QTS: Phoenix II Campus

Latest Podcast 1200 40th Street
Operational
Fully operational facility
Operated by:

QTS: Phoenix II Campus

Short Code: PHX2 DC1
Year Built: 2023
Floors: 3
Lot Size: 84 acres
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

QTS Phoenix Data Center Campus (PHX II) sits on an 85-acre site with 5 data center buildings.

Map and Nearby Locations

1200 40th Street
QTS Data Centers Sites
Nearby Facilities

QTS: Phoenix II Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of QTS: Phoenix II Campus

Distance Site About
0.10 miles QTS: PHX2 DC3
PHX2 DC3 data center building is a part of QTS' Phoenix Campus.
0.17 miles QTS: PHX2 DC2
PHX2 DC2 data center building will be a part of QTS' Phoenix Campus.
0.19 miles Stack: PHX02C
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
0.20 miles QTS: PHX2 DC4
PHX2 DC4 data center building is a part of QTS' Phoenix Campus.
0.23 miles Stack: PHX02D
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
0.27 miles QTS: PHX2 DC5
PHX2 DC5 data center building is a part of QTS' Phoenix Campus. QTS broke ground on this data center in 2023.
0.31 miles Stack: PHX02B
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
0.31 miles Stack: PHX02E
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
0.38 miles STACK Phoenix PHX02 Campus
STACK Infrastructure plans to develop a five-building, 246MW campus in the heart of central Phoenix, Arizona. The more than 1.7 million square foot campus will run on 100% renewable energy.
1.24 miles Centersquare: Phoenix PH1
1.29 miles Internap Phoenix
1.29 miles Iron Mountain Phoenix
Iron Mountain acquired the site in January 2018 in a $1.34 Billion acquisition of IO Datacenter's operations in the United States which included 4 sites (Phoenix, Scottsdale, Edison New Jersey, and Columbus Ohio) 41-acre Iron Mountain Hyperscale-Ready campus 588,000 gross square feet 32 MW – redundant feeds
1.29 miles Iron Mountain: AZP2
In 2019, Iron Mountain completed the first phase of AZP-2 in Phoenix.
1.33 miles DataBank PHX2
1.47 miles Iron Mountain: AZP3
Iron Mountain's AZP-3 data center is located in Phoenix, Arizona.
2.50 miles Verizon: 3930 Watkins
This facility is a former XO Communications site. In 2017, Verizon completed the $1.8 billion acquisition of XO Communications' fiber-optic network business.
2.97 miles Windstream Phoenix
Located in Phoenix, Arizona, this 4,400 square foot Phoenix data center is designed to serve the businesses in the Southwest. The facility was previously a PAETEC data center.
3.15 miles Lumen Phoenix 1
3.17 miles PhoenixNAP-Phoenix
PhoenixNAP is a local provider which operates the data center campus, located east of downtown near Phoenix Sky Harbor International Airport.
3.24 miles PhoenixNAP: PHX02
PhoenixNAP will expand its Phoenix data center campus with a second building, PHX02, slated for construction in late 2025.
3.66 miles GoDaddy: Gilbert, AZ
GoDaddy’s own data center in Phoenix is more than 270,000 square feet in size. The data center features
eight data halls, 11 diesel backup generators, room for eight more pods.
4.34 miles 120 E Van Buren - Digital Realty
120 E Van Buren is Phoenix's carrier hotel and the building is the best connected in Phoenix. The building is also home to many colocation operators including AIS, QTS, Sungard, XO
4.34 miles LightEdge: Phoenix Van Buren
4.34 miles QTS Phoenix Van Buren
QTS acquired this site via the Carpathia acquisition in 2015.
4.47 miles Lumen Phoenix 2
4.73 miles DataBank Phoenix PHX1
4.77 miles eBay Arizona
eBay's data center is also known as Project Mercury.
4.81 miles EdgeConneX Phoenix
4.93 miles Metrobloks: Phoenix PHX-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the heart of downtown Phoenix, with live capacity scheduled for Q2 2027.
6.93 miles Liquid Web Phoenix
7.14 miles 5CDC: Phoenix PHX01
5C Data Centers is building a data center campus in Phoenix, Arizona. The first facility, PHX01, sits at 2802 W Palm Lane, a few miles west of downtown Phoenix, and is currently under construction.
8.44 miles Centersquare: PHX1
Centersquare's Phoenix Mesa is cloud-enabled data center located just 10 miles from Phoenix Sky Harbor Airport, with more than 154,000 sq. ft. of space.
9.77 miles 2055 E Technology - Digital Realty
Located in the Arizona State University Research Park and downtown Phoenix Central Business District, the facility was redeveloped in 2007. Digital Realty's 76,000 square foot data center at 2055 E. Technology Circle is approximately 15 miles away from downtown Phoenix. The building is SOC2 certified with 24/7 security and critical facilities management.
9.79 miles Expedient Phoenix
In 2021, Five 9s Digital acquired the 46,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield, and subsequently leased it to Expedient.
9.79 miles Five 9s: Blue Shield Phoenix
In 2021, Five 9s Digital acquired the 45,000 sq ft data center located at 2475 West Townley Avenue in Phoenix, Arizona, which was previously owned by Blue Cross Shield.
9.90 miles 2010 East Centennial
Digital Realty sold the office & data center building in 2018 to an unnamed company. We believe Fox Sports is the tenant.
10.36 miles Menlo: MD-PX1 Bldg4
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
10.37 miles Menlo: MD-PX1 Bldg5
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
10.43 miles Menlo: MD-PX1 Bldg2
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
10.45 miles Menlo: MD-PX1 Bldg3
This facility is part of Menlo Digital's MD-PX1 data center campus in Phoenix.
10.49 miles Menlo: MD-PX1 (Phoenix)
Menlo Digital's MD-PX1 (Phoenix) data center campus consists of five buildings on 38 acres. The campus will span 1,022,400 square feet.
12.25 miles US Signal Phoenix AZ01
12.71 miles 11:11 Systems: Scottsdale
The 11:11 Systems Scottsdale data center, originally operated by Sungard Availability Services, was acquired by 11:11 Systems in November 2022.
12.78 miles Internap Phoenix 2500 W Frye Rd
American cloud and colocation provider Internap (INAP) has taken a master lease in a 150,000 square foot data center in Chandler, near Phoenix, Arizona.
12.80 miles Lincoln: Chandler, AZ
Real estate firm Lincoln Property Company reacquired its data center in Phoenix, Arizona, in 2025.
12.87 miles Lincoln: Chandler Bldg-2
Lincoln Property's three-story, 243,000 sq ft expansion building is part of a future development plan that was approved by the City of Chandler under the previous owner.
13.35 miles Hyperscale Data Center Request Dataset
Amazon Data Services has acquired land for a potential data center campus in Laveen, Phoenix. The 220-acre site, located near Loop 202 and Dobbins Road, was purchased for $277 million ($1.2 million per acre).
13.97 miles Centersquare: Phoenix PH2
13.99 miles LexisNexis Scottsdale
13.99 miles Iron Mountain Scottsdale
Arizona Public Service, the electric utility provider, serves the site with 24MW of utility power
14.13 miles 1900 S Price - Digital Realty
The Building is 1 story Flood Zone: Zone X Seismic Zone: Zone 1
14.24 miles H5 Phoenix
H5 acquired the site when it bought NextFort in January 2016H5 acquired the site when it bought NextFort in January 20
14.32 miles 2121 S Price - Digital Realty
In 2010, DRT acquired this site from 365 Main portfolio.
14.37 miles Aligned: Peoria Logistics Park
Aligned Data Centers firm acquired nearly 80 acres at the Peoria Logistics Park for $43.2 million in Peoria.
14.53 miles CyrusOne PHX9
14.56 miles CyrusOne PHX10
14.63 miles CyrusOne PHX2
14.66 miles CyrusOne PHX3
14.66 miles Aligned: PHX-04
Aligned Energy's PHX04 site is located at the NEC of Price Road and Innovation Street. The data center spans 396,343 sqft.
14.73 miles CyrusOne Chandler Phoenix Campus
CyrusOne plans to build nearly 2 million square-feet data center campus. There are two buildings on the campus currently
14.73 miles CyrusOne PHX1
14.79 miles CyrusOne PHX5
14.84 miles CyrusOne PHX4
14.87 miles Aligned: PHX-06
PHX06 is a two-phase development that will total 456,946 SqFt
14.90 miles CyrusOne PHX6
14.91 miles DataCanopy: Phoenix, AZ
14.94 miles CyrusOne PHX8
15.00 miles CyrusOne PHX7
15.16 miles Evocative: PHX1
15.16 miles Aligned Phoenix
Aligned's PHX-01/02/03 data center campus in Union Hills, Phoenix, AZ, spans 550,000 sq ft with 180 MW of capacity.
15.93 miles Aligned: PHX-08
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
15.99 miles Aligned: PHX-09
In September 2022, Aligned acquired a pair of adjacent Deer Valley office buildings at 3151 and 3202 W. Behrend Drive from Griffin Realty Trust.
16.16 miles 20435 N 26th
16.25 miles NexusTek Phoenix
NexusTek Acquired Phoenix-based CyberTrails in 2017.
16.49 miles Flexential Phoenix Deer Valley
Flexential's Phoenix site is former ViaWest. A and B source power circuit delivery capabilities Multiple medium voltage utility power feeds
18.18 miles Prime: PHX01-05
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
18.25 miles Prime: PHX01-04
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
18.31 miles Prime: PHX01-03
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
18.38 miles Prime: PHX01-02
This facility is one of five planned data center buildings in Prime's Phoenix Campus.
18.39 miles QTS: Hermosa Ranch
US data center firm QTS has acquired 206 acres in the West Valley for $246.8 million in an all-cash deal in July, 2024 from TGV Investments LLC.
18.44 miles Prime Phoenix
The Phoenix Campus is expected to be 1.3 million square feet across 5 data center buildings.
19.87 miles Hyperscale Data Center Request Dataset

QTS: Phoenix II Campus Data Center Photos See all

Rendering of QTS Phoenix
Source: QTS
Rendering of the 5 building campus
Source: QTS
View of the almost completed facility in 2020
Source: Baxtel

Operating Company

Operated by:

QTS Data Centers is a privately held data center company owned by funds managed by Blackstone, with corporate headquarters in Overland Park, Kansas. It provides colocation, custom data center and managed services, along with carrier-neutral connectivity across its platform.

QTS operates sites in the United States and in the Netherlands. The company expanded its footprint with acquisitions in Chicago and Princeton in 2014, added government and managed hosting capabilities with the Carpathia acquisition in 2015, and entered the Netherlands market in 2019. QTS became a public company in 2013 and was taken private in 2021.

History:

  • On August 31, 2021 funds managed by Blackstone completed the acquisition of QTS Realty Trust.
  • April 30, 2019: Acquired two operating data centers in Groningen and Eemshaven, Netherlands, for approximately $44 million.
  • June 2015: QTS acquires Carpathis Hosting for $326 million. The transaction increases QTS's ability to serve IaaS and Government clients. Additionally the transaction provides a number of deployments within Equinix facilities.
  • July 8, 2014: Acquired the former Chicago Sun-Times printing plant for conversion to a data center.
  • June 30, 2014: Acquired the Princeton, New Jersey data center from McGraw Hill Financial.
  • 2013: Went public (IPO) and started trading under the symbol QTS on the NYSE.
  • 2010 Acquired their Richmond facility
  • 2005 QTS acquired Atlanta Suwanee data center
  • 2003: Company acquired its first data center in Overland Park, KS
  • 2003: QTS was founded by Chad Williams with its first data center in Overland Park in Kansas
167
Facilities
33
Markets

News See all

Read QTS Drops Plan for Data Center near Madison, Wisconsin
QTS Drops Plan for Data Center near Madison, Wisconsin

QTS Drops Plan for Data Center near Madison, Wisconsin

January 30, 2026 QTS Data Centers

QTS has backed off plans to develop a data center near Madison, Wisconsin, after pushback from local officials. The company has dropped plans for a campus in the Village of DeForest after the village announced its intention to deny an annexation request related to the project.“After individual...

Read more
Read QTS Starts Preparation for $13bn UK data center
QTS Starts Preparation for $13bn UK data center

QTS Starts Preparation for $13bn UK data center

October 10, 2025 QTS Data Centers

QTS has begun site work on a massive data center project in Northumberland, UK which could see an investment of up to £10 billion ($13.2bn) across 10 facilities if fully built out. This March, the project received outline planning permission from the local council. After initially being pitched...

Read more
Read QTS Plans Data Center in Forssa, Finland
QTS Plans Data Center in Forssa, Finland

QTS Plans Data Center in Forssa, Finland

August 20, 2025 QTS Data Centers

Data center firm QTS is expanding its European footprint with plans for a campus in Finland. The City of Forssa signed a preliminary agreement earlier this year with QTS for more than 100 hectares of land in Ratasmäki. "The interest of a large investor like Blackstone in Forssa is very good news....

Read more
Read QTS Breaks Ground on Data Center in Iowa
QTS Breaks Ground on Data Center in Iowa

QTS Breaks Ground on Data Center in Iowa

August 13, 2025 QTS Data Centers

QTS has officially announced plans for a new data center campus in Cedar Rapids, Iowa. The campus could support up to seven data center buildings at full build-out and see up to $10 billion invested.Tag Greason and David Robey, co-CEOs of QTS, said: “From day one, we believe in being a good...

Read more
Read Phoenix to clamp down on data centers
Phoenix to clamp down on data centers

Phoenix to clamp down on data centers

January 02, 2025 Phoenix

The city of Phoenix in Arizona is set to clamp down on data centers. The City Council has approved a series of changes to better regulate data center growth in the city, including regulating locations and external design specifications.The vote, which took place on December 10, targeted...