Edge Centres: Los Angeles EC101

Latest Podcast 530 W 6th Street
Operational
Fully operational facility
Operated by:

Edge Centres: Los Angeles EC101

Ownership: Edge Centres does not own the building.
This site is leased from Morlin Management in the Telecom Center LA Building (530 West 6th) building
░░░ Request Dataset MW
Total Power

This site was previously known as QuadraNet DTLA before being acquired by Edge Centres in 2024.

Map and Nearby Locations

530 W 6th Street
Edge Centres Sites
Nearby Facilities

Sites within 15 miles of Edge Centres: Los Angeles EC101

Distance Site About
0.04 miles Telecom Center LA Building (530 West 6th)
0.04 miles Cogent: 530 West 6th
0.04 miles United Layer-LA4
0.04 miles Colocation America (LA4)
0.04 miles HostPapa LA1
0.04 miles Sprocket Los Angeles
0.05 miles DataBank LAX1
0.07 miles Crown Castle LA
0.07 miles CoreSite Los Angeles (LA1) One Wilshire
CoreSite's Any2 IXP (Peering Exchange) is the largest public IXP in the Western United States. The Unity Trans-Pacific submarine cable, also lands in the building, which provides undersea connectivity to Asia.
0.07 miles One Wilshire Building
One Wilshire is an iconic building in downtown Los Angeles. The 30 story building is easy to spot on the LA skyline with a giant "One Wilshire" sign at the top of the building.
0.07 miles US Colo (One Wilshire)
0.10 miles US Colo (Quinby)
0.12 miles Subrigo LAX11 (Quinby)
Subrigo operating colocation facility in the Quinby Building, downtown LA carrier corridor one block from One Wilshire. 2 MW critical sellable on ~45-day RFS; 30-50 kW/rack standard, 150 kW/rack liquid-cooled achievable.
0.13 miles Telehouse 626 Wilshire
0.16 miles Evocative: Los Angeles, LAX2
Evocative's LAX2 data center facility, located at 600 W 7th St, Los Angeles, was constructed in 1999. Spanning an impressive 30000
square feet building.
0.16 miles Aon Center
Known as the Aon Center and owned by Shorenstein Properties, the 62-story office skyscraper hosts a number of colocation companies that offer raised floor in the building.
0.17 miles Aptum Los Angeles
0.17 miles Verizon: (600 West 7th)
0.17 miles AT&T Los Angeles 2
0.17 miles 600 W 7th St, Los Angeles - Digital Realty
The 7-story building at 600 West 7th is one of the best-connected buildings in Los Angeles (second to One Wilshire.) Digital Realty operates the building's Meet Me Room and offers connections into Equinix LA1 space.
0.17 miles China Telecom Los Angeles
0.18 miles Equinix Los Angeles LA1
0.18 miles AT&T Switching Center Los Angeles
0.28 miles Verizon: (818 West 7th)
0.28 miles 818 West 7th
0.28 miles Equinix Los Angeles LA2
0.28 miles Lumen Los Angeles 1
0.29 miles NYI Los Angeles
0.29 miles US Colo (800 Hope)
0.29 miles 800 South Hope
0.70 miles West 7 Center (1200 West 7th)
0.70 miles Equinix Los Angeles LA5
1.30 miles Fiberhub LAX1
1.30 miles CoreSite Los Angeles (LA2) 900 N Alameda
CoreSite's LA2 facility at 900 N Alameda is an elegant building that was built in 1940 as a Postal Annex. It was the central mail processing facility for Los Angeles until 1989. The site is now owned by CoreSite and is being incrementally converted to data center space.
1.30 miles Tata Los Angeles
1.30 miles ARP Networks
1.34 miles CoreSite LA3
3.46 miles Digital Realty: Vernon, CA
US data center operator Digital Realty acquired a 5.4-acre property in the Vernon area of Los Angeles, California, for approximately $49 million in 2025.
3.52 miles Prime Vernon
Prime Data Centers' three-story, 261,000-square-foot data center is located in Vernon, California.
3.63 miles DataBank: Los Angeles
DataBank and Goodman Group’s LAX2 project is a 32MW AI-ready data center in Vernon, California, developed through a 50/50 joint venture at 3094 E. Vernon Avenue, with 140,417 raised square feet and phased delivery beginning with 6MW in December 2026 and the balance through September 2027.
3.63 miles Goodman: Los Angeles
The 5.6-acre facility, situated on the former Farmer John site, is slated to be power shell-ready by mid-2026.
8.07 miles DigiCo: Los Angeles LAX1
Following a highly tumultuous approval process, Australian investment firm HMC Capital has officially withdrawn its application to build the 250,000-square-foot "1977 Saturn Data Center" in Monterey Park, California.
8.08 miles DigiCo: Los Angeles LAX2
DigiCo’s LAX2 data center in Monterey Park, 16 km east of downtown Los Angeles, is a Tier III-ready hyperscale facility now moving through power-allocation and permitting ahead of a 2027-2028 commercial launch.
9.36 miles Centersquare: Hawthorne LAX4
Centersquare’s Hawthorne facility is a massive data center with more than 288,000 Total square feet, located less than 6 miles from Los Angeles International Airport (LAX), with easy access from downtown Los Angeles.
9.37 miles 2301 West 120th, Hawthorne
10.65 miles Alchemy LAX
10.65 miles QuadraNet LAX (Century)
10.74 miles GI Partners: Culver Blvd, CA
11.48 miles Equinix El Segundo LA4
11.54 miles Serverfarm LAX1
The site is served by a 16.5 MW substation on-site.
11.62 miles Equinix El Segundo LA3
11.65 miles Centersquare: Burbank BR1
2 Story Structure Utility: Burbank Water and Power
11.65 miles 3015 Winona - Digital Realty
11.76 miles 200 North Nash - Digital Realty
200 Nash is fully leased to Cyxtera, a Triple Net tenant
11.76 miles Centersquare: El Segundo LA1
11.77 miles 2260 E El Segundo - Digital Realty
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million
11.81 miles Evocative: Los Angeles, LAX10
Evocative's LAX10 data center facility is located at 2260 E El Segundo Blvd, El Segundo, CA. Spanning an impressive 1 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
12.61 miles Cogent Pasadena
12.82 miles Evocative Redondo LAX14
INAP's flagship location in Los Angeles Datacenter was constructed in 2012 Electric Utility Provider: Southern California Edison
13.94 miles Equinix Los Angeles LA7
17.49 miles Cogent: 16680 Valley View

Edge Centres: Los Angeles EC101 Data Center Photos See all

Operating Company

Operated by:
21
Facilities
11
Markets
10MW
Megawatts

News See all

Read Second Building at Edged’s Chicago Data Center Campus Topped Out
Edged Energy has topped out its latest facility at its Chicago, Illinois campus. The company said it has completed structural work on its second building at the site at 2835 Bilter Road in Aurora. ...

Second Building at Edged’s Chicago Data Center Campus Topped Out

June 05, 2026 Edge Centres

Edged Energy has topped out its latest facility at its Chicago, Illinois campus. The company said it has completed structural work on its second building at the site at 2835 Bilter Road in Aurora. The ORD01-2 data center is fully pre-leased, will deliver 72MW of capacity, and is scheduled to go...

Read more
Read Armada Raises $230M ln Latest Funding Round
Armada Raises $230M ln Latest Funding Round

Armada Raises $230M ln Latest Funding Round

May 20, 2026 Edge Centres

Armada has raised $230 million in an oversubscribed Series B round, its largest funding to date, bringing total capital to nearly $500 million. The round was co-led by Overmatch, BlackRock, and 8090 Industries, with participation from investors including Johnson Controls, NightDragon, Mitsui, and...

Read more
Read NextDC Begins Construction on 4.4MW Edge Facility in Geelong
NextDC Begins Construction on 4.4MW Edge Facility in Geelong

NextDC Begins Construction on 4.4MW Edge Facility in Geelong

April 22, 2026 Edge Centres

Australian data center firm NextDC has broken ground on a new Edge facility near Melbourne. “It's begun! Work on NextDC's GE1 4.4MW data center in Geelong has commenceIn thid, bringing new capability to the region,” Adam Gardner, head of Edge at NextDC, said on Linkedin this week.The 4.4MW...

Read more
Read Armada Secures 11MW Data Center Deployment with WinDC in Australia
Armada Secures 11MW Data Center Deployment with WinDC in Australia

Armada Secures 11MW Data Center Deployment with WinDC in Australia

March 16, 2026 Edge Centres

Australian data center company WinDC is partnering with US edge data center firm Armada to deploy containerized compute across the country. This week, the two companies announced a partnership to roll out a network of portable, renewable-powered “AI factories” across Australia.WinDC aims to place...

Read more
Read Edged Data Centers launches new facility in Atlanta
Edged Data Centers launches new facility in Atlanta

Edged Data Centers launches new facility in Atlanta

August 25, 2024 Edge Centres

Data center provider Edged Energy has launched its first North American data center in Atlanta, Georgia. The campus will feature three data centers, the first of the three which is now live, delivering 27MW of capacity. At full build-out, the campus will offer 168MW of IT capacity. Brandon Beach,...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?