Flexential Phoenix Deer Valley

Latest Podcast
1850 W Deer Valley Rd Phoenix
Operational
Fully operational facility
Operated by:

Flexential Phoenix Deer Valley

Year Built: 2014
PUE: 1.6
░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Flexential's Phoenix site is former ViaWest. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017. The rebranding from ViaWest to Flexential was announced in January 2018. ViaWest launched It's first Phoenix data center in 2014.

Power:


  • A and B source power circuit delivery capabilities
  • Multiple medium voltage utility power feeds
  • 10 megawatt diesel power generation capacity
  • Automatic power switching
  • 2(N+1) 5,400 kW UPS
  • Redundant high-reliability wet cell battery strings
  • Multiple redundant power distribution paths
  • Branch Circuit Monitoring Systems
  • Multiple diesel fuel providers

HVAC:


  • 2,100 tons of redundant cooling capacity
  • Anti-static raised flooring with designated cable runs and cooled air delivery
  • Hot aisle/cold aisle configuration
  • Fully cabled for typical customer applications
  • Waterside economizers allow for free environmental cooling
  • 500,000 gallon on-site chilled water storage for continuous cooling

Compliance:


  • SSAE 16 and ISAE 3402 Service Organization Control (SOC) 1 Type II
  • SOC 2 Type II and SOC 3 reports
  • PCI DSS
  • HIPAA
  • NIST 800-53
  • ITAR
  • US-EU Safe Harbor Privacy framework

Map and Nearby Locations:

