Iron Mountain Completes Structural Build of Chennai Data Center
April 13, 2026
Iron Mountain
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO US Datacenters which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio)
AZS-1 customers reduce data center costs with no Transaction Privilege Tax (TPT) or Use Tax (sales, etc.)
NPA NXX: 480-563
CLLI: PRVYAZPPDS0
| Distance | Site | About |
|---|---|---|
| 0.02 miles | LexisNexis Scottsdale |
|
| 0.03 miles | Centersquare: Phoenix PH2 |
|
| 1.55 miles | 11:11 Systems: Scottsdale |
The 11:11 Systems Scottsdale data center, originally operated by Sungard Availability Services, was acquired by 11:11 Systems in November 2022.
|
| 7.38 miles | Liquid Web Phoenix |
|
| 11.94 miles | Flexential Phoenix Deer Valley |
Flexential's Phoenix site is former ViaWest.
A and B source power circuit delivery capabilities
Multiple medium voltage utility power feeds
|
| 12.04 miles | NexusTek Phoenix |
NexusTek Acquired Phoenix-based CyberTrails in 2017.
|
| 12.39 miles | Aligned Phoenix |
Aligned's PHX-01/02/03 data center campus in Union Hills, Phoenix, AZ, spans 550,000 sq ft with 180 MW of capacity.
|
| 12.39 miles | Evocative: PHX1 |
|
| 12.77 miles | 20435 N 26th |
|
| 13.42 miles | Aligned: PHX-08 |
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
|
| 13.44 miles | Aligned: PHX-09 |
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
|
| 13.61 miles | Expedient Phoenix |
In 2021, Five 9s Digital acquired the 46,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield, and subsequently leased it to Expedient.
|
| 13.63 miles | Five 9s: Blue Shield Phoenix |
In 2021, Five 9s Digital acquired the 45,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield.
|
| 13.69 miles | Iron Mountain: AZP3 |
Iron Mountain has commenced construction of the AZP-3 data center and aims to launch the first phase in Q4 2025.
|
| 13.75 miles | QTS: PHX2 DC5 |
PHX2 DC5 data center building is a part of QTS' Phoenix Campus. QTS broke ground on this data center in 2023.
|
| 13.82 miles | QTS: PHX2 DC4 |
PHX2 DC4 data center building is a part of QTS' Phoenix Campus.
|
| 13.91 miles | QTS: PHX2 DC3 |
PHX2 DC3 data center building is a part of QTS' Phoenix Campus.
|
| 13.93 miles | DataBank PHX2 | |
| 13.95 miles | Internap Phoenix |
|
| 13.95 miles | Iron Mountain Phoenix |
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio)
41-acre Iron Mountain Hyperscale-Ready campus
588,000 gross square feet
32 MW – redundant feeds
|
| 13.96 miles | Centersquare: Phoenix PH1 |
|
| 13.99 miles | QTS: Phoenix II Campus |
QTS Phoenix Data Center Campus (PHX II) sits on an 85-acre site with 5 data center buildings.
|
| 14.07 miles | QTS: PHX2 DC2 |
PHX2 DC2 data center building will be a part of QTS' Phoenix Campus.
|
| 14.13 miles | Iron Mountain: AZP2 |
In 2019, Iron Mountain completed the first phase of AZP-2 in Phoenix.
|
| 14.16 miles | Stack: PHX02C |
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
| 14.22 miles | Stack: PHX02D |
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
| 14.27 miles | Stack: PHX02E |
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
| 14.30 miles | Stack: PHX02B |
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
| 14.37 miles | STACK Phoenix PHX02 Campus |
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
|
| 14.52 miles | eBay Arizona |
eBay's data center is also known as Project Mercury.
|
| 15.14 miles | DataBank Phoenix PHX1 |
|
| 15.46 miles | Lumen Phoenix 2 | |
| 15.59 miles | Centersquare: PHX1 |
Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.
|
| 16.28 miles | Verizon: 3930 Watkins |
This facility is a former XO Communications site. In 2017, Verizon completed the $1.8 billion acquisition of XO Communications' fiber-optic network business.
|
| 16.40 miles | Windstream Phoenix |
Located in Phoenix, Arizona, this 4,400 square foot Phoenix data center is designed to serve the businesses in the Southwest. The facility was previously a PAETEC data center.
|
| 16.56 miles | Lumen Phoenix 1 |
|
| 16.75 miles | QTS Phoenix Van Buren |
QTS acquired this site via the Carpathia acquisition in 2015.
|
| 16.75 miles | LightEdge: Phoenix Van Buren | |
| 16.75 miles | 120 E Van Buren - Digital Realty |
120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix.
The building is also home to many colocation operators including AIS, QTS, Sungard, XO
|
| 16.85 miles | 5CDC: Phoenix PHX01 |
5C Data Centers is building a data center campus in Arizona. The first facility at the site, PHX01, is scheduled to go live in 2025.
|
| 16.98 miles | GoDaddy: Gilbert, AZ |
GoDaddy’s own data center in Phoenix is more than 270,000 square feet in size. The data center features
eight data halls, 11 diesel backup generators, room for eight more pods. |
| 17.11 miles | PhoenixNAP-Phoenix |
PhoenixNAP is a local provider which operates the data center campus, located east of downtown near Phoenix Sky Harbor International Airport.
|
| 17.21 miles | PhoenixNAP: PHX02 |
PhoenixNAP will expand its Phoenix data center campus with a second building, PHX02, slated for construction in late 2025.
|
| 17.60 miles | Metrobloks: Phoenix PHX-A1 |
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the heart of downtown Phoenix, with live capacity scheduled for Q2 2027.
|
| 17.77 miles | EdgeConneX Phoenix |
|
| 19.80 miles | Aligned: Peoria Logistics Park |
Aligned Data Centers firm acquired nearly 80 acres at the Peoria Logistics Park for $43.2 million in Peoria.
|
Iron Mountain Data Centers is the data center business of Iron Mountain Incorporated and operates sites in the United States and Europe, with an India platform built through its partnership with Web Werks. In January 2018 it closed the acquisition of IO Data Centers, adding facilities in Phoenix and Scottsdale, Arizona, Edison, New Jersey, and Columbus, Ohio. In May 2018 it acquired EvoSwitch Netherlands, expanding into the Amsterdam market, and in 2019 it added capacity in Amsterdam and London. In India, Iron Mountain formed a joint venture with Web Werks in 2021 and in April 2025 it announced full ownership and a rebrand to Iron Mountain Data Centers India. Iron Mountain Incorporated was founded in 1951.
Iron Mountain Data Centers History:
April 13, 2026
Iron Mountain
March 18, 2026
Iron Mountain
January 02, 2025
Phoenix
November 06, 2023
Iron Mountain
October 17, 2023
Web Werks
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas