Overview
Halland is a coastal county in southwest Sweden, between Gothenburg and Skåne. Halmstad is its seat. The market grew around GleSYS, a Falkenberg-based cloud provider. GleSYS built a data hall in the town in 2011 and replaced it with a larger data centre in October 2020.
The Market Today
GleSYS's Falkenberg data centre sells colocation and cloud capacity. In 2025 it gained an AI pod built for direct liquid cooling. Cube Infrastructure Managers has controlled GleSYS since 2023.
Two larger projects are at an early stage. In October 2026 Hylte kommun granted Magnora a building permit for a data centre in Hyltebruk, with a first phase targeted for around 2029. In September 2026 a Halmstad council committee backed a letter of intent with T.Loop for land in the Kistinge industrial area.
Advantages
-
Grid room. Svenska kraftnät (Svk) shows 300 to 500 MW of spare transmission capacity for new load in Halland in 2026. Neighbouring Västra Götaland has under 50 MW.
-
Nuclear power. Vattenfall's Ringhals plant near Varberg runs two reactors. Vattenfall plans new reactors on the same peninsula.
-
Heat buyers. Falkenberg Energi takes GleSYS's waste heat for district heating. Halmstads Energi och Miljö (HEM) has a letter of intent to take T.Loop's.
Challenges
-
Southern prices. Falkenberg, Halmstad and Hylte lie in bidding zone SE4. Wholesale power there cost more in 2025 than in any other Swedish zone.
-
Early-stage projects. Magnora will decide on investment only once permits and a grid connection are in place. T.Loop has until April 2027 to decide whether to buy the Halmstad land.
Power and Policy
Svk runs the transmission grid, and Energimarknadsinspektionen (Ei) regulates the network companies. Falkenberg Energi Elnät and HEM Nät run the local grids in Falkenberg and Halmstad. E.ON Energidistribution owns the regional grid at Hylte, and Magnora's connection there needs a network concession from Ei.