|
0.03 miles
|
Green Datacenter: Zurich West 4
|
Green's fourth Lupfig data center: a 30 m building with 5,526 m² of data center space and about 2,000 m² of offices, free cooling, rooftop solar, and waste heat fed to IBB's Naturenergie Eigenamt heating network.
|
|
0.04 miles
|
Green Datacenter: Zurich West 2
|
Trakt B of Green's original Lupfig building, attached to Zurich West 1: 3,548 m² of white space in 8,330 m² gross floor area, with ammonia free-cooling chillers and an ABB hybrid power supply.
|
|
0.05 miles
|
Green Datacenter: Zurich West 1
|
Trakt A of Green's original Lupfig building: 3,300 m² of white space on three floors, including a 1,100 m² hall on ABB 380 V DC power distribution, once billed as the world's most powerful DC-powered data center.
|
|
0.06 miles
|
Green Datacenter: Zurich West 3
|
Switzerland's first high-density colocation building: a six-storey, CHF 70 million data center on Green's Lupfig campus with 3,600 m² of white space for up to 25 kW per rack.
|
|
8.64 miles
|
STACK: ZUR03
|
STACK Infrastructure plans to build another data center in Zurich.
|
|
10.99 miles
|
Green Datacenter Zurich City (Schlieren)
|
|
|
11.99 miles
|
Green Datacenter: Dielsdorf Bldg N
|
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland.
|
|
11.99 miles
|
Green Datacenter Dielsdorf Campus
|
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland. The 500 million Swiss franc ($561.5 million) project is being built in Dielsdorf, approximately 15 km (9.3 miles) north of Zurich.
|
|
11.99 miles
|
Green Datacenter: Dielsdorf Bldg O
|
Green Datacenter's second data center campus is located at Zurich Metro, Dielsdorf, Switzerland.
|
|
12.04 miles
|
Equinix Zurich ZH5
|
|
|
12.76 miles
|
AtlasEdge: Zurich
|
|
|
14.02 miles
|
Swisscom Zürich
|
|
|
14.95 miles
|
Equinix Zürich ZH1
|
|
|
15.00 miles
|
Equinix Zurich ZH2 ZH4
|
|
|
15.00 miles
|
nLighten: Zurich
|
|
|
15.18 miles
|
Vantage: Zurich II
|
Vantage's second data center in Switzerland is located north of Zurich's city center in Glattfelden. Set on 1 acre, the two-story facility offers a total of 226,000 square feet (21,000 sq m) of space.
|
|
15.36 miles
|
NTT Zurich 1
|
The site was opened in June 2011, is located in Rümlang near Zurich.
|
|
16.17 miles
|
Center BetaInterested in this information?Contact us
|
The Google Cloud Region in Zurich was announced in May 2018 and opened in March 2019.
|
|
16.17 miles
|
Digital Realty: ZUR2
|
|
|
16.20 miles
|
Digital Realty: ZUR4
|
Digital Realty plans to expand its campus near the Swiss capital with a fourth building.
|
|
16.21 miles
|
Digital Realty: ZUR1
|
|
|
16.24 miles
|
Digital Realty: ZUR3
|
|
|
16.29 miles
|
Green Datacenter Glattbrugg
|
|
|
18.79 miles
|
STACK ZUR01
|
|