nLighten: Zurich

Latest Podcast Josefstrasse 225
Operational
Fully operational facility
Operated by:

nLighten: Zurich

Short Code: ZUR-JOS
Ownership: nLighten does not own the building.
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

In April 2024, nLighten acquired the site from Exa Infrastructure.

In May 2018, GTT acquired the site in a $2.3 billion acquisition of Interoute. (TR PR Source)

Power & Cooling

  • Total power supply to site: 1000 kVA
  • Total generator power: 900 kVA
  • Total UPS power: 1200 kVA
  • Cooling type: Chilled water
  • Total cooling: 560 kW

Datacenter Details

  • Gross size of data centre: 1196 m²
  • Net size of customer space: 425 m²
  • Building type: Concrete
  • Building tenure: Leasehold
  • Number of data suites: 3
  • Suit expansion available: Yes
  • Uniform distributed loads: 1000 kg/m²
  • Max raise floor height: 500mm

Compliance:

ISO 27001
PCI DSS

Map and Nearby Locations

Josefstrasse 225
nLighten Sites
Nearby Facilities

Sites within 15 miles of nLighten: Zurich

Distance Site About
0.00 miles Equinix Zurich ZH2 ZH4
0.06 miles Equinix Zürich ZH1
0.99 miles Swisscom Zürich
1.26 miles Hyperscale Data Center Request Dataset
The Google Cloud Region in Zurich was announced in May 2018 and opened in March 2019.
2.25 miles AtlasEdge: Zurich
3.00 miles Equinix Zurich ZH5
3.55 miles Digital Realty: ZUR4
Digital Realty plans to expand its campus near the Swiss capital with a fourth building.
3.57 miles Digital Realty: Zurich
3.59 miles Digital Realty: ZUR2
3.63 miles Green Datacenter Glattbrugg
3.66 miles Digital Realty: ZUR3
4.01 miles Green Datacenter Zurich City (Schlieren)
4.40 miles NTT Zurich 1
The site was opened in June 2011, is located in Rümlang near Zurich.
6.99 miles Green Datacenter Dielsdorf Campus
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland. The 500 million Swiss franc ($561.5 million) project is being built in Dielsdorf, approximately 15 km (9.3 miles) north of Zurich.
7.03 miles Green Datacenter: Dielsdorf Bldg N
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland.
7.08 miles Green Datacenter: Dielsdorf Bldg O
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland.
7.29 miles Vantage: Zurich ZRH3
Vantage plans to build its ZRH3 campus in Zurich on approximately 13 acres of land. The campus may include one or two buildings.
11.02 miles STACK: ZUR03
STACK Infrastructure plans to build another data center in Zurich.
12.21 miles Vantage Zurich ZRH1
12.52 miles NorthC: Winterthur (Zurich)
12.65 miles Vantage: Zurich II
Vantage's second data center in Switzerland is located north of Zurich's city center in Glattfelden. Set on 1 acre, the two-story facility offers a total of 226,000 square feet (21,000 sq m) of space.
14.76 miles STACK ZUR01
15.00 miles Green Datacenter: Zurich West 4
Green Datacenter is expanding its Metro-Campus Zurich West with the construction of its fourth data center.
15.02 miles Green Datacenter Lupig Zurich West 1 + 2
15.06 miles Green Datacenter: Zurich West 3
In 2020, Green Datacenter expanded its Zurich West campus with a new data center building providing 5,500 m² of data center space.

nLighten: Zurich Data Center Photos See all

Operating Company

Operated by:

nLighten is a digital infrastructure platform owned by I Squared Capital, a leading global infrastructure investor. The company is developing innovative edge data centers distributed across European key economic hubs to provide best-in-class network access to regional, national, and global enterprises, private users, and the mobile workforce. Through the strategic distribution of its edge data centers, nLighten is working towards establishing a pan-European presence in all major cities and providing access to low latency and proximity to end users across Europe.
The edge data centers developed by nLighten are designed to meet the increasing demand for faster and more reliable data processing and storage, while also being mindful of environmental impact. nLighten was founded in 2021 by a core team with many years of experience and wide-ranging expertise in the data center sector. The team's main motivation was to create the next step for the data center industry and align edge data centers with the green transition.

nLighten's goal is to build and operate the leading pan-European edge data center platform. The company's focus on strategic locations, low latency, and environmental consciousness positions it as an innovative player in the European digital infrastructure landscape.

Expansion and Acquisitions

nLighten has grown rapidly through both organic growth and strategic acquisitions:

  • In June 2023, the company acquired Euclyde Data Centers, a French regional platform with six carrier-neutral data centers.
  • In September 2023, nLighten completed the acquisition of Proximity Data Centers, a leading UK edge platform with ten carrier-neutral data centers.
  • The company also acquired 10 carrier data center sites from its sister company Exa Infrastructure.
36
Facilities
30
Markets
67MW
Megawatts

News See all

Read nLighten Secures Major Geneva Data Center Services Contract
nLighten Secures Major Geneva Data Center Services Contract

nLighten Secures Major Geneva Data Center Services Contract

May 07, 2026 nLighten

The canton of Geneva, Switzerland, has signed a new data center colocation agreement with nLighten. As detailed in a tender issued by the Geneva Cantonal Office for Information Systems and Digital Technology (OCSIN), the 10-year contract with the European operator’s Swiss subsidiary is worth CHF...

Read more
Read nLighten Will Feed Waste Heat From its Stuttgart Data Center Into the Local District Heating Network
nLighten Will Feed Waste Heat From its Stuttgart Data Center Into the Local District Heating Network

nLighten Will Feed Waste Heat From its Stuttgart Data Center Into the Local District Heating Network

February 13, 2026 nLighten

European Edge data center developer nLighten has signed a deal to connect one of its data centers in the German city of Stuttgart to the city’s district heating network.“The excess heat project with nLighten creates an added value for everyone involved: it delivers climate-friendly heat for our...

Read more
Read Green launches data center campus in Zurich
Green launches data center campus in Zurich

Green launches data center campus in Zurich

January 24, 2023 Zurich

Green has announced the launch of its 46,000 sqm (495,150 sq ft) site new data center campus in the Dielsdorf region in Zurich. According to the Swiss data center operator, the campus, when fully built out, will contain three buildings, namely M, N, and O.Announced back in January 2021,...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?