120 E Van Buren - Digital Realty

Latest Podcast
120 East Van Buren Street
Operational
Fully operational facility
Operated by:

120 E Van Buren - Digital Realty

Year Built: 2006
Ownership: Digital Realty Trust owns the building.

Sites leasing space from Digital Realty Trust:

░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix.

The building is also home to many colocation operators including AIS, QTS, Sungard, XO

Digital Realty acquired the 4 story building in 2006.

Map and Nearby Locations:

120 East Van Buren Street
Digital Realty Trust Sites
Nearby Facilities

Sites within 15 miles of 120 E Van Buren - Digital Realty

Distance Site About
0.00 miles LightEdge: Phoenix Van Buren
0.01 miles QTS Phoenix Van Buren
QTS acquired this site via the Carpathia acquisition in 2015.
0.15 miles 5CDC: Phoenix PHX01
5C Data Centers is building a data center campus in Arizona. The first facility at the site, PHX01, is scheduled to go live in 2025.
0.86 miles Metrobloks: Phoenix PHX-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the heart of downtown Phoenix, with live capacity scheduled for Q2 2027.
1.41 miles GoDaddy: Gilbert, AZ
GoDaddy’s own data center in Phoenix is more than 270,000 square feet in size. The data center features
eight data halls, 11 diesel backup generators, room for eight more pods.
1.66 miles Lumen Phoenix 1
1.69 miles Lumen Phoenix 2
1.77 miles Windstream Phoenix
Located in Phoenix, Arizona, this 4,400 square foot Phoenix data center is designed to serve the businesses in the Southwest. The facility was previously a PAETEC data center.
2.23 miles DataBank Phoenix PHX1
2.86 miles eBay Arizona
eBay's data center is also known as Project Mercury.
4.07 miles Stack: PHX02E
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
4.16 miles QTS: PHX2 DC2
PHX2 DC2 data center building will be a part of QTS' Phoenix Campus.
4.19 miles STACK Phoenix PHX02 Campus
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
4.19 miles Stack: PHX02D
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
4.19 miles Stack: PHX02B
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
4.26 miles PhoenixNAP: PHX02
PhoenixNAP will expand its Phoenix data center campus with a second building, PHX02, slated for construction in late 2025.
4.34 miles QTS: Phoenix II Campus
QTS Phoenix Data Center Campus (PHX II) sits on an 85-acre site with 5 data center buildings.
4.34 miles Stack: PHX02C
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
4.34 miles QTS: PHX2 DC3
PHX2 DC3 data center building is a part of QTS' Phoenix Campus.
4.35 miles QTS: PHX2 DC4
PHX2 DC4 data center building is a part of QTS' Phoenix Campus.
4.38 miles QTS: PHX2 DC5
PHX2 DC5 data center building is a part of QTS' Phoenix Campus. QTS broke ground on this data center in 2023.
4.39 miles PhoenixNAP-Phoenix
PhoenixNAP is a local provider which operates the data center campus, located east of downtown near Phoenix Sky Harbor International Airport.
4.73 miles Verizon: 3930 Watkins
This facility is a former XO Communications site. In 2017, Verizon completed the $1.8 billion acquisition of XO Communications' fiber-optic network business.
5.43 miles Iron Mountain: AZP2
In 2019, Iron Mountain completed the first phase of AZP-2 in Phoenix.
5.45 miles Centersquare: Phoenix PH1
5.51 miles Iron Mountain Phoenix
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio) 41-acre Iron Mountain Hyperscale-Ready campus 588,000 gross square feet 32 MW – redundant feeds
5.51 miles Internap Phoenix
5.55 miles DataBank PHX2
5.75 miles Iron Mountain: AZP3
Iron Mountain has commenced construction of the AZP-3 data center and aims to launch the first phase in Q4 2025.
7.06 miles EdgeConneX Phoenix
8.17 miles Five 9s: Blue Shield Phoenix
In 2021, Five 9s Digital acquired the 45,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield.
8.18 miles Expedient Phoenix
In 2021, Five 9s Digital acquired the 46,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield, and subsequently leased it to Expedient.
9.48 miles Hyperscale Data Center Request Dataset
Amazon Data Services has acquired land for a potential data center campus in Laveen, Phoenix. The 220-acre site, located near Loop 202 and Dobbins Road, was purchased for $277 million ($1.2 million per acre).
10.47 miles Liquid Web Phoenix
11.06 miles Menlo: MD-PX1 Bldg4
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
11.07 miles Aligned: Peoria Logistics Park
Aligned Data Centers firm acquired nearly 80 acres at the Peoria Logistics Park for $43.2 million in Peoria.
11.12 miles Menlo: MD-PX1 Bldg5
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
11.13 miles Menlo: MD-PX1 Bldg2
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
11.18 miles Menlo: MD-PX1 (Phoenix)
Menlo Digital's MD-PX1 (Phoenix) data center campus consists of five buildings on 38 acres. The campus will span 1,022,400 square feet.
