H5 Phoenix

Latest Podcast 2600 W Germann Rd
Operational
Fully operational facility
Operated by:

H5 Phoenix

Year Built: 2015
PUE: 1.35
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

H5 acquired the site when it bought NextFort in January 2016

The datacenter can be expanded to 180,000 sqft and 30 MW.

Map and Nearby Locations

2600 W Germann Rd
H5 Data Centers Sites
Nearby Facilities

H5 Phoenix Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of H5 Phoenix

Distance Site About
0.17 miles 2121 S Price - Digital Realty
In 2010, DRT acquired this site from 365 Main portfolio.
0.26 miles 1900 S Price - Digital Realty
The Building is 1 story Flood Zone: Zone X Seismic Zone: Zone 1
0.29 miles CyrusOne PHX9
0.33 miles CyrusOne PHX10
0.39 miles CyrusOne PHX2
0.42 miles CyrusOne PHX3
0.49 miles CyrusOne Chandler Phoenix Campus
CyrusOne plans to build nearly 2 million square-feet data center campus. There are two buildings on the campus currently
0.49 miles CyrusOne PHX1
0.55 miles Aligned: PHX-04
Aligned Energy's PHX04 site is located at the NEC of Price Road and Innovation Street. The data center spans 396,343 sqft.
0.55 miles CyrusOne PHX5
0.61 miles CyrusOne PHX4
0.68 miles CyrusOne PHX6
0.68 miles DataCanopy: Phoenix, AZ
0.74 miles CyrusOne PHX8
0.75 miles Aligned: PHX-06
PHX06 is a two-phase development that will total 456,946 SqFt
0.77 miles CyrusOne PHX7
1.55 miles Lincoln: Chandler Bldg-2
Lincoln Property's three-story, 243,000 sq ft expansion building is part of a future development plan that was approved by the City of Chandler under the previous owner.
1.62 miles Lincoln: Chandler, AZ
Real estate firm Lincoln Property Company reacquired its data center in Phoenix, Arizona, in 2025.
1.65 miles Internap Phoenix 2500 W Frye Rd
American cloud and colocation provider Internap (INAP) has taken a master lease in a 150,000 square foot data center in Chandler, near Phoenix, Arizona.
4.59 miles 2010 East Centennial
Digital Realty sold the office & data center building in 2018 to an unnamed company. We believe Fox Sports is the tenant.
4.80 miles 2055 E Technology - Digital Realty
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix. The building is SOC2 certified with 24/7 security and critical facilities management.
5.78 miles Menlo: MD-PX1 Bldg3
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
5.81 miles Menlo: MD-PX1 Bldg5
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
5.86 miles Menlo: MD-PX1 (Phoenix)
Menlo Digital's MD-PX1 (Phoenix) data center campus consists of five buildings on 38 acres. The campus will span 1,022,400 square feet.
5.88 miles Menlo: MD-PX1 Bldg2
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
5.91 miles Menlo: MD-PX1 Bldg4
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
6.39 miles US Signal Phoenix AZ01
9.50 miles EdgeConneX Phoenix
10.08 miles Centersquare: PHX1
Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.
11.95 miles PhoenixNAP-Phoenix
PhoenixNAP is a local provider which operates the data center campus, located east of downtown near Phoenix Sky Harbor International Airport.
12.03 miles PhoenixNAP: PHX02
PhoenixNAP will expand its Phoenix data center campus with a second building, PHX02, slated for construction in late 2025.
12.04 miles Verizon: 3930 Watkins
This facility is a former XO Communications site. In 2017, Verizon completed the $1.8 billion acquisition of XO Communications' fiber-optic network business.
13.09 miles Hyperscale Data Center Request Dataset
13.20 miles Iron Mountain: AZP2
In 2019, Iron Mountain completed the first phase of AZP-2 in Phoenix.
13.31 miles DataBank PHX2
13.32 miles Internap Phoenix
13.32 miles Iron Mountain Phoenix
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio) 41-acre Iron Mountain Hyperscale-Ready campus 588,000 gross square feet 32 MW – redundant feeds
13.34 miles Hyperscale Data Center Request Dataset
Phase II is expected to see Google build 280,000 square feet more.
13.35 miles Centersquare: Phoenix PH1
13.42 miles Iron Mountain: AZP3
Iron Mountain's AZP-3 data center is located in Phoenix, Arizona.
13.42 miles Hyperscale Data Center Request Dataset
This facility will be a part of Google's Redhawk campus in Mesa, AZ.
13.97 miles STACK Phoenix PHX02 Campus
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
14.03 miles Stack: PHX02B
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
14.06 miles Stack: PHX02C
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
14.12 miles Stack: PHX02D
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
14.18 miles Stack: PHX02E
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
14.24 miles QTS: Phoenix II Campus
QTS Phoenix Data Center Campus (PHX II) sits on an 85-acre site with 5 data center buildings.
14.32 miles QTS: PHX2 DC2
PHX2 DC2 data center building will be a part of QTS' Phoenix Campus.
14.33 miles QTS: PHX2 DC3
PHX2 DC3 data center building is a part of QTS' Phoenix Campus.
14.42 miles QTS: PHX2 DC4
PHX2 DC4 data center building is a part of QTS' Phoenix Campus.
14.49 miles QTS: PHX2 DC5
PHX2 DC5 data center building is a part of QTS' Phoenix Campus. QTS broke ground on this data center in 2023.
14.52 miles Edged: Phoenix
Edged Energy’s PHX01-1 is a 36MW, two-story data center in Mesa, Arizona, spanning ~210,000 sq ft on a 12-acre site, launched in April 2026 with waterless cooling for high-density AI workloads.
14.52 miles Edged Energy: Phoenix, Arizona
Edged Energy is building a 79,200 sq ft data center on a 14-acre site near the Loop 202 freeway and Warner Road.
14.59 miles Windstream Phoenix
Located in Phoenix, Arizona, this 4,400 square foot Phoenix data center is designed to serve the businesses in the Southwest. The facility was previously a PAETEC data center.
14.62 miles Lumen Phoenix 1
14.63 miles Edged Energy: Phoenix PHX11
Edged Energy is planning a built-to-suit data center near its PHX01 facility.
14.70 miles Novva: Mesa 5
This facility is a part of Novva's Mesa campus in Arizona.
14.70 miles Edgeconnex: Mesa
EdgeConneX is building a massive data center campus on a 93-acre land parcel it has owned since 2017 through Loop 202 & Elliot Road LLC.
14.73 miles Novva: Mesa 4
This facility is a part of Novva's Mesa campus in Arizona.
14.76 miles Novva: Mesa 3
This facility is a part of Novva's Mesa campus in Arizona.
14.76 miles GoDaddy: Gilbert, AZ
GoDaddy’s own data center in Phoenix is more than 270,000 square feet in size. The data center features
eight data halls, 11 diesel backup generators, room for eight more pods.
14.94 miles Novva: Mesa 2
This facility is a part of Novva's Mesa campus in Arizona.
14.97 miles Novva: Mesa Campus
Covering 160 acres, Novva’s first Arizona Data Center campus is located in Mesa, AZ. The campus includes five data halls, 1.3 million sq ft of data hall space, and 200,000 square feet of office space built over 2 phases.
15.37 miles Hyperscale Data Center Request Dataset
Meta's Mesa data center was first announced in August 2021, is a greenfield development of a five-building campus encompassing over 2.5 million square feet of data center and admin space.
15.45 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
15.47 miles Comarch Mesa
15.54 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
15.63 miles NTT: Pacific 7
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
15.63 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
15.63 miles NTT: Pacific 6
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
15.64 miles NTT: Pacific 5
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
15.66 miles NTT: Pacific 4
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
15.76 miles Hyperscale Data Center Request Dataset
This facility is a part of Meta's Mesa Campus in Arizona.
15.76 miles CyrusOne Mesa
CyrusOne plans to develop a new campus on 62 acres on the corner of Elliot and Ellsworth Roads.
15.79 miles EdgeCore: PH03
15.86 miles NTT: Pacific 3
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
15.87 miles NTT: Pacific 2
This planned facility will be part of NTT's Pacific Proving Technology Park located in Mesa, Arizona.
15.89 miles NTT: Pacific Proving Tech Park
NTT Data has acquired 173 acres at the northeast intersection of Pecos and Crismon roads, east of Mesa, for $300 million.
15.94 miles Metrobloks: Phoenix PHX-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the heart of downtown Phoenix, with live capacity scheduled for Q2 2027.
15.98 miles EdgeCore: PH02
16.05 miles EdgeCore: Mesa PH01
The 1.25 million sqft campus can include up to 7 buildings. The first of the seven data halls is complete and totals 200,880 sqft with an adjoining 20,000 sqft office and support space included.
16.07 miles EdgeCore: Mesa Expansion
EdgeCore Digital Infrastructure is significantly expanding its data center campus in Mesa, Arizona. The company plans to add an additional 43.87 acres to its existing 40-acre facility.
16.14 miles Hyperscale Data Center Request Dataset
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa.
16.17 miles 120 E Van Buren - Digital Realty
120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix. The building is also home to many colocation operators including AIS, QTS, Sungard, XO
16.17 miles LightEdge: Phoenix Van Buren
16.18 miles QTS Phoenix Van Buren
QTS acquired this site via the Carpathia acquisition in 2015.
16.57 miles NTT PH3
16.60 miles NTT PH2
16.61 miles NTT Phoenix Campus
The first data center building encompasses 126,000 sqft of data floor space.
16.62 miles Hyperscale Data Center Request Dataset
Amazon.com Inc. looks to be getting closer to starting construction on two separate data center projects in southeast Mesa. The Elliot campus is a 42.9-acre property located off Elliot Road, adjacent to Apple's existing data center in Mesa.
16.69 miles NTT PH6
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
16.72 miles NTT PH5
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
16.74 miles NTT PH4
This facility is part of NTT's Phoenix Campus in Mesa, Arizona.
16.95 miles Hyperscale Data Center Request Dataset
The site was a former a sapphire-glass factory that supplied glass to Apple. The glass maker filed for bankruptcy and vacated the building in 2014. Now the 1.3 million square foot building is one of Apple’s data centers
17.49 miles Lumen Phoenix 2
17.99 miles DataBank Phoenix PHX1
18.35 miles eBay Arizona
eBay's data center is also known as Project Mercury.
18.36 miles Liquid Web Phoenix
18.94 miles Hyperscale Data Center Request Dataset
Amazon Data Services has acquired land for a potential data center campus in Laveen, Phoenix. The 220-acre site, located near Loop 202 and Dobbins Road, was purchased for $277 million ($1.2 million per acre).
19.03 miles 5CDC: Phoenix PHX01
5C Data Centers is building a data center campus in Phoenix, Arizona. The first facility, PHX01, sits at 2802 W Palm Lane, a few miles west of downtown Phoenix, and is currently under construction.

H5 Phoenix Data Center Photos See all

Looking Down at Long Hallway at H5's Phoenix Facility
Source: Baxtel
Lobby
Source: H5
H5 Phoenix at Sunset
Source: H5 Data Centers
Long Hallway between Colocation Rooms
Source: H5 Data Centers

Operating Company

Operated by:

H5 Company History:


  • July 2018, Acquires Intiuit datacenter in Quincy, WA
  • March 2018, H5 Expands to Albuquerque (505 Marquette)
  • January 2017, the Cleveland Technology Center (CTC) from ByteGrid. Source: Telecom Ramblings
  • January 2016 H5 acquired NextFort and its Phoenix datacenter.
  • June 2015, H5 acquired their Ashburn datacenter. Source: H5 Press Release
35
Facilities
26
Markets
281MW
Megawatts

News See all

Read Phoenix to clamp down on data centers
Phoenix to clamp down on data centers

Phoenix to clamp down on data centers

January 02, 2025 Phoenix

The city of Phoenix in Arizona is set to clamp down on data centers. The City Council has approved a series of changes to better regulate data center growth in the city, including regulating locations and external design specifications.The vote, which took place on December 10, targeted...

Read more
Read H5 expands its San Antonio data center
H5 expands its San Antonio data center

H5 expands its San Antonio data center

November 21, 2023 H5 Data Centers

H5 this week announced the phase three expansion of its 100 Taylor Street facility, adding an additional 340 cabinets and up to 1.5MW of additional UPS capacity. This site, located at 100 Taylor Street, was acquired by H5 in 2018 and was previously owned by the Texas ISP Taylor Telecom. It is an...

Read more
Read H5 Data Centers to expand its Phoenix data center
H5 Data Centers to expand its Phoenix data center

H5 Data Centers to expand its Phoenix data center

July 04, 2023 H5 Data Centers

H5 Data Centers has announced a 30,000 sqft expansion of its Phoenix colocation facility. Located at 2600 W. Germann Road in Chandler, AZ, this expansion is part of the company's third phase of development at the 180,000-square-foot data center. Further to this square-footage expansion, phase...

Read more
Read Phoenix Data center with 6 MW up for sale
Phoenix Data center with 6 MW up for sale

Phoenix Data center with 6 MW up for sale

June 27, 2023 Phoenix

A 6MW data facility is up for lease or purchase in Phoenix, Arizona. Located in the desirable Deer Valley neighborhood, CBRE has listed 20435 North 26th Avenue for sale or lease. There was no listed pricing. The 6MW facility was completed in 2003 and sits on 3.66 acres of land, with a raised...

Read more
Read Construction of H5's Ashburn, VA Data Center Begins
Construction of H5's Ashburn, VA Data Center Begins

Construction of H5's Ashburn, VA Data Center Begins

March 22, 2023 H5 Data Centers

After dismantling the former data center there, H5 Data Centers has started construction on a new one in Ashburn, Virginia. This week, the company started building a 255,000-square-foot, three-story data center with a 42-megawatt capacity. The building is offered for pre-leasing at Loudoun...

Read more
Read More News