Sweden Data Center Market

Latest Podcast
Sweden's data centre market runs from colocation in Stockholm to hyperscale campuses in Gävleborg, Mälardalen and Dalarna and new AI builds in Norrland. Fossil-free power, a cold climate and district heating networks that buy server heat draw developers. Grid capacity in the south and a long connection queue limit growth. Read More

Market Facts

Sweden Data Center Map

Sweden Power Growth Over Time

+98% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Sweden

Microsoft Azure
Site
Power
Operational
9
244.0
Construction
5
Planned
3
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
14
View Provider
Amazon AWS
Site
Power
Operational
6
193.0
Construction
3
Planned
5
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
9
View Provider
EdgeConneX
Site
Power
Operational
0
0.0
Construction
1
Planned
2
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Meta
Site
Power
Operational
3
75.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
3
View Provider

Largest Data Centers in Sweden

Location About Total SqFt Power (MW)
OneInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset NN Request Dataset
TwoInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset NN Request Dataset
Edge PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset NN Request Dataset
EcoDataCenter Falun, Sweden
EcoDataCenter's first campus, in Falun, Dalarna: 41 MW of IT in service at the end of 2025, growi...
NN Request Dataset
Edge StationInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset NN Request Dataset

Regions in Sweden

Data Center Events in Sweden See all

2 events
Event Starts in Details
7 days
View Datacenter Forum Stockholm 2026
Organized by:
Datacenter Fourm
Type:
Data Center
Description:

Datacenter Forum Stockholm 2026 is the 12th annual edition of the Nordic data center community's flagship forum, organized by Datacenter Forum. It runs December 3, 2026 at Stockholmsmässan in Älvsjö, Stockholm, and brings together more than 700 professionals from Sweden's data center and IT infrastructure sector. Registration is free for qualifying end-users, operators, and enterprise decision-...

280 days
View DCN Stockholm 2027
Organized by:
Data Center Nation
Type:
Data Center
Description:

DCN Stockholm 2027 is a full-day pan-Nordic digital infrastructure conference and exhibition organized by Data Center Nation in collaboration with the Swedish Datacenter Industry Association (SweDCI). Taking place on September 2, 2027 in Stockholm, Sweden, the summit brings together more than 750 data center decision-makers, over 85 industry speakers, and 25 thought-leadership sessions addressi...

About Sweden

Sweden Data Centre Market Overview

Sweden is one of the main data centre markets in the Nordics. Stockholm holds most of its colocation and interconnection. Microsoft, AWS and Meta run hyperscale campuses outside the capital and in the north. Since 2024, AI developers have chased spare grid capacity in Norrland. The grid sets the pace: the north has room, and the south has little.

History

Sweden's commercial market grew up in Stockholm. Interxion opened its first Stockholm data centre in Kista. Bahnhof opened Pionen, a former nuclear shelter under Södermalm, in 2008. In October 2011 Facebook chose Luleå for its first data centre outside the US. Meta's first Luleå building went live in June 2013.

Equinix gained its three Stockholm sites in January 2016 by buying TelecityGroup. In January 2017 Sweden cut the electricity tax for data centres of 0.5 MW or more to near zero. In 2018 it extended the cut to sites of 0.1 MW or more. AWS opened its Europe (Stockholm) region in December 2018. Digital Realty took over Interxion in March 2020, and Microsoft opened its Sweden Central region in November 2021.

Parliament abolished the tax cut from 1 July 2023. In June 2024 Microsoft pledged SEK 33.7 billion for Swedish cloud and AI. Ownership turned over from 2025. EcoDataCenter sold its Stockholm and Piteå sites to Kolo DC, and Telenor bought a majority of Bahnhof in 2026.

Data Centres in Sweden Today

Stockholm's main cluster is Kista. Digital Realty's six-building campus there hosts more networks than any other Swedish site. The cluster also holds an atNorth site, with a second under construction. Equinix, Conapto, Bahnhof, GlobalConnect and GleSYS serve retail customers. Evroc plans an AI data centre at Arlandastad.