11.18 miles Menlo: MD-PX1 Bldg3
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
12.37 miles 2055 E Technology - Digital Realty
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix. The building is SOC2 certified with 24/7 security and critical facilities management.
12.43 miles 2010 East Centennial
Digital Realty sold the office & data center building in 2018 to an unnamed company. We believe Fox Sports is the tenant.
12.46 miles Centersquare: PHX1
Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.
13.85 miles Prime: PHX01-05
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
13.92 miles Prime: PHX01-04
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
13.98 miles Prime: PHX01-03
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
14.05 miles Prime: PHX01-02
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
14.06 miles QTS: Hermosa Ranch
US data center firm QTS has acquired 206 acres in the West Valley for $246.8 million in an all-cash deal in July, 2024 from TGV Investments LLC.
14.11 miles Prime Phoenix
The Phoenix Campus is expected to be 1.3 million square feet across 5 data center buildings. The first data center is expected to be completed by Q3 2025 and total 260,400 square feet.
14.47 miles Aligned Phoenix
Aligned's PHX-01/02/03 data center campus in Union Hills, Phoenix, AZ, spans 550,000 sq ft with 180 MW of capacity.
14.47 miles Evocative: PHX1
14.95 miles Internap Phoenix 2500 W Frye Rd
American cloud and colocation provider Internap (INAP) has taken a master lease in a 150,000 square foot data center in Chandler, near Phoenix, Arizona.
14.98 miles Lincoln: Chandler, AZ
Real estate firm Lincoln Property Company reacquired its data center in Phoenix, Arizona, in 2025.
15.01 miles Aligned: PHX-08
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
15.04 miles Lincoln: Chandler Bldg-2
Lincoln Property's three-story, 243,000 sq ft expansion building is part of a future development plan that was approved by the City of Chandler under the previous owner.
15.08 miles Aligned: PHX-09
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
15.30 miles 11:11 Systems: Scottsdale
The 11:11 Systems Scottsdale data center, originally operated by Sungard Availability Services, was acquired by 11:11 Systems in November 2022.
15.49 miles 20435 N 26th
15.63 miles US Signal Phoenix AZ01
15.82 miles NexusTek Phoenix
NexusTek Acquired Phoenix-based CyberTrails in 2017.
16.00 miles 1900 S Price - Digital Realty
The Building is 1 story Flood Zone: Zone X Seismic Zone: Zone 1
16.13 miles Flexential Phoenix Deer Valley
Flexential's Phoenix site is former ViaWest. A and B source power circuit delivery capabilities Multiple medium voltage utility power feeds
16.17 miles H5 Phoenix
H5 acquired the site when it bought NextFort in January 2016H5 acquired the site when it bought NextFort in January 20
16.20 miles 2121 S Price - Digital Realty
In 2010, DRT acquired this site from 365 Main portfolio.
16.44 miles CyrusOne PHX9
16.49 miles Aligned: PHX-04
Aligned Energy's PHX04 site is located at the NEC of Price Road and Innovation Street. The data center spans 396,343 sqft.
16.50 miles CyrusOne PHX10
16.51 miles STACK Phoenix
Stack Infrastructure (Stack) is building a data center campus on a 100-acre site in Phoenix, Arizona.
16.54 miles CyrusOne PHX2
16.58 miles CyrusOne PHX3
16.63 miles CyrusOne Chandler Phoenix Campus
CyrusOne plans to build nearly 2 million square-feet data center campus. There are two buildings on the campus currently
16.65 miles CyrusOne PHX1
16.67 miles Aligned: PHX-06
PHX06 is a two-phase development that will total 456,946 SqFt
16.69 miles CyrusOne PHX5
16.73 miles Centersquare: Phoenix PH2
16.73 miles CyrusOne PHX4
16.75 miles Iron Mountain Scottsdale
Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power
16.75 miles LexisNexis Scottsdale
16.76 miles Stream Goodyear AZ
Phoenix I is the first of five 40MW buildings.
16.77 miles CyrusOne PHX6
16.78 miles Stream: PHX II
Stream Data Centers has topped out the second data center facility on its Goodyear Campus in August 2024.
16.79 miles DataCanopy: Phoenix, AZ
16.79 miles Stream: PHX III
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
16.79 miles CyrusOne PHX8
16.81 miles Stream: PHX IV
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
16.82 miles Stream: PHX V
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
16.84 miles Stream: PHX VI
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
16.87 miles CyrusOne PHX7
16.98 miles Hyperscale Data Center Request Dataset
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
17.09 miles Hyperscale Data Center Request Dataset
Known as PHX-83, the building will total 245,500 sq ft (22,808 sqm).
17.11 miles Hyperscale Data Center Request Dataset
17.12 miles Compass: El Mirage Bldg2