1850 W Deer Valley Rd Phoenix
Flexential Sites
Nearby Facilities

Sites within 15 miles of Flexential Phoenix Deer Valley

Distance Site About
0.36 miles NexusTek Phoenix
NexusTek Acquired Phoenix-based CyberTrails in 2017.
1.26 miles 20435 N 26th
1.90 miles Evocative: PHX1
1.90 miles Aligned Phoenix
Aligned's PHX-01/02/03 data center campus in Union Hills, Phoenix, AZ, spans 550,000 sq ft with 180 MW of capacity.
2.20 miles Aligned: PHX-09
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
2.22 miles Aligned: PHX-08
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
8.26 miles Expedient Phoenix
In 2021, Five 9s Digital acquired the 46,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield, and subsequently leased it to Expedient.
8.27 miles Five 9s: Blue Shield Phoenix
In 2021, Five 9s Digital acquired the 45,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield.
10.93 miles 11:11 Systems: Scottsdale
The 11:11 Systems Scottsdale data center, originally operated by Sungard Availability Services, was acquired by 11:11 Systems in November 2022.
11.56 miles Aligned: Peoria Logistics Park
Aligned Data Centers firm acquired nearly 80 acres at the Peoria Logistics Park for $43.2 million in Peoria.
11.94 miles Iron Mountain Scottsdale
Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power
11.95 miles Centersquare: Phoenix PH2
11.96 miles LexisNexis Scottsdale
13.29 miles eBay Arizona
eBay's data center is also known as Project Mercury.
13.89 miles DataBank Phoenix PHX1
14.05 miles Liquid Web Phoenix
14.44 miles Lumen Phoenix 2
15.14 miles Compass: El Mirage, AZ
The company plans to develop three single-story buildings on this property, each spanning 208,000 square feet.
15.17 miles Compass: El Mirage Bldg2
The facility is part of Compass El Mirage data center campus in Arizona.
15.35 miles Compass: El Mirage Bldg3
The facility is part of Compass El Mirage data center campus in Arizona.
16.12 miles QTS Phoenix Van Buren
QTS acquired this site via the Carpathia acquisition in 2015.
16.13 miles 5CDC: Phoenix PHX01
5C Data Centers is building a data center campus in Arizona. The first facility at the site, PHX01, is scheduled to go live in 2025.
16.13 miles LightEdge: Phoenix Van Buren
16.13 miles 120 E Van Buren - Digital Realty
120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix. The building is also home to many colocation operators including AIS, QTS, Sungard, XO
16.15 miles Hyperscale Data Center Request Dataset
16.21 miles Hyperscale Data Center Request Dataset
This Facility is a part of Microsoft's El mirage Campus in Arizona.
16.23 miles QTS: PHX2 DC5
PHX2 DC5 data center building is a part of QTS' Phoenix Campus. QTS broke ground on this data center in 2023.
16.25 miles Hyperscale Data Center Request Dataset
In April 2024, the El Mirage City Council approved a site plan amendment on the existing site in El Mirage Campus, allowing Microsoft to add another 245,000 sq ft (22,760 sqm), single-story data center.
16.29 miles Hyperscale Data Center Request Dataset
Known as PHX-83, the building will total 245,500 sq ft (22,808 sqm).
16.30 miles QTS: PHX2 DC4
PHX2 DC4 data center building is a part of QTS' Phoenix Campus.
16.40 miles QTS: PHX2 DC3
PHX2 DC3 data center building is a part of QTS' Phoenix Campus.
16.43 miles QTS: PHX2 DC2
PHX2 DC2 data center building will be a part of QTS' Phoenix Campus.
16.49 miles QTS: Phoenix II Campus
QTS Phoenix Data Center Campus (PHX II) sits on an 85-acre site with 5 data center buildings.
16.58 miles Stack: PHX02E
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
16.60 miles Hyperscale Data Center Request Dataset
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
16.63 miles Stack: PHX02D
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
16.68 miles Stack: PHX02C
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
16.72 miles Stack: PHX02B
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
16.79 miles STACK Phoenix PHX02 Campus
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
16.80 miles Hyperscale Data Center Request Dataset
The tech giant purchased two parcels of land for over $258 million in cash on May 2024. These properties, situated at the northwest and northeast corners of North Dysart Road and West Northern Parkway, were sold by DPML Copperwing LLC.
16.82 miles Metrobloks: Phoenix PHX-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the heart of downtown Phoenix, with live capacity scheduled for Q2 2027.
16.85 miles Hyperscale Data Center Request Dataset
The facility is part of Microsoft's campus located at the northwest and northeast corners of Dysart Road and Northern Parkway in El Mirage.
17.04 miles Windstream Phoenix
Located in Phoenix, Arizona, this 4,400 square foot Phoenix data center is designed to serve the businesses in the Southwest. The facility was previously a PAETEC data center.
17.09 miles Lumen Phoenix 1
17.23 miles GoDaddy: Gilbert, AZ
GoDaddy’s own data center in Phoenix is more than 270,000 square feet in size. The data center features
eight data halls, 11 diesel backup generators, room for eight more pods.
17.27 miles Iron Mountain: AZP3
Iron Mountain has commenced construction of the AZP-3 data center and aims to launch the first phase in Q4 2025.
17.33 miles Centersquare: Phoenix PH1
17.36 miles Internap Phoenix
17.36 miles Iron Mountain Phoenix
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio) 41-acre Iron Mountain Hyperscale-Ready campus 588,000 gross square feet 32 MW – redundant feeds
17.37 miles DataBank PHX2
17.48 miles Iron Mountain: AZP2
In 2019, Iron Mountain completed the first phase of AZP-2 in Phoenix.
17.60 miles Takanock: Baccara Bldg2
The facility is part of Takanock's Project Baccara in Arizona.
17.67 miles Takanock: Project Baccara
Backed by DigitalBridge, the Project Baccara development is an ambitious 160-acre industrial project spearheaded by Takanock, located near the Luke Air Force Base.
18.55 miles Aligned: PHX 07-2
PHX 07-2 is the second phase of Aligned's PHX07 campus in Phoenix. The two-story, 214,078-square-foot facility spans across six data halls.
18.59 miles Aligned: PHX-07
Aligned Data Centers celebrated the topping-out ceremony for its PHX-07 campus in 2024. Construction of the facility began in 2023, and it is expected to become operational in 2025.
18.77 miles Aligned: PHX 07-3
This facility is part of Aligned's PHX07 campus in Phoenix.
18.82 miles Aligned: PHX 07-4
18.87 miles Verizon: 3930 Watkins
This facility is a former XO Communications site. In 2017, Verizon completed the $1.8 billion acquisition of XO Communications' fiber-optic network business.
19.22 miles PhoenixNAP: PHX02
PhoenixNAP will expand its Phoenix data center campus with a second building, PHX02, slated for construction in late 2025.
19.23 miles PhoenixNAP-Phoenix
PhoenixNAP is a local provider which operates the data center campus, located east of downtown near Phoenix Sky Harbor International Airport.

Flexential Phoenix Deer Valley Data Center Photos (See all)

Map of Flexential's Network and Data Center Locations
Source: Flexential

Operating Company

Operated by:

Flexential is a U.S. data center operator formed when Peak 10 acquired ViaWest in August 2017 for $1.67 billion. The company subsequently rebranded in January 2018 as a single company.

The company provides colocation, interconnection, cloud, and managed services. The company is backed by private equity firm GI Partners, which agreed to acquire Peak 10 in 2014. ViaWest was founded in 1999 in Denver and Peak 10 in 2000 in Charlotte, with each building regional data center portfolios before combining in 2017.

Flexential History:

  • In January 2018, Rebranded from Peak 10 + ViaWest to Flexential.
  • In August 2017, Peak 10 completed the acquisition of ViaWest from Shaw Communications for approximately US$1.675 billion.
  • In November 2015, ViaWest agreed to acquire INetU for US$162.5 million.
  • In June 2015, ViaWest agreed to acquire AppliedTrust.
  • In March 2000, Peak 10 was founded in Charlotte, North Carolina.
  • In April 1999, ViaWest was founded in Denver as a roll-up of ISPs
45
Facilities
16
Markets
326MW
Megawatts

News (See all)

Read More News