Aligned: PHX 07-2

Latest Podcast 8805 N Reems Rd
Under Construction
New facility under construction
Operated by:

Aligned: PHX 07-2

Short Code: Building 2
Year Planned: 2026
Floors: 2

PHX 07-2 is the second phase of Aligned's PHX07 campus in Phoenix. The two-story, 214,078-square-foot facility spans across six data halls. Each hall features prefabricated 2MW UPS modules, 3MW generators and rooftop 305-ton chillers.

Map and Nearby Locations

8805 N Reems Rd
Aligned Sites
Nearby Facilities

Aligned: PHX 07-2 Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Aligned: PHX 07-2

Distance Site About
0.08 miles Aligned: PHX-07
Aligned Data Centers celebrated the topping-out ceremony for its PHX-07 campus in 2024. Construction of the facility began in 2023, and it is expected to become operational in 2025.
0.25 miles Aligned: PHX 07-3
This facility is part of Aligned's PHX07 campus in Phoenix.
0.27 miles Aligned: PHX 07-4
0.90 miles Takanock: Project Baccara
Backed by DigitalBridge, the Project Baccara development is an ambitious 160-acre industrial project spearheaded by Takanock, located near the Luke Air Force Base.
0.96 miles Takanock: Baccara Bldg2
The facility is part of Takanock's Project Baccara in Arizona.
2.53 miles Prime CenterInterested in this information?Contact us
The tech giant purchased two parcels of land for over $258 million in cash on May 2024. These properties, situated at the northwest and northeast corners of North Dysart Road and West Northern Parkway, were sold by DPML Copperwing LLC.
2.55 miles PointInterested in this information?Contact us
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
2.77 miles UltraInterested in this information?Contact us
2.78 miles Hub MaxInterested in this information?Contact us
This Facility is a part of Microsoft's El mirage Campus in Arizona.
2.78 miles Tower OneInterested in this information?Contact us
In April 2024, the El Mirage City Council approved a site plan amendment on the existing site in El Mirage Campus, allowing Microsoft to add another 245,000 sq ft (22,760 sqm), single-story data center.
2.79 miles HubInterested in this information?Contact us
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
2.79 miles North PointInterested in this information?Contact us
Known as PHX-83, the building will total 245,500 sq ft (22,808 sqm).
3.27 miles Compass: El Mirage Bldg3
The facility is part of Compass El Mirage data center campus in Arizona.
3.48 miles Compass: El Mirage Bldg2
The facility is part of Compass El Mirage data center campus in Arizona.
3.48 miles Compass: El Mirage, AZ
The company plans to develop three single-story buildings on this property, each spanning 208,000 square feet.
3.75 miles Vantage: Glendale AZ3
In 2023, Vantage acquired nearly 34 acres from Phoenix-based industrial developer Merit Partners for $50 million, at approximately $1.5 million per acre.
4.13 miles QTS: Glendale Expansion
4.17 miles QTS Glendale AZ
QTS bought the property consisting of 375 acres in July 2022 for $255 million. A development timeline has yet to be announced.
5.69 miles East StationInterested in this information?Contact us
In a major expansion of its cloud infrastructure, Microsoft has acquired an additional 100 acres of land adjacent to its developing 150-acre data center campus in Goodyear, Arizona.
5.82 miles Station UltraInterested in this information?Contact us
Microsoft paid DRI FR Goodyear LLC $37 million for the 147 acre lot in Goodyear on April 15, 2019.
5.88 miles Hub GammaInterested in this information?Contact us
This facility is part of Microsoft's Goodyear Campus in Arizona.
5.96 miles ParkInterested in this information?Contact us
This facility is part of Microsoft's Goodyear Campus in Arizona.
6.11 miles Center UltraInterested in this information?Contact us
This facility is part of Microsoft's Goodyear Campus in Arizona.
6.18 miles Tower ThreeInterested in this information?Contact us
This facility is part of Microsoft's Goodyear Campus in Arizona.
8.06 miles Vantage: AZ13
In November 2024, Vantage Data Centers completed the topping out of the third data center building of its Phoenix Campus in Goodyear, Arizona.
8.06 miles Vantage AZ14
Located directly north of the AZ1 development, AZ14 features similar design and color elements to maintain visual continuity with its predecessor.
8.06 miles Vantage: AZ15
This planned facility is a part of Vantage's Phoenix Data Center Campus in Arizona.
8.16 miles Compass: Phoenix I DC6
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC6 is one of the data center buildings of this campus.
8.22 miles Vantage Phoenix
In January 2019 Vantage announced it acquired 50 acres outside Phoenix in Goodyear, Arizona, to build a mega-scale data center campus. Construction began in early 2019, with the first phase coming online in 2022.
8.23 miles Compass: Phoenix I DC7
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC7 is one of the data center buildings of this campus.
8.23 miles Vantage: AZ12
This facility is a part of Vantage's Phoenix Data Center Campus in Arizona.
8.25 miles Compass: Phoenix I DC5
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC5 is one of the data center buildings of this campus.
8.34 miles Compass: Phoenix I DC4
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC4 is one of the data center buildings of this campus.
8.67 miles Compass: Phoenix I DC3
Compass Datacenters is developing a hyperscale campus in Goodyear, a suburb of Phoenix, Arizona. The project began in January 2019 when Compass acquired a 200-acre land parcel in the area.
8.69 miles Compass: Phoenix I DC2
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC2 is one of the data center buildings of this campus.
8.69 miles Compass Phoenix
Compass Datacenters is developing a hyperscale campus in Goodyear, a suburb of Phoenix, Arizona. The project began in January 2019 when Compass acquired a 200-acre land parcel in the area.
8.90 miles Compass: Phoenix I DC8
Compass Datacenters is constructing a hyperscale campus in Goodyear, Arizona, a suburb of Phoenix. The DC8 is one of the data center buildings of this campus.
9.56 miles Aligned: Peoria Logistics Park
Aligned Data Centers firm acquired nearly 80 acres at the Peoria Logistics Park for $43.2 million in Peoria.
10.15 miles Stream: Goodyear AZ
Phoenix I is the first of five 40MW buildings.
10.29 miles Stream: PHX II
Stream Data Centers has topped out the second data center facility on its Goodyear Campus in August 2024.
10.33 miles STACK: Phoenix 01 Campus
Stack Infrastructure (Stack) is building a data center campus on a 100-acre site in Phoenix, Arizona.
10.40 miles Stream: PHX III
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
10.50 miles Stream: PHX IV
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
10.57 miles EastInterested in this information?Contact us
10.60 miles Stream: PHX V
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
10.68 miles Stream: PHX VI
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
10.68 miles Park UltraInterested in this information?Contact us
10.71 miles DCX: Goodyear GYR1
10.76 miles Stream: PHX VII
This facility is a part of Stream's Phoenix Data Center Campus in Goodyear, Arizona.
10.76 miles Park ProInterested in this information?Contact us
10.83 miles Campus OneInterested in this information?Contact us
10.92 miles TowerInterested in this information?Contact us
In August 2018, Microsoft paid about $48 million for its 279-acre site near the Phoenix Goodyear Airport. The project already has three massive buildings, and Microsoft plans to construct two more buildings on the campus, for a total of five buildings.
11.08 miles QTS: Hermosa Ranch
US data center firm QTS has acquired 206 acres in the West Valley for $246.8 million in an all-cash deal in July, 2024 from TGV Investments LLC.
11.43 miles Prime Phoenix
The Phoenix Campus is expected to be 1.3 million square feet across 5 data center buildings.
11.45 miles Prime: PHX01-02
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
11.48 miles Prime: PHX01-03
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
11.50 miles Prime: PHX01-04
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
11.52 miles Prime: PHX01-05
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
15.79 miles Five 9s: Blue Shield Phoenix
In 2021, Five 9s Digital acquired the 45,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield.
15.80 miles Expedient Phoenix
In 2021, Five 9s Digital acquired the 46,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield, and subsequently leased it to Expedient.
16.39 miles Aligned: PHX-08
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
16.40 miles Aligned: PHX-09
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
16.66 miles 5CDC: Phoenix PHX01
5C Data Centers is building a data center campus in Phoenix, Arizona. The first facility, PHX01, sits at 2802 W Palm Lane, a few miles west of downtown Phoenix, and is currently under construction.
17.16 miles Aligned Phoenix
Aligned's PHX-01/02/03 data center campus in Union Hills, Phoenix, AZ, spans 550,000 sq ft with 180 MW of capacity.
17.16 miles Evocative: PHX1
17.32 miles 20435 N 26th
17.58 miles Arizona Land: Buckeye, AZ
Arizona Land Consulting, the Valley's premier real estate consulting firm, finalized a $20 million acquisition in Buckeye, Arizona.
17.71 miles West CampusInterested in this information?Contact us
Amazon Data Services has acquired land for a potential data center campus in Laveen, Phoenix. The 220-acre site, located near Loop 202 and Dobbins Road, was purchased for $277 million ($1.2 million per acre).
18.26 miles NexusTek Phoenix
NexusTek Acquired Phoenix-based CyberTrails in 2017.
18.55 miles Flexential Phoenix Deer Valley
Flexential's Phoenix site is former ViaWest. A and B source power circuit delivery capabilities Multiple medium voltage utility power feeds
18.82 miles DataBank Phoenix PHX1
18.87 miles eBay Arizona
eBay's data center is also known as Project Mercury.
19.10 miles Lumen Phoenix 2
19.64 miles Metrobloks: Phoenix PHX-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the heart of downtown Phoenix, with live capacity scheduled for Q2 2027.
19.74 miles QTS Phoenix Van Buren
QTS acquired this site via the Carpathia acquisition in 2015.
19.75 miles LightEdge: Phoenix Van Buren
19.75 miles 120 E Van Buren - Digital Realty
120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix. The building is also home to many colocation operators including AIS, QTS, Sungard, XO

