Green Datacenter: Dielsdorf Bldg M

Short Code: ZRH2 DC1
Year Built: 2022
Utility Provider: EKZ
Lot Size: 11 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Data Center 1 (Building M) is the first of three data centers on Green's Campus ZRH2 in Dielsdorf. It is a four-storey building with 5,600 m² of white space, ambient-air free cooling and rooftop solar. Implenia built it from 2021. Customers moved in in December 2022, and Green opened it officially on 17 January 2023. Nine Cat diesel generator sets back it up. It was the first building on the campus to feed waste heat to Energie 360°'s Dielsdorf heating network.

Map and Nearby Locations

Niederhaslistrasse 6c
Green Datacenter AG Sites
Nearby Facilities

Green Datacenter: Dielsdorf Bldg M Power Growth Over Time

+80% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Green Datacenter: Dielsdorf Bldg M

Distance Site About
0.04 miles Green Datacenter: Dielsdorf Bldg N
Data Center 2 (Building N) of Green's Campus ZRH2 in Dielsdorf: a four-storey data center with 5,800 m² of white space, built by Implenia beside Data Center 1, with waste heat recovery for the Dielsdorf heating network.
0.10 miles Green Datacenter: Dielsdorf Bldg O
Data Center 3 (Building O) of Green's Campus ZRH2 in Dielsdorf, under construction north of Data Center 2, with 5,800 m² of planned white space and waste heat recovery for the Dielsdorf heating network.
4.20 miles NTT Zurich 1
The site was opened in June 2011, is located in Rümlang near Zurich.
4.79 miles STACK: ZUR03
STACK Infrastructure plans to build another data center in Zurich.
5.21 miles Equinix Zurich ZH5
5.48 miles Green Datacenter Zurich City (Schlieren)
5.50 miles Digital Realty: ZUR2
5.52 miles Digital Realty: ZUR3
5.55 miles Digital Realty: ZUR1
5.55 miles Digital Realty: ZUR4
Digital Realty plans to expand its campus near the Swiss capital with a fourth building.
5.60 miles Green Datacenter Glattbrugg
6.05 miles AtlasEdge: Zurich
6.13 miles Vantage: Zurich II
Vantage's second data center in Switzerland is located north of Zurich's city center in Glattfelden. Set on 1 acre, the two-story facility offers a total of 226,000 square feet (21,000 sq m) of space.
6.36 miles Swisscom Zürich
6.98 miles Equinix Zürich ZH1
6.99 miles nLighten: Zurich
6.99 miles Equinix Zurich ZH2 ZH4
8.10 miles OneInterested in this information?Contact us
The Google Cloud Region in Zurich was announced in May 2018 and opened in March 2019.
9.07 miles STACK ZUR01
11.96 miles Green Datacenter: Zurich West 4
Green's fourth Lupfig data center: a 30 m building with 5,526 m² of data center space and about 2,000 m² of offices, free cooling, rooftop solar, and waste heat fed to IBB's Naturenergie Eigenamt heating network.
11.99 miles Green Datacenter: Zurich West 1
Trakt A of Green's original Lupfig building: 3,300 m² of white space on three floors, including a 1,100 m² hall on ABB 380 V DC power distribution, once billed as the world's most powerful DC-powered data center.
11.99 miles Green Datacenter: Lupfig ZRH1 Expansion
Future data center phases on Green's Lupfig campus beyond Zurich West 4. Green's 2021 plans showed three further buildings at the site, one of which became Zurich West 4.
12.01 miles Green Datacenter: Zurich West 2
Trakt B of Green's original Lupfig building, attached to Zurich West 1: 3,548 m² of white space in 8,330 m² gross floor area, with ammonia free-cooling chillers and an ABB hybrid power supply.
12.04 miles Green Datacenter: Zurich West 3
Switzerland's first high-density colocation building: a six-storey, CHF 70 million data center on Green's Lupfig campus with 3,600 m² of white space for up to 25 kW per rack.
12.28 miles Vantage: Zurich ZRH3
Vantage plans to build its ZRH3 campus in Zurich on approximately 13 acres of land. The campus may include one or two buildings.
12.43 miles NorthC: Winterthur (Zurich)
13.91 miles Vantage: ZRH13
ZRH13 is the third planned data center on Vantage's Zurich I campus in Winterthur.
13.99 miles Vantage: ZRH12
ZRH12 is the second data center on Vantage's Zurich I campus in Winterthur.
14.02 miles Vantage: ZRH11
ZRH11 is the first data center on Vantage's Zurich I campus in Winterthur.
15.71 miles STACK: ZUR02 Beringen
STACK Infrastructure topped out its ZUR02 facility in Beringen, Schaffhausen, in 2025. The facility was previously known as Safe Host SH5 Beringen before the company was acquired by STACK in May 2022.

Green Datacenter: Dielsdorf Bldg M Data Center Photos See all

Rendering of the Green Datacenter campus announced in January 2021
Source: Baxtel

Operating Company

Operated by:
0
Facilities
0
Markets

News See all

Read Green launches data center campus in Zurich
Green launches data center campus in Zurich

Green launches data center campus in Zurich

January 24, 2023 Zurich

Green has announced the launch of its 46,000 sqm (495,150 sq ft) site new data center campus in the Dielsdorf region in Zurich. According to the Swiss data center operator, the campus, when fully built out, will contain three buildings, namely M, N, and O.Announced back in January 2021,...

Read more
Read Switzerland's Data Center Operator Green Closes $514 Million Refinancing
Switzerland's Data Center Operator Green Closes $514 Million Refinancing

Switzerland's Data Center Operator Green Closes $514 Million Refinancing

December 02, 2022 Green Datacenter AG

Green has announced the closing of a $514 million refinancing. The Swiss data center operator successfully refinanced its existing facilities with a total package of CHF 480 million ($514m) from Swiss and international banks. According to the company, the funds will be used to speed up its...

Read more
Read Green Datacenter Invests in large Zurich Campus
Green Datacenter Invests in large Zurich Campus

Green Datacenter Invests in large Zurich Campus

January 18, 2021 Green Datacenter: Dielsdorf Bldg M

Green Datacenter announced they will begin construction on a new data center campus North of Zurich in the town of Dielsdorf. The campus, named "Zurich Metro Campus", will have three data center buildings and will contain over 46,000 sqm (495,000 sq ft). There will also be three office buildings...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?