenix 1 |
|
| 16.93 miles | GoDaddy: Gilbert, AZ |
GoDaddy’s own data center in Phoenix is more than 270,000 square feet in size. The data center features
eight data halls, 11 diesel backup generators, room for eight more pods. |
| 17.05 miles | Iron Mountain: AZP3 |
Iron Mountain has commenced construction of the AZP-3 data center and aims to launch the first phase in Q4 2025.
|
| 17.11 miles | Centersquare: Phoenix PH1 |
|
| 17.13 miles | Iron Mountain Phoenix |
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio)
41-acre Iron Mountain Hyperscale-Ready campus
588,000 gross square feet
32 MW – redundant feeds
|
| 17.13 miles | Internap Phoenix |
|
| 17.15 miles | DataBank PHX2 | |
| 17.25 miles | Iron Mountain: AZP2 |
In 2019, Iron Mountain completed the first phase of AZP-2 in Phoenix.
|
| 17.30 miles | Takanock: Baccara Bldg2 |
The facility is part of Takanock's Project Baccara in Arizona.
|
| 17.37 miles | Takanock: Project Baccara |
Backed by DigitalBridge, the Project Baccara development is an ambitious 160-acre industrial project spearheaded by Takanock, located near the Luke Air Force Base.
|
| 18.26 miles | Aligned: PHX 07-2 |
PHX 07-2 is the second phase of Aligned's PHX07 campus in Phoenix. The two-story, 214,078-square-foot facility spans across six data halls.
|
| 18.29 miles | Aligned: PHX-07 |
Aligned Data Centers celebrated the topping-out ceremony for its PHX-07 campus in 2024. Construction of the facility began in 2023, and it is expected to become operational in 2025.
|
| 18.48 miles | Aligned: PHX 07-3 |
This facility is part of Aligned's PHX07 campus in Phoenix.
|
| 18.52 miles | Aligned: PHX 07-4 | |
| 18.61 miles | Verizon: 3930 Watkins |
This facility is a former XO Communications site. In 2017, Verizon completed the $1.8 billion acquisition of XO Communications' fiber-optic network business.
|
| 18.96 miles | PhoenixNAP: PHX02 |
PhoenixNAP will expand its Phoenix data center campus with a second building, PHX02, slated for construction in late 2025.
|
| 18.97 miles | PhoenixNAP-Phoenix |
PhoenixNAP is a local provider which operates the data center campus, located east of downtown near Phoenix Sky Harbor International Airport.
|
January 02, 2025
Phoenix
June 27, 2023
Phoenix
May 26, 2021
Phoenix
June 07, 2017
NexusTek
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas