Bitfarms and T5 to Develop Data Center in Pennsylvania
August 06, 2025
T5 Data Centers
T5 acquired the facility from Apple in 2020.
In 2006, Apple acquired the site for $50 million. It was originally built for MCI WorldCom, but was never occupied likely because of MCI's bankruptcy disrupted their plans for the site.
| Distance | Site | About |
|---|---|---|
| 0.02 miles | Hyperscale Data Center Request Dataset |
While Apple sold the property to T5 Data Centers in October 2020, it continues to operate there as a tenant.
|
| 0.15 miles | T5@Silicon Valley Bldg 2 |
T5 plans to develop an additional three-story 180,000 SF data center building on its Silicon Valley campus.
|
| 4.08 miles | Hurricane Electric Fremont 1 |
2 Internet Exchange Points (SFMIX and AMS-IX Bay)
20 Internet Networks
6 Carriers with Diverse Fiber
|
| 4.97 miles | Verizon: Fremont |
The site is a previous XO Communications facility
|
| 5.20 miles | Hurricane Electric Fremont 2 |
3 Internet Exchange Points (SFMIX, AMS-IX Bay, and FCIX)
70 Internet Networks
7 Carriers with Diverse Fiber
|
| 6.10 miles | Terra Ventures: San Jose, CA |
Terra Ventures has revised its plans for a 9.3-acre site in Alviso, North San Jose.
|
| 6.27 miles | Vantage: Nortech Parkway |
In 2023, Vantage outlined plans to build a data center on a 9.8-acre plot in San Jose's Alviso area.
|
| 6.61 miles | Prologis: San Jose 4 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 6.65 miles | Equinix Sunnyvale SV4 | |
| 6.67 miles | Prologis: San Jose 3 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 6.72 miles | Prologis: San Jose 2 |
This facility is part of Prologis' data center campus in San Jose, California.
|
| 6.77 miles | Prologis: San Jose, California |
Prologis’ Sustainable Technology, Engineering and Manufacturing (STEM) Park is a landmark 159-acre development in North San Jose designed to anchor the region’s growing AI and semiconductor sectors.
|
| 6.84 miles | Hyperscale Data Center Request Dataset |
Microsoft is developing a new data center campus on a 64.59-acre site in the Alviso neighborhood of Northern San Jose.
|
| 7.08 miles | Hyperscale Data Center Request Dataset |
This facility will be part of Microsoft's Alviso Way Campus in San Jose, California.
|
| 7.09 miles | 400 Holger Way, San Jose | |
| 7.36 miles | DataBank Santa Clara SFO1 |
|
| 7.66 miles | Equinix Sunnyvale SV6 |
|
| 7.70 miles | Menlo: MD-SV1 (Sunnyvale) |
Acquired in January 2022, this fully entitled 8.9-acre development site in Sunnyvale, CA features (1) two-story building totaling approximately 244,214 square feet served by an on-site substation.
|
| 7.78 miles | Centersquare: Santa Clara SF02 |
|
| 7.78 miles | 4700 Old Ironsides | |
| 7.85 miles | 4650 Old Ironsides | |
| 7.85 miles | Centersquare: SF02 DC2 |
|
| 7.86 miles | Astound: Mountain View | |
| 8.12 miles | QTS Santa Clara |
QTS's Santa Clara campus has two distinct data center buildings
|
| 8.20 miles | China Telecom Santa Clara | |
| 8.27 miles | ECL MV1 | |
| 8.50 miles | Hyperscale Data Center Request Dataset |
This planned facility will be a part of Amazon's 2305 Mission College Blvd Campus. The data center will span 229,974 sqft (21,365 sq m) of space.
|
| 8.51 miles | Hyperscale Data Center Request Dataset |
The project will span two data center buildings, the first spanning 285,768 square feet (26,548 sq m), and the second 229,974 square foot (21,365 sq m).
|
| 8.59 miles | CoreSite Milpitas SV2 | |
| 8.61 miles | Evocative Santa Clara SJC11 |
Formerly known as Internap Santa Clara SJE-011 before being acquired in September 2022 by Evocative
|
| 8.71 miles | Intel Santa Clara D2P3 |
The facility uses close-coupled evaporative cooling that relies on recycled water, to help it to reach an annualized PUE of 1.06.
|
| 8.75 miles | 2950 Zanker |
The building is 100% leased on a long-term basis to a major telecommunications company.
|
| 8.88 miles | EdgeCore: SV02 |
EdgeCore's Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
| 8.95 miles | EdgeCore Silicon Valley |
EdgeCore Silicon Valley campus is located at 2201 Laurelwood Road, Santa Clara.
|
| 9.10 miles | NaviSite Santa Clara |
|
| 9.25 miles | Equinix Santa Clara SV17 |
|
| 9.30 miles | Equinix Santa Clara SV16 |
|
| 9.31 miles | CoreSite SV8 |
CoreSite completed construction on SV8 phases I and 2 in the second half of 2019
|
| 9.32 miles | Equinix Santa Clara SV15 |
|
| 9.36 miles | Digital Realty: SJC35 |
Located near Highway 101, 3205 Alfred is a two-story data center. The facility is strategically located near three cost-effective substations on the power grids of Silicon Valley Power.
|
| 9.36 miles | Equinix Santa Clara SV14 |
|
| 9.38 miles | CoreSite SV6 | |
| 9.39 miles | CoreSite SV7 | |
| 9.40 miles | OpenColo | |
| 9.40 miles | CoreSite SV4 | |
| 9.41 miles | Digital Realty: SJC30 | |
| 9.41 miles | CoreSite Santa Clara Campus |
CoreSite's Santa Clara Campus contains 5 datacenter buildings. (SV3, SV4, SV5, SV6, SV7 and SV8)
|
| 9.41 miles | Stack: SVY01D |
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
|
| 9.43 miles | Equinix Santa Clara SV2 | |
| 9.44 miles | StratCap: 3205 Bassett |
StratCap acquired a purpose-built data center in Santa Clara that is 100 percent leased to a ‘top-tier wireless carrier,’ and serves as a network switch facility.
|
| 9.46 miles | CoreSite SV3 | |
| 9.47 miles | CoreSite SV5 | |
| 9.48 miles | Astound: Santa Clara | |
| 9.48 miles | CoreSite SV9 |
CoreSite opened its ninth Santa Clara data center, known as SV9, in 2025.
|
| 9.48 miles | Evocative: Santa Clara, SJC3 |
Evocative's Santa Clara Data Center (SJC3), located at 3080 Raymond St, Santa Clara, CA , was constructed in 1980. Spanning an impressive 15000 square feet, this colocation site offers ample space to accommodate various data center operations and infrastructure requirements.
|
| 9.50 miles | Stack: SVY01C |
Stack is expanding its data center campus in San Jose, California to build two data centers on a plot at 2400 Ringwood Avenue and 1849 Fortune Drive in Santa Clara County.
|
| 9.50 miles | STACK Silicon Valley SVY01 |
Phase I supports 9.3 MW of critical power
|
| 9.50 miles | Element Critical SV1 |
|
| 9.51 miles | Centersquare: SF03 DC2 |
|
| 9.51 miles | Lumen Sunnyvale 1 |
|
| 9.55 miles | Colovore: SJC02 |
Colovore's second high-density, liquid-cooled data center is located immediately adjacent to its first data center in Santa Clara.
|
| 9.55 miles | Centersquare: Sunnyvale SF03 |
|
| 9.56 miles | Vantage: CA13 |
CA13 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 9.56 miles | STACK SVY01B |
Stack Infrastructure has launched a 32MW SVY01B facility on its Silicon Valley campus in California
|
| 9.56 miles | Vantage: CA16 |
CA16 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 9.56 miles | H5: Silicon Valley |
|
| 9.57 miles | ColoXchange Sunnyvale | |
| 9.57 miles | Equinix San Jose SV13 |
|
| 9.57 miles | Overton Moore Properties: 2334 Lundy Place |
Currently leased to a Triple Net customer, NTT Communications.
|
| 9.58 miles | Lumen Santa Clara |
|
| 9.59 miles | Colovore: Santa Clara SJC01 |
Colovore launched its first single-story, 24,000-square-foot (2,230-square-meter) facility in Santa Clara in 2014, with its most recent expansion announced in February 2022.
|
| 9.60 miles | Vantage: CA15 |
CA15 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 9.60 miles | Bowers Data Center |
GI Partners has secured planning permission to demolish an existing office property and develop a new four-story data center in Santa Clara, California.
|
| 9.61 miles | Csquare: SFO4-B | |
| 9.61 miles | Digital Realty: SJC34 |
This site was acquired through the Telx acquisition and is part of the Vantage Campus in Santa Clara.
|
| 9.61 miles | Csquare: Santa Clara SF04 |
CenterSquare's SFO4 carrier-neutral data center campus is located just minutes from San Jose International Airport.
|
| 9.62 miles | Vantage: Santa Clara CA1 |
Vantage's CA1 campus consists of six multi-story data centers on 21 acres, offering more than 335,000 square feet of data center space.
|
| 9.62 miles | Digital Realty: SJC14 | |
| 9.63 miles | Digital Realty: SJC29 |
The building, renovated in 2010, houses three 1,125 kW data rooms and is equal to a power density of 160 watts per raised square foot.
|
| 9.64 miles | Goodman Innovation Bldg2 |
|
| 9.64 miles | Goodman Innovation Centre San Jose |
Logistics firm Goodman is set to enter the Silicon Valley data center market. The company confirmed the acquisition of a 45.8-acre site in San Jose for $200 million (bought from an affiliate of LBA Realty in October 2025).
|
| 9.64 miles | Tata San Francisco | |
| 9.64 miles | Digital Realty: Silicon Valley SJC10 |
Digital Realty acquired the 3 story facility in 2006. Telx formerly operated the building MMR. Digital Realty acquired Telx in 2015.
|
| 9.65 miles | Vantage: CA14 |
CA14 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 9.66 miles | Evocative Santa Clara SJC14 |
|
| 9.66 miles | Digital Realty: SJC16 | |
| 9.67 miles | Prime: 1231 Comstock |
Prime Data Centers is developing a new four-story, 119,000 square-foot data center. Located at 1231 Comstock Street.
|
| 9.68 miles | Digital Realty: SJC11 |
|
| 9.68 miles | Digital Realty: SJC15 |
The facility was renovated in 2008 and provides IT services customer with 2,250 kW of critical IT power
|
| 9.68 miles | Vantage: CA12 |
CA12 data center building is a part of Vantage's Santa Clara CA1 Campus in Silicon Valley.
|
| 9.70 miles | Prime Santa Clara |
Located in the heart of Silicon Valley, this new Santa Clara data center facility will be delivered as turn-key, or is available as powered shell, with 10 MW of critical power with N+1 configuration and up to 14MW of critical power with N configuration.
|
| 9.73 miles | Vantage: Santa Clara CA3 |
Vantage Data Centers' third Silicon Valley campus, CA3, is a four-story facility spanning over 486,000 square feet.
|
| 9.75 miles | Centersquare: Santa Clara SF01 |
|
| 9.75 miles | 2401 Walsh - Digital Realty |
Currently leased to a Triple Net customer.
|
| 9.75 miles | AT&T Palo Alto | |
| 9.76 miles | Connect Data Centers: Santa Clara, CA |
Harrison Street Real Estate Capital LLC and Oppidan Investment Co. have partnered to develop a 200,000-square-foot data center in Santa Clara, near Mineta San Jose International Airport.
|
| 9.80 miles | Equinix Palo Alto SV8 |
Equinix SV8 is the home of the legendary Palo Alto Internet Exchange.
|
| 9.80 miles | Menlo: Bryant Street Landlord | |
| 9.80 miles | Hyperscale Data Center Request Dataset |
Amazon has acquired a former insulation factory located at 960 Central Expressway just west of San Jose Mineta International Airport in Santa Clara, California.
|
| 9.80 miles | 2403 Walsh - Digital Realty |
Currently leased to a Triple Net customer.
|
| 9.80 miles | Centersquare: Santa Clara SF01 DC2 |
|
| 9.84 miles | Hyperscale Data Center Request Dataset |
Microsoft plans to build two five-story data centers near the corner of Component Drive and Orchard Parkway in North San Jose. In 2021, LBA sold about 21.3 acres to Microsoft for $78.7 million.