Gothenburg is a small enterprise market. Göteborg Energi's Marieholm site is its main interconnection point. Bahnhof is building a data centre in a rock cavern in the city's northeast, due in late 2027.

Malmö faces Copenhagen across the Öresund. Microsoft runs a data centre in Staffanstorp, east of the city. Stena's Västergatan building is the main carrier hotel. Hässleholm has reserved land for a Panattoni campus, with a first phase targeted for 2033.

Gävleborg holds Microsoft's largest Swedish footprint, with two campuses in Gävle and one in Sandviken. New halls wait on regional lines from Vattenfall Eldistribution. Hyperco has a building permit for a campus at Lingbo in Ockelbo.

Mälardalen, west of Stockholm, hosts AWS's Stockholm region on campuses in Eskilstuna, Västerås and Katrineholm. Scandinavian Data Centers is fitting out a wartime rock cave in Eskilstuna for colocation. Brookfield plans a large AI campus at Strängnäs, part of an investment plan of up to SEK 95 billion.

Dalarna is EcoDataCenter's home market. Its Falun campus opened in 2018 and hosts CoreWeave, DeepL and BMW. In Borlänge it is building for Mistral AI on a former paper mill site. Microsoft has agreed to rent Mistral capacity there. EcoDataCenter has also signed for land in Smedjebacken, near Ludvika. Google broke ground at Horndal in June 2026 and targets completion in 2028.

Norrland has the most spare grid capacity. Meta's Luleå campus anchors Norrbotten. Ardent, part of Rumble since June 2026, runs GPU cloud capacity in Boden. Kolo DC runs a site in Piteå. EdgeConneX's Skellefteå campus is rising on part of Northvolt's former battery plant site. At Sollefteå, atNorth plans a large campus for 2028. Google has a conditional deal to buy the Torsboda industrial park near Sundsvall. Fossefall plans an AI campus near Jokkmokk.

Why Build Data Centres in Sweden?

  • Fossil-free power. Low-carbon sources generated about 99% of Sweden's electricity in 2025.
  • Northern grid room. Svenska kraftnät (Svk) maps more than 500 MW of free withdrawal capacity in each of Norrbotten, Västerbotten, Västernorrland, Jämtland and Dalarna.
  • Lower northern tax. Electricity used in Norrbotten, Västerbotten, Jämtland and nine nearby municipalities carries a tax deduction of 9.6 öre per kWh, open to data centres since July 2023.
  • Climate and heat buyers. A cold climate allows long free-cooling seasons. Stockholm Exergi and other district heating networks buy server heat.
  • Interconnection. Netnod runs internet exchanges in Stockholm, Gothenburg and Sundsvall.

What Limits Data Centre Growth in Sweden?

  • Grid in the south. Svk says Stockholm's power use is already so high that it cannot grant further increases on the current transmission grid. Its reinforcements there run to about 2030. Stockholm, Uppsala, Södermanland, Gävleborg and Västra Götaland each have less than 50 MW of free withdrawal capacity.
  • Connection queue. Data centres had 8,200 MW of applications in Svk's queue on 1 November 2026. Two days later Svk said it is considering temporary limits on very large applications.
  • Stalled projects. In June 2025 Svk said Brookfield's Strängnäs load was too large for the local grid. In September 2026 Vantage paused its Tierp campus because its power was not secured.
  • Tax and prices. Data centres pay the general electricity tax, 36.0 öre per kWh in 2026. In 2025, average spot prices in the southern zones were roughly three times those in the north.

Sweden Data Centre Trends

  • Sovereign AI. Mistral AI, Brookfield with Telia, and Evroc plan AI capacity for European customers. Swedish companies launched the Sferical One supercomputer in Linköping in October 2026.
  • Moving north. New campuses follow spare grid capacity to Norrland, often onto former industrial land.
  • Crypto gives way to AI. HIVE is phasing down bitcoin mining in Sweden and plans AI hosting at Boden.
  • Heat reuse. In November 2026 atNorth signed a heat deal with Calentix for its Sollefteå campus.

Power and Policy in Sweden

Svk runs the 400 kV and 220 kV transmission grid and the connection queue. The Swedish Energy Markets Inspectorate (Energimarknadsinspektionen, Ei) regulates the grids. Ellevio, Vattenfall Eldistribution and E.ON Energidistribution run the largest distribution grids. Sweden has had four bidding zones, SE1 in the north to SE4 in the south, since November 2011. A project that misses Svk's deadlines loses its queue place. Since July 2025, data centres of 500 kW or more report energy data each year to an EU database. A national data-centre strategy is in preparation.

Get Quotes

Related News See all

Read atNorth Signs Calentix Heat Reuse Deal at 300MW Sollefteå Site
atNorth has signed a [project development agreement](https://calentix.com/en/resources/atnorth-calentix-heat-reuse-swe04) with the Swedish energy infrastructure company Calentix covering the [SWE04...

atNorth Signs Calentix Heat Reuse Deal at 300MW Sollefteå Site

November 04, 2026 atNorth

atNorth has signed a project development agreement with the Swedish energy infrastructure company Calentix covering the SWE04 data center in Långsele, Sweden. Under the agreement, Calentix will develop and finance a system that recovers surplus heat from SWE04 and supplies it to the nearby...

Read more
Read Data Center Operator Renews Lease for Vanda 3 Data Center in Stockholm, Sweden
Alternative investment manager Barings has signed a 10-year lease extension with a global data center operator at its Vanda 3 facility in Kista, Stockholm. The deal includes an additional 30MW of p...

Data Center Operator Renews Lease for Vanda 3 Data Center in Stockholm, Sweden

July 03, 2026 Sweden

Alternative investment manager Barings has signed a 10-year lease extension with a global data center operator at its Vanda 3 facility in Kista, Stockholm. The deal includes an additional 30MW of power from Ellevio to support expansion, with Barings planning to add 25,000 sqm (269,100 sq ft) of...

Read more
Read Blykalla Raises $50m as it Advances Plans to Power Data Centers
Blykalla Raises $50m as it Advances Plans to Power Data Centers

Blykalla Raises $50m as it Advances Plans to Power Data Centers

December 27, 2025 Sweden

Swedish small modular reactor (SMR) start-up Blykalla has closed a $50 million (€42m) financing round to accelerate development of its lead-cooled SMR, with a focus on meeting growing demand from the data center sector.Blykalla said that it will use the capital to scale testing and validation...

Read more
Read EdgeMode Explores Development of 20MW AI Data Center in Sweden
EdgeMode Explores Development of 20MW AI Data Center in Sweden

EdgeMode Explores Development of 20MW AI Data Center in Sweden

August 14, 2025 Sweden

EdgeMode, a US-based data center developer, has partnered with AI infrastructure firm Vertical Data to market and deliver a 20MW AI data center in Sweden. The project aims to combine EdgeMode’s Marviken Smart Energy Cluster, which is tied to a 95MW renewable Power Purchase Agreement (PPA),...

Read more
Read EdgeMode acquires Synthesis Analytics Production
EdgeMode acquires Synthesis Analytics Production

EdgeMode acquires Synthesis Analytics Production

June 17, 2025 Sweden

US data center firm EdgeMode has announced the acquisition of Synthesis Analytics Production Ltd. (SAPL), in a $1.75 million deal that sees EdgeMode take charge of a 95MW power purchase agreement, a long-term lease on an in-development 20MW high-performance computing data center, and freehold...

Read more
Read DeepL Deploys Nvidia DGX SuperPOD in Falun, Sweden
DeepL Deploys Nvidia DGX SuperPOD in Falun, Sweden

DeepL Deploys Nvidia DGX SuperPOD in Falun, Sweden

June 17, 2025 Sweden

Language AI company DeepL has deployed an Nvidia DGX SuperPOD with GB200 NVL72 systems at EcoDataCenter's Falun, Sweden, facility. DeepL will use the GB200 NVL72 systems to train its models, noting in a LinkedIn post that the system is powerful enough that it can translate the "entire...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...