AtlasEdge: Zurich

Latest Podcast Badenerstrasse 820
Operational
Fully operational facility
Operated by:

AtlasEdge: Zurich

Short Code: ZRH001
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Map and Nearby Locations

Badenerstrasse 820
AtlasEdge Sites
Nearby Facilities

Sites within 15 miles of AtlasEdge: Zurich

Distance Site About
0.97 miles Equinix Zurich ZH5
1.29 miles Swisscom Zürich
1.78 miles Green Datacenter Zurich City (Schlieren)
2.20 miles Equinix Zürich ZH1
2.25 miles nLighten: Zurich
2.25 miles Equinix Zurich ZH2 ZH4
3.42 miles Prime HubInterested in this information?Contact us
The Google Cloud Region in Zurich was announced in May 2018 and opened in March 2019.
4.77 miles Digital Realty: ZUR4
Digital Realty plans to expand its campus near the Swiss capital with a fourth building.
4.78 miles Digital Realty: ZUR2
4.79 miles Digital Realty: ZUR1
4.87 miles Digital Realty: ZUR3
4.88 miles Green Datacenter Glattbrugg
4.99 miles NTT Zurich 1
The site was opened in June 2011, is located in Rümlang near Zurich.
6.05 miles Green Datacenter Dielsdorf Campus
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland. The 500 million Swiss franc ($561.5 million) project is being built in Dielsdorf, approximately 15 km (9.3 miles) north of Zurich.
6.09 miles Green Datacenter: Dielsdorf Bldg N
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland.
6.15 miles Green Datacenter: Dielsdorf Bldg O
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland.
9.40 miles STACK: ZUR03
STACK Infrastructure plans to build another data center in Zurich.
9.54 miles Vantage: Zurich ZRH3
Vantage plans to build its ZRH3 campus in Zurich on approximately 13 acres of land. The campus may include one or two buildings.
12.11 miles Vantage: Zurich II
Vantage's second data center in Switzerland is located north of Zurich's city center in Glattfelden. Set on 1 acre, the two-story facility offers a total of 226,000 square feet (21,000 sq m) of space.
12.73 miles Green Datacenter: Zurich West 4
Green's fourth Lupfig data center: a 30 m building with 5,526 m² of data center space and about 2,000 m² of offices, free cooling, rooftop solar, and waste heat fed to IBB's Naturenergie Eigenamt heating network.
12.76 miles Green Datacenter: Lupfig ZRH1 Expansion
Future data center phases on Green's Lupfig campus beyond Zurich West 4. Green's 2021 plans showed three further buildings at the site, one of which became Zurich West 4.
12.77 miles Green Datacenter: Zurich West 1
Trakt A of Green's original Lupfig building: 3,300 m² of white space on three floors, including a 1,100 m² hall on ABB 380 V DC power distribution, once billed as the world's most powerful DC-powered data center.
12.79 miles Green Datacenter: Zurich West 2
Trakt B of Green's original Lupfig building, attached to Zurich West 1: 3,548 m² of white space in 8,330 m² gross floor area, with ammonia free-cooling chillers and an ABB hybrid power supply.
12.81 miles Green Datacenter: Zurich West 3
Switzerland's first high-density colocation building: a six-storey, CHF 70 million data center on Green's Lupfig campus with 3,600 m² of white space for up to 25 kW per rack.
14.07 miles NorthC: Winterthur (Zurich)
14.67 miles STACK ZUR01
15.26 miles Vantage: ZRH13
ZRH13 is the third planned data center on Vantage's Zurich I campus in Winterthur.
15.32 miles Vantage: ZRH12
ZRH12 is the second data center on Vantage's Zurich I campus in Winterthur.
15.36 miles Vantage: ZRH11
ZRH11 is the first data center on Vantage's Zurich I campus in Winterthur.

Operating Company

Operated by:

AtlasEdge Data Centres is a joint venture between Liberty Global and which plans to launch with approximately 100 Edge data centers across Europe. The JV will combine Digital Colony’s Edge assets and Liberty Global's real estate portfolio.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read AtlasEdge Begins Next Expansion Phase of Hamburg Data Center
AtlasEdge has started the next expansion phase of its HAM002 data center in Ahrensburg, Germany. The phase will add 3.2MW of capacity, with the four-stage project set to reach 20MW across 10,000 sq...

AtlasEdge Begins Next Expansion Phase of Hamburg Data Center

August 05, 2026 AtlasEdge

AtlasEdge has started the next expansion phase of its HAM002 data center in Ahrensburg, Germany. The phase will add 3.2MW of capacity, with the four-stage project set to reach 20MW across 10,000 sqm (107,640 sq ft) when complete. The facility’s first 4.4MW phase opened in 2024 and is nearly fully...

Read more
Read AtlasEdge Breaks Ground on Second Leverkusen Data Center
AtlasEdge Breaks Ground on Second Leverkusen Data Center

AtlasEdge Breaks Ground on Second Leverkusen Data Center

April 16, 2026 AtlasEdge

European data center firm AtlasEdge is expanding its footprint in Germany with a new project. The company this week announced plans for a new facility in Leverkusen. LEV002 will deliver 4.4MW of capacity across 3,400 sqm (36,595 sq ft). Construction is already underway, with the first phase...

Read more
Read AtlasEdge Sells Nine Data Centers Across Europe to Spanish Operator Templus
AtlasEdge Sells Nine Data Centers Across Europe to Spanish Operator Templus

AtlasEdge Sells Nine Data Centers Across Europe to Spanish Operator Templus

December 22, 2025 AtlasEdge

European Edge data center company AtlasEdge has sold a portfolio of facilities to Spanish operator Templus.The companies announced the deal this week, with nine data centers trading hands. Templus will be taking over data centers in Madrid and Barcelona, Spain; Milan, Italy; Zurich, Switzerland;...

Read more
Read AtlasEdge Secures €253m Financing for Data Center Expansion in Lisbon, Portugal
AtlasEdge Secures €253m Financing for Data Center Expansion in Lisbon, Portugal

AtlasEdge Secures €253m Financing for Data Center Expansion in Lisbon, Portugal

November 01, 2025 AtlasEdge

European data center operator AtlasEdge this week announced it has secured €253 million ($294.8m) in green financing to support the development of its campus in Lisbon. The funds will be used to build out the first and second buildings at the company's new campus, delivering a 21.1MW capacity...

Read more
Read AtlasEdge names Tesh Durvasula as CEO
AtlasEdge names Tesh Durvasula as CEO

AtlasEdge names Tesh Durvasula as CEO

May 22, 2024 AtlasEdge

European Edge provider AtlasEdge has appointed Tesh Durvasula as CEO to succeed Giuliano Di Vitantonio, who will move into the role of chairman of the AtlasEdge board. “It has been a true privilege to lead AtlasEdge through its first chapter. Since launching in late 2021, we have built a data...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?