Jämtland is a small data centre market in central Sweden. Spare grid capacity and a northern tax deduction draw interest, but EcoDataCenter cancelled its Östersund campus in 2025 for lack of a powered site. Read More

Market Facts

Jämtland Data Center Map

Jämtland Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Jämtland

Vostroblock
Site
Power
Operational
1
6.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
1
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
EcoDataCenter (EcoDC AB)
Site
Power
Operational
0
0.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
1
Decommissioned
0
Totals
0
View Provider

Largest Data Centers in Jämtland

Location About Total SqFt Power (MW)
Plaza MaxInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
EcoDataCenter: Östersund (Verksmon)
Cancelled EcoDataCenter campus at Verksmon in Östersund, Jämtland, planned from 2023 with a food-...

About This Metro

Overview

Jämtland is an inland county in central Sweden, centred on Östersund. In 2023 EcoDataCenter announced a large campus at Verksmon outside the city, paired with greenhouses heated by server heat. In September 2025 it dropped the plan to concentrate on Dalarna, where it had powered land ready. Nothing was built.

The Market Today

Vostroblock mines bitcoin in a former floor factory in Bräcke. Its subsidiary Roofscapes plans a larger campus there with a connection to the 400 kV grid. In October 2026 Bräcke's municipal council approved selling Roofscapes more land, and a new local plan is under way.

Advantages

  • Grid room. Svenska kraftnät (Svk) maps more than 500 MW of free withdrawal capacity in Jämtland for 2026. It has allocated or reserved only 450 MW in the county for 2027 to 2035.
  • Lower tax. All of Jämtland qualifies for the Norrland deduction of 9.6 öre per kWh from the energy tax.

Challenges

  • Powered sites. In April 2024 Jämtkraft cancelled the groundwork tender at Verksmon. A full connection to the new grid was not due until late 2027, and EcoDataCenter said its customers no longer had time to wait.
  • Grid costs. In October 2026 Jämtkraft sued EcoDataCenter for about SEK 140 million in grid preparation costs.

Power and Policy

Jämtland lies in SE2. Jämtkraft, Östersund's municipal energy company, runs the grid around the city, and Härjeåns Nät serves Bräcke. After the campus fell through, Jämtkraft turned its grid plans to Uniper's planned fuel plant at Lugnvik.

Get Quotes

Related News See all

Read EcoDataCenter Secures 10MW Hydropower PPA with Fortum in Sweden
Nordic data center developer EcoDataCenter has signed a 10MW hydroelectric power purchase agreement with Finnish energy company Fortum to supply its Falun, Sweden facility. Under the four-year deal...

EcoDataCenter Secures 10MW Hydropower PPA with Fortum in Sweden

June 26, 2026 EcoDataCenter (EcoDC AB)

Nordic data center developer EcoDataCenter has signed a 10MW hydroelectric power purchase agreement with Finnish energy company Fortum to supply its Falun, Sweden facility. Under the four-year deal running from 2026 to 2030, EcoDataCenter will source electricity from Fortum’s Dalälven hydro plant...

Read more
Read EcoDataCenter Breaks Ground on Borlänge Facility
EcoDataCenter Breaks Ground on Borlänge Facility

EcoDataCenter Breaks Ground on Borlänge Facility

September 25, 2025 EcoDataCenter (EcoDC AB)

EcoDataCenter has broken ground on a new data center in Borlänge, Sweden, marking the beginning of construction on 20 hectares of land formerly occupied by a paper mill. At completion, the first phase of the facility will have access to 250MW of energy, with the company’s LinkedIn post stating...

Read more
Read EcoDataCeter to double capacity of Swedish data center
EcoDataCeter to double capacity of Swedish data center

EcoDataCeter to double capacity of Swedish data center

November 27, 2023 EcoDataCenter (EcoDC AB)

EcoDataCenter has revealed plans to expand its main data center and more than double its current capacity. The first phase of the EcoDataCenter 1 expansion is expected to be completed by the third quarter of 2024, and the full build out by second quarter of 2025. The expansion will bring the...

Read more
Read EcoDataCenter raised €170 million in debt financing
EcoDataCenter raised €170 million in debt financing

EcoDataCenter raised €170 million in debt financing

November 17, 2023 EcoDataCenter (EcoDC AB)

Swedish data center firm EcoDataCenter has raised €170 million ($184.3m) in debt financing from a consortium of banks comprising KfW IPEX and Kommunalkredit as global coordinators and mandated lead arrangers, and Investec and NIBC as mandated lead arrangers. This fund will be used to “enhance the...

Read more
Read EcoDataCenter announces circular-focused data center plans in Östersund, Sweden
EcoDataCenter announces circular-focused data center plans in Östersund, Sweden

EcoDataCenter announces circular-focused data center plans in Östersund, Sweden

April 21, 2023 EcoDataCenter (EcoDC AB)

In Sweden, EcoDataCenter has announced expansion plans. The Nordic data center firm has outlined its intentions to develop a new 150MW campus, located in Östersund, Sweden. The facility, known as EcoDataCenter 2, will offer 20 MW in its first phase, which is set to be completed in 2026; this...

Read more
Read EcoDataCenter announces eco plans
EcoDataCenter announces eco plans

EcoDataCenter announces eco plans

October 13, 2022 EcoDataCenter (EcoDC AB)

EcoDataCenters has announced that it is teaming up with WA3RM to promote circular economy principles by sharing excess heat for large-scale cultivation in fish farms and greenhouses. While others in the industry have already pursued such opportunities within agriculture, it's noted that...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.