|
| 9.94 miles | Digital Realty: SJC31 |
|
| 10.00 miles | NTT Silicon Valley SV1 |
A 160,000 sq. ft., four-story data center built on a 3.3 acre site
|
| 10.07 miles | Digital Realty: SJC37 | |
| 10.08 miles | Prime: 2225 Martin |
Prime Data Centers is planning to build a 207,000 sq ft (19,230 sqm) facility nearby at 2225 Martin Street in Santa Clara, CA.
|
| 10.09 miles | Prime Hayward |
This 20MW two-story flex building comprising 145,850 square feet on 4 acres is 100% leased by a leading Fortune 50. The property was built in 2015 as a build-to-suit.
|
| 10.13 miles | Prime Santa Clara (Martin) | |
| 10.23 miles | Cologix Santa Clara |
In 2021, Data center provider Cologix added its first major presence on the U.S. West Coast, acquiring this data center campus in Santa Clara, Calif. from vXchnge.
|
| 10.33 miles | Cyrusone Santa Clara |
|
| 10.33 miles | EdgeConneX Santa Clara |
|
| 10.40 miles | EdgeConneX: 1600 Memorex |
Expansion site
|
| 10.45 miles | Equinix San Jose SV3 | |
| 10.51 miles | Vantage: Santa Clara CA2 |
The Vantage's long-term plan calls for four data center buildings totaling 560,000 square feet and 55 megawatts of critical load.
|
| 10.52 miles | Vantage: CA23 |
Vantage CA23 data center building is a part of Vantage's second Santa Clara Campus. The building spans 200,000 sq ft (18,500 sq m) of data center space and came online in 2021.
|
| 10.54 miles | Vantage: CA22 |
Vantage CA22 data center building is a part of Vantage's second Santa Clara Campus.
|
| 10.55 miles | Skybox Santa Clara |
|
| 10.56 miles | STACK SVY02A |
STACK Infrastructure is constructing a new data center facility at 1200 Memorex Drive, located in an industrial corner of Santa Clara. The four-story data center will contain 472,920 square feet.
|
| 10.70 miles | 2045 & 2055 Lafayette - Digital Realty |
Digital Realty acquired the facility in 2004 and fully leased it to Savvis. In 2007, Microsoft acquired that lease and is now the sole tenant of the facility.
|
| 10.72 miles | Santa Clara (SC1) Digital Realty |
|
| 10.90 miles | CloudHQ: Santa Clara SJC1 |
CloudHQ's SJC1 data center will be a multi-story facility designed to accommodate various deployment types.
|
| 11.33 miles | Lumen Hayward 1 | |
| 11.57 miles | AT&T Hayward | |
| 12.86 miles | 365 San Jose | |
| 12.87 miles | Evocative: SJC7 |
|
| 13.03 miles | Arena Investors: Bassett AI R&D |
Spanning 281,800 sq ft, the development will feature lab and office spaces, three floors of data halls, IT white space, an on-site substation, generators, and a rooftop cooling plant.
|
| 13.29 miles | Cerulean San Jose |
|
| 13.30 miles | Fibernet San Jose |
|
| 13.57 miles | CoreSite SV1 55 S Market |
55 S Market is a legacy Carrier Hotel in San Jose
|
| 13.57 miles | Hurricane San Jose |
Multiple racks in cages in the same building as CoreSite Any2 San Jose
20+ Carriers with Diverse Fiber In Building
|
| 13.57 miles | HostPapa SJ1 |
SJ1 is located within CoreSite's 55 S Market building which is a legacy telecom and Internet hub.
|
| 13.67 miles | 150 S 1st |
|
| 13.71 miles | Rackspace San Jose SJC2 |
Colocated within the Digital Reality's building
|
| 18.13 miles | Sierra Morena Tower |
Sierra Morena Tower is a historical AT&T Long Line facility that now operates as a carrier-neutral communication and technology hub.
|
August 06, 2025
T5 Data Centers
August 31, 2024
T5 Data Centers
May 04, 2024
T5 Data Centers
November 20, 2023
San Francisco Bay Area
November 19, 2023
San Francisco Bay Area
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas