Digital Realty: Cyberjaya Expansion

Latest Podcast Jalan Teknokrat 6, Cyber 5 (parcel adjacent to KUL10)
Planned
Future facility in planning stage
Operated by:

Digital Realty: Cyberjaya Expansion

Year Planned: 2028
Lot Size: 2 acres

Digital Realty plans a third data center on a 1.6-acre parcel about 200 m from KUL10 in Cyber 5, Cyberjaya, acquired alongside CSF Advisers in 2026. The building is to be built to Digital Realty's global standards for hybrid colocation and AI-ready deployments, with completion targeted for mid-2028, and will connect to KUL10 and KUL11 by dedicated fiber. Digital Realty has not yet published a facility code for it.

Map and Nearby Locations

Jalan Teknokrat 6, Cyber 5 (parcel adjacent to KUL10)
Digital Realty Trust Sites
Nearby Facilities

Digital Realty: Cyberjaya Expansion Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Digital Realty: Cyberjaya Expansion

Distance Site About
0.10 miles Digital Realty: KUL10
KUL10, formerly CSF's Computer Exchange 1 and TelcoHub 1 at 3552 Jalan Teknokrat 6, Cyberjaya, is the carrier hotel of Digital Realty's Cyberjaya campus and hosts the Malaysia Internet Exchange.
0.10 miles TelcoHub X1 Cyberjaya
0.28 miles Digital Realty: KUL11
Digital Realty's KUL11 is a purpose-built data center on Jalan Teknokrat 8 in Cyber 5, Cyberjaya, about 500 m from KUL10. Infinaxis developed it with CSCEC as contractor and Digital Realty acquired it in 2026 as the AI and HPC building of its Cyberjaya campus.
0.32 miles Infinaxis: Cyberjaya 2
Infinaxis planned Cyberjaya 2 as a second building beside Cyberjaya 1 on Jalan Teknokrat 8. Infinaxis sold the first building to Digital Realty in 2026 (now KUL11) and no second-phase plan has surfaced since, so the project is in doubt.
0.44 miles Bridge Data Centres Cyberjaya MY01
0.48 miles CSF Computer Exchange 2 (CX2)
The 300,000+ square foot CX2 data center in Kuala Lumpur, Malaysia is the flagship facility for the CSF Group, which went public in 2010 with an IPO in London.
0.48 miles Keppel Cyberjaya Basis Bay DC
0.52 miles CSF Computer Exchange 5 (CX5)
Developed in three phases over three years, CX5 was completed in 2015.
0.53 miles Bridge Data Centres Cyberjaya MY02
0.57 miles Basis Bay: Cyberjaya DC1
Operational since 2009, Basis Bay DC.1 is a purpose-built, carrier-neutral facility designed to Tier III/Rated-3 standards (with Tier IV-ready mechanical and electrical redundancies).
0.59 miles Edgnex: Cyberjaya
The company will invest RM250 million ($52.4 million) to develop the facility on a 1.21-hectare plot of land.
0.59 miles GDC SDN: Cyberjaya
Global Data Centre Sdn. Bhd. (GDC), a subsidiary of Global Telecommunications Sdn. Bhd., is planning to build an AI-Driven Data Centre in Cyberjaya, Malaysia.
0.63 miles STT Kuala Lumpur 1
STT Kuala Lumpur 1, is specifically designed for hyperscalers and is currently in the final stages of completion to meet the growing demand for global cloud and AI infrastructure.
0.65 miles Metro CenterInterested in this information?Contact us
AWS is building its first Malaysian data center facility at Persiaran APEC, Cyberjaya, in Selangor. The first project will be built out in multiple phases and will be overseen by the Sepang Municipal council.
0.65 miles Basis Bay: Cyberjaya DC2
Basis Bay Cyberjaya DC.2 is a pioneering "Eco-Green Premium Data Centre" designed to meet the rigorous demands of the banking, financial services, and government sectors.
0.68 miles Open DC CJ1
0.68 miles MyTelehaus Cyberjaya CJ1 Centre
0.69 miles Vantage: KUL13
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
0.70 miles Bridge: MY02 Bldg4
0.71 miles Bridge: MY02 Bldg3
0.71 miles Vantage: KUL14
This facility is a part of Vantage's Cyberjaya CJ1 Campus in Kuala Lumpur.
0.71 miles Vantage Cyberjaya KUL11