Aligned: PHX 07-2 Data Center Photos See all

Operating Company

Operated by:

Aligned Data Centers is an infrastructure technology company that offers colocation and build-to-scale solutions to cloud, enterprise, and managed service providers.

In early 2022, Aligned Energy was rebranded to Aligned Data Centers.

45
Facilities
14
Markets

News See all

Read Aligned Data Centers Sold in $40bn Deal
Aligned Data Centers Sold in $40bn Deal

Aligned Data Centers Sold in $40bn Deal

October 11, 2025 Aligned

Aligned Data Centers is being sold to BlackRock and MGX in a deal worth $40 billion, the biggest ever acquisition in the digital infrastructure space. Macquarie Asset Management selling it to a group comprising the AI Infrastructure Partnership (AIP), MGX, and BlackRock-owned Global...

Read more
Read Aligned to Develop 200-Acre Data Center Campus
 Aligned to Develop 200-Acre Data Center Campus

Aligned to Develop 200-Acre Data Center Campus

July 25, 2025 Aligned

Aligned Data Centers this week announced plans to expand in Central Ohio with the development of a data center campus inside the Conesville Industrial Park in Coshocton. Coshocton is located approximately 63 miles (101 km) northeast of Columbus.Aligned will develop a 197-acre parcel adjacent to...

Read more
Read Phoenix to clamp down on data centers
Phoenix to clamp down on data centers

Phoenix to clamp down on data centers

January 02, 2025 Phoenix

The city of Phoenix in Arizona is set to clamp down on data centers. The City Council has approved a series of changes to better regulate data center growth in the city, including regulating locations and external design specifications.The vote, which took place on December 10, targeted...

Read more
Read Aligned to proceed with stalled data center camps at Maryland
Aligned to proceed with stalled data center camps at Maryland

Aligned to proceed with stalled data center camps at Maryland

May 24, 2024 Aligned

Aligned Data Centers has revealed its plans to proceed with its previously halted data center campus in Maryland after recent regulatory changes. around backup generators, easing restrictions for data center firms. With this move, Aligned will now be moving ahead with its plans for a campus in...

Read more
Read Aligned Data Centres unveils new liquid cooling system
Aligned Data Centres unveils new liquid cooling system

Aligned Data Centres unveils new liquid cooling system

January 16, 2024 Aligned

Data center firm Aligned recently unveiled a new liquid cooling system designed to support high-density compute requirements and supercomputers and can cool densities up to 300kW per rack. This cooling system, called DataFlow is said to be a turnkey solution which supports current and future...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?