The facility is part of Compass El Mirage data center campus in Arizona.
17.13 miles Hyperscale Data Center Request Dataset
In April 2024, the El Mirage City Council approved a site plan amendment on the existing site in El Mirage Campus, allowing Microsoft to add another 245,000 sq ft (22,760 sqm), single-story data center.
17.14 miles Hyperscale Data Center Request Dataset
17.14 miles Hyperscale Data Center Request Dataset
17.16 miles Hyperscale Data Center Request Dataset
This Facility is a part of Microsoft's El mirage Campus in Arizona.
17.18 miles Compass: El Mirage, AZ
The company plans to develop three single-story buildings on this property, each spanning 208,000 square feet.
17.18 miles Hyperscale Data Center Request Dataset
In August 2018, Microsoft paid about $48 million for its 279-acre site near the Phoenix Goodyear Airport. The project already has three massive buildings, and Microsoft plans to construct two more buildings on the campus, for a total of five buildings.
17.18 miles Hyperscale Data Center Request Dataset
17.21 miles Hyperscale Data Center Request Dataset
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
17.21 miles Hyperscale Data Center Request Dataset
17.24 miles Hyperscale Data Center Request Dataset
The tech giant purchased two parcels of land for over $258 million in cash on May 2024. These properties, situated at the northwest and northeast corners of North Dysart Road and West Northern Parkway, were sold by DPML Copperwing LLC.
17.31 miles Vantage: AZ15
This planned facility is a part of Vantage's Phoenix Data Center Campus in Arizona.
17.34 miles Compass: El Mirage Bldg3
The facility is part of Compass El Mirage data center campus in Arizona.
17.38 miles Vantage AZ14
Located directly north of the AZ1 development, AZ14 features similar design and color elements to maintain visual continuity with its predecessor.
17.39 miles Vantage: AZ12
This facility is a part of Vantage's Phoenix Data Center Campus in Arizona.
17.44 miles Vantage: AZ13
In November 2024, Vantage Data Centers completed the topping out of the third data center building of its Phoenix Campus in Goodyear, Arizona.
17.44 miles Vantage Phoenix
In January 2019 Vantage announced it acquired 50 acres outside Phoenix in Goodyear, Arizona, to build a mega-scale data center campus. Construction began in early 2019, with the first phase coming online in 2022.
17.61 miles Compass Phoenix
Compass Datacenters is developing a hyperscale campus in Goodyear, a suburb of Phoenix, Arizona. The project began in January 2019 when Compass acquired a 200-acre land parcel in the area.
17.67 miles Compass: Phoenix I DC4
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC4 is one of the data center buildings of this campus.
17.67 miles Compass: Phoenix I DC5
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC5 is one of the data center buildings of this campus.
17.67 miles Compass: Phoenix I DC6
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC6 is one of the data center buildings of this campus.
17.70 miles Compass: Phoenix I DC2
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC2 is one of the data center buildings of this campus.
17.72 miles Compass: Phoenix I DC8
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC8 is one of the data center buildings of this campus.
17.79 miles Compass: Phoenix I DC3
Compass Datacenters is developing a hyperscale campus in Goodyear, a suburb of Phoenix, Arizona. The project began in January 2019 when Compass acquired a 200-acre land parcel in the area.
17.89 miles Compass: Phoenix I DC7
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC7 is one of the data center buildings of this campus.
19.08 miles Takanock: Project Baccara
Backed by DigitalBridge, the Project Baccara development is an ambitious 160-acre industrial project spearheaded by Takanock, located near the Luke Air Force Base.
19.17 miles Takanock: Baccara Bldg2
The facility is part of Takanock's Project Baccara in Arizona.
19.71 miles Aligned: PHX-07
Aligned Data Centers celebrated the topping-out ceremony for its PHX-07 campus in 2024. Construction of the facility began in 2023, and it is expected to become operational in 2025.
19.75 miles Aligned: PHX 07-2
PHX 07-2 is the second phase of Aligned's PHX07 campus in Phoenix. The two-story, 214,078-square-foot facility spans across six data halls.
19.82 miles DCX: Goodyear GYR1
19.95 miles Aligned: PHX 07-4
19.98 miles Aligned: PHX 07-3
This facility is part of Aligned's PHX07 campus in Phoenix.

120 E Van Buren - Digital Realty Data Center Photos (See all)

120 E Van Buren
Source: www.digitalrealty.com
120 E Van Buren Outside
Source: www.digitalrealty.com

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
280
Facilities
36
Markets
3227MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?