Vantage's multi-story, four-data-center KUL1 campus is an 8-minute drive from the Central Business District via the Persiaran APEC and a 30-minute drive from Kuala Lumpur International Airport.
0.71 miles Bridge: MY02 Bldg2
Bridge Data Centres (BDC) is expanding its footprint in Cyberjaya, Malaysia with the MY02 hyperscale data center project, adding substantial IT capacity across three phases.
0.73 miles Equinix Kuala Lumpur KL1
Equinix KL1 is located within Vantage KUL1 Data Center Campus.
0.75 miles Vantage: KUL12
In 2022, Vantage launched the second data center (KUL12) on its Cyberjaya CJ1 campus in Kuala Lumpur, Malaysia.
0.79 miles Vantage: KUL21
KUL21 is the first data center on Vantage's KUL2 campus in Cyberjaya.
0.82 miles Pi Data Centre: Cyberjaya
The development will span 7.3 acres, with Phase 1 construction scheduled to begin in the third quarter of 2024. The project is expected to be completed by the fourth quarter of 2025.
0.85 miles Vantage: KUL2 Expansion
The remaining data centers planned on Vantage's KUL2 campus in Cyberjaya after KUL21.
0.91 miles Equinix: KL2
The site is strategically located less than one kilometer from Equinix's KL1 data center, which began operations in May 2024.
0.92 miles NTT Cyberjaya 5
Cyberjaya 5 Data Center is located in the Multimedia Super Corridor, just a 30-minute drive from central Kuala Lumpur, in Malaysia's premier IT hub.
0.97 miles NTT Cyberjaya 4
In 2014, NTT added CBJ4 phase which has two buildings. The Global Solution Center and the CBJ4 DC.
0.97 miles NTT Cyberjaya 6
1.00 miles NTT Cyberjaya 3
In 2012 NTT added CBJ3 which consists of two buildings, a Technology Center and the CBJ3 Data Center.
1.04 miles NTT Cyberjaya 2
NTT's Cyberjaya 2 (CBJ2) appears to have closed.
1.06 miles NTT Cyberjaya 1
1.07 miles Hyperscale Data CenterInterested in this information?Contact us
1.11 miles EdgeConneX: Cyberjaya
The EdgeConneX data center campus in Cyberjaya (KUL3) will encompass nine buildings across 30 acres.
1.18 miles Hyperscale Data CenterInterested in this information?Contact us
Microsoft’s KUL03 T2 is an under-construction expansion of its Cyberjaya data center campus, forming part of the wider KUL03 T2–T5 development.
1.35 miles Telekom Malaysia: KVDC 1
Telekom Malaysia is expanding two of its data centers. Cyberjaya Klang Valley Core Data Centre (KVDC) was opened in 2019.
1.38 miles AIMS: Cyberjaya 2
DigitalBridge-owned AIMS has finalized a RM4 billion ($1.01 billion) investment to develop a new AI-ready data center in Cyberjaya, Malaysia.
1.39 miles Telekom Malaysia: KVDC 2
Telekom Malaysia has expanded its Cyberjaya Klang Valley Data Center (KVDC).
1.70 miles AIMS: CJ1 Block 3
Malaysia’s AIM completed construction of Cyberjaya Block 3 in July 2025, ahead of schedule.
1.73 miles AIMS: CJ1 Block 2
In 2024, Malaysia’s AIMS completed a phase 2 expansion of its Cyberjaya campus and announced plans for a third phase expansion.
1.75 miles AIMS Cyberjaya CJ1
AIMS Data Centre began constructing its Cyberjaya facility in the third quarter of 2020.
2.49 miles SIC Quantum Data Center
Selangor Industrial Corporation (SIC) has partnered with domestic operator Data Centre Union (DC Union) in a joint venture named SIC Quantum Data Centre Sdn Bhd (SQDC) to build a RM 2.5 billion ($604M) data center campus.
6.66 miles Bridge DC: Southville City 2
Bridge Data Centres and Malaysian developer Mah Sing Group Berhad are expanding their data center joint venture outside Kuala Lumpur.
6.86 miles Bridge DC: Southville City 1
The initial phase will focus on developing a data center site on 17.55 acres.
6.98 miles Bridge DC: Banting Campus
Bridge Data Centres (BDC), backed by Bain Capital, has acquired 136.1 acres in Banting’s IOI Industrial Park for RM740.68 million (~$158M).
9.07 miles GDC SDN: Banting Campus
Malaysia’s Global Telecommunications Group has acquired a 36-acre parcel in Kota Seri Langat, Selangor, through its data center arm Global Data Infrastructure Sdn Bhd.
9.39 miles EdgeConneX: Bukit Jalil
EdgeConnex is building a 60,000 sqm data center in Bukit Jalil, Malaysia. The site will feature a 132 kV substation.
9.53 miles Bridge: MY03 DC2
Phase One of the expansion was planned to be ready for service by Q3 2025.
9.54 miles Bridge Data Centres MY03
Bridge DC announced plans for the first building at the MY03 Campus in 2021.
9.57 miles Bridge: MY03 DC3
In 2023, the ChinData-owned company announced plans for an expansion at its MY03 campus within the 686-acre 4-IR Mranti Park.
9.60 miles Bridge: MY03 DC4
In 2023, the ChinData-owned company announced plans for an expansion at its MY03 campus within the 686-acre 4-IR Mranti Park.
10.25 miles Exsim: Bukit Jalil
The EXSIM Hyperscale Data Center Project in Bukit Jalil, Malaysia, complies with Uptime Institute's Tier III/Tier IV standards.
10.31 miles ModernOne Kajang
12.73 miles NEXTDC: KL1 Petaling Jaya
Located in Petaling Jaya, KL1 Kuala Lumpur is NEXTDC's first international data centre, marking the company's expansion into Southeast Asia and strengthening Malaysia's position as a regional hub for AI, cloud and digital innovation.
12.92 miles EC31 Kuala Lumpur
13.32 miles Basis Bay: Glenmarie DC1
Basis Bay's Glenmarie DC.1 (also referred to as Subang Hi-Tech DC.1) is one of the company's established, purpose-built facilities located in Shah Alam, Malaysia.
13.42 miles Basis Bay: Glenmarie DC2
13.74 miles Hexatoff: Enstek City
The Hexatoff Group AI Data Center in Enstek City is a flagship digital infrastructure project designed to position Malaysia as a regional leader in high-performance computing.
13.89 miles MyTelehaus Kuala Lumpur P33 Centre
13.97 miles TM KELANA JAYA DATA CENTRE (KJDC)
14.10 miles Strateq: Petaling Jaya
14.65 miles Regal Orion: Shinsei 1
The facility is designed as a Tier IV green mega data center with capacity for 4,064 racks.
15.67 miles Exitra: Kuala Lumpur
15.69 miles TM Brickfields Data Centre (BFDC)
15.87 miles i-Berhad: i-City Bldg-1
Located in the heart of Shah Alam, i-Berhad’s Building 1 (also known as Block M) serves as the foundation for the i-City Data Centre Park.
15.88 miles Strateq: Shah Alam I-City
15.95 miles i-Berhad: i-City Bldg-3
Leading Malaysian property developer I-Bhd is significantly scaling its digital infrastructure by expanding the i-City Golden Triangle data center park in Shah Alam, Selangor.
15.97 miles i-Berhad: i-City Bldg-2
Leading Malaysian property developer I-Bhd is significantly scaling its digital infrastructure by expanding the i-City Golden Triangle data center park in Shah Alam, Selangor.
16.69 miles AIMS: KL2
AIMS Group, owned by DigitalBridge, expanded its Malaysian footprint in 2024 with the launch of Bangunan AIMS (also known as KL2) in Kuala Lumpur.
16.70 miles HPC Data CenterInterested in this information?Contact us
16.70 miles HPC Data CenterInterested in this information?Contact us
This facility is part of HPC Operator's Kuala Lumpur campus in Malaysia.
16.70 miles HPC Data CenterInterested in this information?Contact us
This facility is part of HPC Operator's Kuala Lumpur campus in Malaysia.
16.71 miles AIMS Kuala Lumpur Menara
17.35 miles EdgeConneX: CBD Kuala Lumpur
EdgeConnex is building a 19,200 sqm data center with in the Central Business District in Malaysia.
17.46 miles Safehouse: Wisma Mont’ Kiara
Launched in 2011, the 5,000 sq ft facility utilizes IBM's Scalable Modular Data Centre Solutions (SMDC) and incorporates technology from Schneider Electric and Juniper Networks.
18.41 miles TM Morib CLS
Located in Morib, Selangor, Telekom Malaysia’s new 7,000 sq ft open cable landing station (CLS) serves as a strategic gateway along the Straits of Malacca.
18.82 miles YTL: Sentul 1
YTL’s Sentul Data Center 1 is located in the heart of Kuala Lumpur.

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read Digital Realty Appoints New Global Head Of Energy
US colocation data center firm Digital Realty has appointed Jim Collins as senior vice president and global head of energy. Collins joins from Microsoft, where he spent 13 years in various leadersh...

Digital Realty Appoints New Global Head Of Energy

September 26, 2026 Digital Realty Trust

US colocation data center firm Digital Realty has appointed Jim Collins as senior vice president and global head of energy. Collins joins from Microsoft, where he spent 13 years in various leadership roles, most recently as general manager of global energy markets. Before Microsoft, he spent a...

Read more
Read Digital Realty Launches 6.4MW Data Center In Nairobi, Kenya
Digital Realty has launched its second data center in Nairobi, Kenya. The company announced on September 7 that its Nairobi Two Data Center (NBO2) is now operational, adding 6.4MW of capacity to it...

Digital Realty Launches 6.4MW Data Center In Nairobi, Kenya

September 08, 2026 Digital Realty Trust

Digital Realty has launched its second data center in Nairobi, Kenya. The company announced on September 7 that its Nairobi Two Data Center (NBO2) is now operational, adding 6.4MW of capacity to its Nairobi campus. The facility covers 12,000 sq ft (1,100 sqm). The launch follows iColo’s...

Read more
Read Digital Realty Buys Blackstone Stake in Three Virginia Data Centers for $3.5 Billion
Digital Realty is acquiring a stake in three Northern Virginia data centers from Blackstone. The deal covers 288MW of fully leased capacity across two sites in Manassas and one at the Digital Dulle...

Digital Realty Buys Blackstone Stake in Three Virginia Data Centers for $3.5 Billion

July 01, 2026 Digital Realty Trust

Digital Realty is acquiring a stake in three Northern Virginia data centers from Blackstone. The deal covers 288MW of fully leased capacity across two sites in Manassas and one at the Digital Dulles campus in Sterling, all 100% leased to hyperscale customers. Blackstone is selling a 64% interest...

Read more
Read Digital Realty Plans New Data Center in Seattle, Washington
Digital Realty is planning a new data center in Seattle, Washington, as the city considers a moratorium on new developments. According to BizJournal and other reports, the company has filed plans w...

Digital Realty Plans New Data Center in Seattle, Washington

June 05, 2026 Digital Realty Trust

Digital Realty is planning a new data center in Seattle, Washington, as the city considers a moratorium on new developments. According to BizJournal and other reports, the company has filed plans with the Seattle City Council to replace the existing retail building and parking garage at 301...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?